Created (ET) |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) ▼ |
Actions |
23-Jul-2025 ET |
2025 |
741 |
1 |
TGbn |
MAC-PDT-CR-37_11_4 |
Sherief Helwa (Qualcomm) |
23-Jul-2025 03:14:38 ET |
Download |
23-Jul-2025 ET |
2025 |
1283 |
0 |
TGbn |
CC50 CR for CID 3520, 3521 and 3522 |
Eunsung Park (LG Electronics) |
23-Jul-2025 03:05:34 ET |
Download |
23-Jul-2025 ET |
2025 |
753 |
3 |
TGbn |
PDT MAC on Seamless Roaming Part 3 |
Duncan Ho (Qualcomm Technologies, Inc.) |
23-Jul-2025 03:00:25 ET |
Download |
23-Jul-2025 ET |
2025 |
739 |
1 |
TGbn |
On Interference Mitigation Pilots |
Jiqing Ni (OPPO) |
23-Jul-2025 02:50:50 ET |
Download |
23-Jul-2025 ET |
2025 |
636 |
7 |
TGbn |
Joint PDT CR Trigger Frame Format Part 5 |
Alice Chen (Qualcomm) |
23-Jul-2025 02:44:19 ET |
Download |
23-Jul-2025 ET |
2025 |
1166 |
2 |
TGbn |
CC50 CR for misc CIDs in 38.5 |
Rui Cao (NXP) |
23-Jul-2025 02:32:28 ET |
Download |
23-Jul-2025 ET |
2025 |
892 |
2 |
TGbn |
PDT PHY ELR CR 322 |
Rethna Pulikkoonattu (Broadcom Inc) |
23-Jul-2025 02:27:52 ET |
Download |
23-Jul-2025 ET |
2025 |
892 |
1 |
TGbn |
PDT PHY ELR CR 322 |
Rethna Pulikkoonattu (Broadcom Inc) |
23-Jul-2025 01:58:52 ET |
Download |
23-Jul-2025 ET |
2025 |
1091 |
2 |
TGbn |
PDT MAC on modes enablement and parameter updates at the AP |
Gaurang Naik (Qualcomm) |
23-Jul-2025 01:26:10 ET |
Download |
23-Jul-2025 ET |
2025 |
882 |
7 |
TGbn |
PDT MAC UHR operating mode and parameter updates |
Gaurang Naik (Qualcomm) |
23-Jul-2025 01:25:44 ET |
Download |
23-Jul-2025 ET |
2025 |
1097 |
2 |
TGbn |
cc50 mac cids in clause 37.14 |
Liwen Chu (NXP) |
23-Jul-2025 01:04:03 ET |
Download |
22-Jul-2025 ET |
2025 |
1048 |
3 |
TGbn |
july-2025-mac-phy-adhoc-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
22-Jul-2025 23:25:24 ET |
Download |
16-Jul-2025 ET |
2025 |
1149 |
0 |
TGbn |
CC50 CR for some general comments |
Suhwook Kim (Samsung Electronics) |
22-Jul-2025 22:39:49 ET |
Download |
20-Jul-2025 ET |
2025 |
888 |
1 |
TGbn |
TGbn D0.1 CR for CID 2848, 3026, 3071 |
Suhwook Kim (Samsung) |
22-Jul-2025 22:39:16 ET |
Download |
22-Jul-2025 ET |
2025 |
1166 |
1 |
TGbn |
CC50 CR for misc CIDs in 38.5 |
Rui Cao (NXP) |
22-Jul-2025 21:08:15 ET |
Download |
22-Jul-2025 ET |
2025 |
1177 |
1 |
TGbn |
CID Resolution CC50 for CoRTWT |
Giovanni Chisci, Qualcomm Technologies Inc. |
22-Jul-2025 20:57:37 ET |
Download |
20-Jul-2025 ET |
2025 |
1255 |
0 |
TGbn |
CC 50 CR for Dynamic Power Save Mode Update |
Vishnu Ratnam (Samsung Electronics) |
22-Jul-2025 19:40:36 ET |
Download |
22-Jul-2025 ET |
2025 |
1091 |
1 |
TGbn |
PDT MAC on modes enablement and parameter updates at the AP |
Gaurang Naik (Qualcomm) |
22-Jul-2025 17:31:38 ET |
Download |
22-Jul-2025 ET |
2025 |
882 |
6 |
TGbn |
PDT MAC UHR operating mode and parameter updates |
Gaurang Naik (Qualcomm) |
22-Jul-2025 17:31:09 ET |
Download |
17-Jul-2025 ET |
2025 |
1180 |
0 |
TGbn |
DRU Transmit Modulation Accuracy (EVM) Requirement |
Yan Zhang (Apple) |
22-Jul-2025 16:46:37 ET |
Download |
22-Jul-2025 ET |
2025 |
286 |
11 |
TGbi |
IEEE 802.11bi LB288 comments |
Po-Kai Huang (Intel) |
22-Jul-2025 15:39:38 ET |
Download |
18-Jul-2025 ET |
2025 |
1203 |
0 |
TGbn |
Discussions on Cross-BSS Sounding |
Mahmoud Kamel (InterDigital) |
22-Jul-2025 15:14:37 ET |
Download |
22-Jul-2025 ET |
2025 |
1030 |
2 |
802.11 WG |
2025 July WG11 Agenda |
Robert Stacey (Intel) |
22-Jul-2025 14:13:44 ET |
Download |
22-Jul-2025 ET |
2025 |
1277 |
0 |
TGm |
Neighbor And Beacon Report S1G |
Dave Halasz (Morse Micro) |
22-Jul-2025 13:51:55 ET |
Download |
18-Jul-2025 ET |
2025 |
1210 |
0 |
TGbn |
Group Keys Setup in Seamless Roaming |
Jarkko Kneckt (Apple) |
22-Jul-2025 13:37:28 ET |
Download |
11-Jul-2025 ET |
2025 |
1131 |
0 |
TGbn |
CR for Seamless Roaming |
Duncan Ho (Qualcomm Technologies, Inc.) |
22-Jul-2025 11:13:55 ET |
Download |
17-Jul-2025 ET |
2025 |
1185 |
0 |
TGbn |
CSI Process in Joint Sounding |
Junghoon Suh (Huawei) |
22-Jul-2025 09:42:15 ET |
Download |
17-Jul-2025 ET |
2025 |
1186 |
0 |
TGbn |
CBF Scheduled Users in the CBF Trigger Frame |
Junghoon Suh (Huawei) |
22-Jul-2025 09:41:49 ET |
Download |
17-Jul-2025 ET |
2025 |
1187 |
0 |
TGbn |
HT Control field of CoBF DL PPDU for the indication of non-scheduled STA |
Junghoon Suh (Huawei) |
22-Jul-2025 09:41:23 ET |
Download |
17-Jul-2025 ET |
2025 |
1188 |
0 |
TGbn |
HT Control field of CoBF DL PPDU for TB-Ack Scheduling |
Junghoon Suh (Huawei) |
22-Jul-2025 09:40:44 ET |
Download |
20-Jul-2025 ET |
2025 |
1254 |
0 |
TGbn |
CC50 more editorial CIDs |
Ross Jian Yu (Huawei) |
22-Jul-2025 09:23:03 ET |
Download |
17-Jul-2025 ET |
2025 |
1184 |
0 |
TGbn |
Padding requirement for cross-BSS Trigger frame |
Ross Jian Yu (Huawei) |
22-Jul-2025 09:22:42 ET |
Download |
17-Jul-2025 ET |
2025 |
1183 |
0 |
TGbn |
Tx Power Control Clarifications for Co-SR |
Ross Jian Yu (Huawei) |
22-Jul-2025 09:22:19 ET |
Download |
17-Jul-2025 ET |
2025 |
1182 |
0 |
TGbn |
Negotiation on LTF Number for Co-SR |
Ross Jian Yu (Huawei) |
22-Jul-2025 09:21:55 ET |
Download |
17-Jul-2025 ET |
2025 |
1178 |
0 |
TGbn |
Information Exchange for CoSR transmissions |
Sameer Vermani (Qualcomm) |
22-Jul-2025 08:59:11 ET |
Download |
17-Jul-2025 ET |
2025 |
1181 |
0 |
TGbn |
Scrambler seed used in DS-CTS frame |
B Hari Ram (NXP) |
22-Jul-2025 04:47:55 ET |
Download |
17-Jun-2025 ET |
2025 |
1044 |
0 |
TGm |
Missing subfield description for M-BA frame |
Haorui Yang (China Mobile) |
22-Jul-2025 03:30:58 ET |
Download |
22-Jul-2025 ET |
2025 |
756 |
5 |
TGbn |
CC50 CR for CID 2693 |
Eda Genc (Nokia) |
22-Jul-2025 03:29:58 ET |
Download |
22-Jul-2025 ET |
2025 |
1122 |
1 |
TGbi |
CIDs for Clause 10.71.2_part 2 |
Antonio de la Oliva, Interdigital |
22-Jul-2025 02:56:39 ET |
Download |
18-Jul-2025 ET |
2025 |
1202 |
0 |
TGbr |
Channel Model for Enhanced Light Communications |
Sreelal Maravanchery Mana (Fraunhofer HHI) |
22-Jul-2025 02:50:14 ET |
Download |
22-Jul-2025 ET |
2025 |
1275 |
0 |
TGbi |
CIDs 18, 19, 112, 208, 756, 757, 790, 791 |
Antonio de la Oliva, Interdigital |
22-Jul-2025 02:49:59 ET |
Download |
27-Jun-2025 ET |
2025 |
1082 |
0 |
TGbn |
PDT-MAC-Co-TDMA-CR-CC50-Part-3 |
Sanket Kalamkar (Qualcomm Technologies Inc.) |
22-Jul-2025 02:42:14 ET |
Download |
15-Jul-2025 ET |
2025 |
1145 |
0 |
TGbn |
Duo for peer STA |
Rubayet Shafin (Samsung Electronics) |
22-Jul-2025 02:13:47 ET |
Download |
18-Jul-2025 ET |
2025 |
1195 |
0 |
TGbn |
EVM Definition for UHR DRU TB PPDU followup |
Ying Liu (NXP) |
22-Jul-2025 01:59:06 ET |
Download |
17-Jul-2025 ET |
2025 |
1176 |
0 |
TGbn |
Unused Tone EVM for DRU |
Lin Yang (Qualcomm Inc.) |
22-Jul-2025 01:52:01 ET |
Download |
17-Jul-2025 ET |
2025 |
1175 |
0 |
TGbn |
Scrambling Seed Design for DS-CTS |
Lin Yang (Qualcomm Inc.) |
22-Jul-2025 01:50:14 ET |
Download |
21-Jul-2025 ET |
2025 |
541 |
3 |
TGbn |
Co-SR Power Control |
Huixuan Zhou (OPPO) |
22-Jul-2025 00:12:30 ET |
Download |
17-Jul-2025 ET |
2025 |
1177 |
0 |
TGbn |
CID Resolution CC50 for CoRTWT |
Giovanni Chisci, Qualcomm Technologies Inc. |
21-Jul-2025 21:43:02 ET |
Download |
11-Jul-2025 ET |
2025 |
1129 |
0 |
TGbn |
On Determination of CoBF MAP Sync-reference and Sync-follower Roles |
Shuling (Julia) Feng (Mediatek) |
21-Jul-2025 20:03:11 ET |
Download |
21-Jul-2025 ET |
2025 |
882 |
5 |
TGbn |
PDT MAC UHR operating mode and parameter updates |
Gaurang Naik (Qualcomm) |
21-Jul-2025 18:14:35 ET |
Download |
30-Jun-2025 ET |
2025 |
1091 |
0 |
TGbn |
PDT MAC on modes enablement and parameter updates at the AP |
Gaurang Naik (Qualcomm) |
21-Jul-2025 18:13:43 ET |
Download |
22-Jun-2025 ET |
2025 |
1057 |
0 |
AIML TIG/SC |
AIML SC July 2025 Madrid Plenary Snapsho |
Xiaofei WANG (InterDigital) |
21-Jul-2025 17:18:28 ET |
Download |
22-Jun-2025 ET |
2025 |
1058 |
0 |
AIML TIG/SC |
AIML SC July 2025 Madrid Meeting Agenda |
Xiaofei WANG (InterDigital) |
21-Jul-2025 17:17:30 ET |
Download |
21-Jul-2025 ET |
2011 |
270 |
79 |
802.11 WG |
ANA Database |
Carol Ansley (Cox) |
21-Jul-2025 16:25:01 ET |
Download |
21-Jul-2025 ET |
2025 |
1270 |
0 |
WNG SC |
Status update: ns-3 WiFi Simulations |
S. Roy, M. Shen (UW), J. Zhu (NSS) |
21-Jul-2025 15:59:28 ET |
Download |
17-Jul-2025 ET |
2025 |
1190 |
0 |
TGbn |
Misc. PHY Topics |
Ron Porat (Broadcom) |
21-Jul-2025 15:16:20 ET |
Download |
17-Jul-2025 ET |
2025 |
1192 |
0 |
TGbn |
COSR Information Exchange |
You-Wei Chen (MediaTek) |
21-Jul-2025 12:12:02 ET |
Download |
17-Jul-2025 ET |
2025 |
1191 |
0 |
TGbn |
COBF Misc |
You-Wei Chen (MediaTek) |
21-Jul-2025 12:11:36 ET |
Download |
29-Jun-2025 ET |
2025 |
1087 |
0 |
TGbn |
PDT - Setting TXVECTOR parameters for UHR PPDU |
Jeongki Kim (Ofinno) |
21-Jul-2025 11:31:14 ET |
Download |
21-Jul-2025 ET |
2025 |
1269 |
0 |
TGbn |
MAPC Security Guidelines |
Michael Montemurro (Huawei) |
21-Jul-2025 10:40:13 ET |
Download |
23-Jun-2025 ET |
2025 |
1062 |
0 |
ARC SC |
ARC SC agenda July 2025 |
Mark Hamilton (Ruckus/CommScope) |
21-Jul-2025 08:55:37 ET |
Download |
21-Jul-2025 ET |
2025 |
296 |
28 |
TGbn |
IEEE 802.11bn CC50 comments on D0.1 |
Ross Jian Yu (Huawei) |
21-Jul-2025 07:25:00 ET |
Download |
21-Jul-2025 ET |
2025 |
1266 |
0 |
TGbn |
Power Save Mode & Capabilities Management |
Manasi Ekkundi(Samsung Electronics) |
21-Jul-2025 06:13:16 ET |
Download |
21-Jul-2025 ET |
2025 |
1108 |
1 |
PQC SG |
pqc-protocol-definitions |
Dan Harkins (HPE) |
21-Jul-2025 05:33:08 ET |
Download |
21-Jul-2025 ET |
2025 |
1080 |
1 |
TGbn |
CC50: Switching back condition for NPCA operation |
Dongju Cha (LG Electronics) |
21-Jul-2025 03:49:07 ET |
Download |
17-Jul-2025 ET |
2025 |
1155 |
0 |
TGbn |
Further Considerations on P-EDCA |
Si-Chan Noh (Newracom) |
21-Jul-2025 03:33:38 ET |
Download |
21-Jul-2025 ET |
2025 |
1256 |
0 |
TGbn |
Coexistence of NPCA and DBE Mechanism_r0 |
Shravan Kumar Kalyankar (Huawei) |
21-Jul-2025 00:08:33 ET |
Download |
20-Jul-2025 ET |
2025 |
1238 |
0 |
TGbn |
CR for seamless roaming clause 4 |
Binita Gupta (Cisco Systems) |
20-Jul-2025 23:39:21 ET |
Download |
16-Jul-2025 ET |
2025 |
1151 |
0 |
TGbn |
CC50 CR on CID 866 |
Ross Jian Yu (Huawei) |
20-Jul-2025 23:06:23 ET |
Download |
13-Jul-2025 ET |
2025 |
1135 |
0 |
TGbn |
CC50 CR for CID 2833 and 2834 |
Jungjun Kim (Samsung Electronics) |
20-Jul-2025 22:28:26 ET |
Download |
09-Jun-2025 ET |
2025 |
1027 |
0 |
TGbn |
PDT-MAC-DBE-part 2 |
Binita Gupta (Cisco Systems) |
20-Jul-2025 22:25:28 ET |
Download |
20-Jul-2025 ET |
2025 |
272 |
4 |
TGbn |
TGbn Spec Text Volunteers and Status |
Ross Jian Yu (Huawei) |
20-Jul-2025 20:50:56 ET |
Download |
20-Jul-2025 ET |
2025 |
1022 |
1 |
TGbn |
CoSR and CoBF follow up |
Jay Yang (ZTE) |
20-Jul-2025 19:17:33 ET |
Download |
17-Jul-2025 ET |
2025 |
1166 |
0 |
TGbn |
CC50 CR for misc CIDs in 38.5 |
Rui Cao (NXP) |
20-Jul-2025 19:17:31 ET |
Download |
20-Jul-2025 ET |
2025 |
880 |
4 |
TGbn |
PDT MAC on L4S |
Binita Gupta (Cisco Systems) |
20-Jul-2025 14:38:11 ET |
Download |
18-Jul-2025 ET |
2025 |
1194 |
0 |
TGbn |
Resolutions for Remaining CIDs on DRUs |
Jianhan Liu (Mediatek Inc.) |
20-Jul-2025 01:29:36 ET |
Download |
19-Jul-2025 ET |
2025 |
1233 |
0 |
802.11 WG |
802.18 liaison report - July 2025 |
Edward Au (Huawei) |
19-Jul-2025 15:24:05 ET |
Download |
21-Jun-2025 ET |
2025 |
1055 |
0 |
TGbq |
TGbq agenda - 2025 July plenary |
Edward Au (Huawei) |
19-Jul-2025 13:55:37 ET |
Download |
21-Jun-2025 ET |
2025 |
1056 |
0 |
TGbq |
Supplementary material for 2025 July plenary |
Edward Au (Huawei) |
19-Jul-2025 13:55:14 ET |
Download |
02-Jul-2025 ET |
2025 |
1101 |
0 |
TGbn |
PDT-CR MAC on Seamless Roaming Part 5 |
Duncan Ho (Qualcomm Technologies, Inc.) |
19-Jul-2025 00:53:15 ET |
Download |
05-Jun-2025 ET |
2025 |
1020 |
0 |
TGbn |
PDT-CR MAC on Seamless Roaming Part 4 |
Duncan Ho (Qualcomm Technologies, Inc.) |
19-Jul-2025 00:39:15 ET |
Download |
19-Jul-2025 ET |
2025 |
753 |
2 |
TGbn |
PDT MAC on Seamless Roaming Part 3 |
Duncan Ho (Qualcomm Technologies, Inc.) |
19-Jul-2025 00:35:14 ET |
Download |
18-Jul-2025 ET |
2025 |
1049 |
1 |
TGbn |
PDT MAC MAPC PASN part 1 |
Jay Yang (ZTE) |
18-Jul-2025 21:40:52 ET |
Download |
18-Jul-2025 ET |
2025 |
669 |
4 |
TGbn |
cr cc50 mac cids in clause 37.9.1 |
Liwen Chu (NXP) |
18-Jul-2025 19:51:45 ET |
Download |
18-Jul-2025 ET |
2025 |
1090 |
1 |
TGbn |
cr cc50 mac cids in clause 9.4.1.85 |
Liwen Chu (NXP) |
18-Jul-2025 19:34:08 ET |
Download |
18-Jul-2025 ET |
2025 |
1094 |
2 |
TGbn |
cr cc50 mac cids in clause 37.13 |
Liwen Chu (NXP) |
18-Jul-2025 19:17:45 ET |
Download |
18-Jul-2025 ET |
2025 |
1048 |
2 |
TGbn |
july-2025-mac-phy-adhoc-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
18-Jul-2025 19:14:51 ET |
Download |
18-Jul-2025 ET |
2025 |
1097 |
1 |
TGbn |
cc50 mac cids in clause 37.14 |
Liwen Chu (NXP) |
18-Jul-2025 19:09:51 ET |
Download |
18-Jul-2025 ET |
2025 |
1048 |
1 |
TGbn |
july-2025-mac-phy-adhoc-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
18-Jul-2025 19:06:42 ET |
Download |
23-Jun-2025 ET |
2025 |
1069 |
0 |
TGm |
REVmf Agenda July 2025 Session |
Michael Montemurro (Huawei) |
18-Jul-2025 17:32:40 ET |
Download |
18-Jul-2025 ET |
2025 |
1214 |
0 |
TGbn |
mac-pdt-changes-to-p-edca-37.5 |
Dmitry Akhmetov (Intel) |
18-Jul-2025 15:45:32 ET |
Download |
18-Jul-2025 ET |
2025 |
636 |
6 |
TGbn |
Joint PDT CR Trigger Frame Format Part 5 |
Alice Chen (Qualcomm) |
18-Jul-2025 15:00:00 ET |
Download |
18-Jul-2025 ET |
2025 |
468 |
1 |
TGbn |
HP EDCA followup Condition to use DS |
Yonggang Fang (MediaTek) |
18-Jul-2025 12:16:30 ET |
Download |
18-Jul-2025 ET |
2025 |
174 |
2 |
TGbi |
EDP AID-list handling on long power-save scenarios |
Federico Lovison (Cisco Systems) |
18-Jul-2025 09:44:51 ET |
Download |
18-Jul-2025 ET |
2025 |
1200 |
0 |
WNG SC |
Rate Splitting Multiple Access for 802.11 |
Bruno Clerckx (Imperial College London) |
18-Jul-2025 07:41:41 ET |
Download |
18-Jul-2025 ET |
2025 |
1199 |
0 |
TGbr |
july-2025-TGbr-agenda |
Nikola Serafimovski (University of Cambridge) |
18-Jul-2025 07:09:19 ET |
Download |
18-Jul-2025 ET |
2025 |
742 |
1 |
TGbn |
MAC-PDT-CR-37_12_2-internal-error-indication |
Sherief Helwa (Qualcomm) |
18-Jul-2025 05:18:12 ET |
Download |
18-Jul-2025 ET |
2025 |
1198 |
0 |
WNG SC |
Signal Design for Sensing Security/Privacy in ISAC |
Christos Masouros (University College London) |
18-Jul-2025 05:15:40 ET |
Download |
18-Jul-2025 ET |
2025 |
1197 |
0 |
WNG SC |
AI-driven Dirty Paper Coding for Multiuser MIMO |
Mathini Sellathurai (Heriot-Watt University) |
18-Jul-2025 05:11:59 ET |
Download |
18-Jul-2025 ET |
2025 |
437 |
18 |
TGbn |
CC D0.1 subclause 37.11 |
Laurent Cariou (Intel) |
18-Jul-2025 02:40:20 ET |
Download |