Created (ET) |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) ▼ |
Actions |
03-Sep-2025 ET |
2025 |
1508 |
0 |
TGm |
TPC Report Element |
Youhan Kim (Qualcomm Technologies, Inc.) |
05-Sep-2025 21:02:36 ET |
Download |
05-Sep-2025 ET |
2025 |
1471 |
1 |
TGbq |
TGbq August/September 2025 Teleconference Call Meeting Minutes |
Jonghoe Koo (Samsung Electronics) |
05-Sep-2025 11:30:47 ET |
Download |
05-Sep-2025 ET |
2025 |
1522 |
0 |
TGbn |
About DL data forwarding |
Abhishek Chaturvedi (Samsung Electronics) |
05-Sep-2025 07:58:04 ET |
Download |
04-Sep-2025 ET |
2025 |
1521 |
0 |
PQC SG |
TGbt timeline discussion |
Jay Yang (ZTE) |
04-Sep-2025 23:11:18 ET |
Download |
04-Sep-2025 ET |
2025 |
1517 |
0 |
TGbq |
Considerations for the IMMW Channel Access |
Yurong Qian (ZTE) |
04-Sep-2025 20:53:56 ET |
Download |
04-Sep-2025 ET |
2025 |
724 |
4 |
TGbn |
Details on Over-the-DS Probe Mechanism |
Guogang Huang (Huawei) |
04-Sep-2025 07:53:14 ET |
Download |
04-Sep-2025 ET |
2025 |
1357 |
2 |
TGbp |
PDT WPT Energizer control |
Ian Bajaj (Huawei) |
04-Sep-2025 05:37:19 ET |
Download |
03-Sep-2025 ET |
2025 |
1215 |
1 |
TGbp |
Discussion on AMP Active Transmission |
Alice Chen (Qualcomm) |
03-Sep-2025 20:43:12 ET |
Download |
03-Sep-2025 ET |
2025 |
1036 |
1 |
TGbn |
MAPC PASN follow up |
Jay Yang (ZTE) |
03-Sep-2025 20:17:29 ET |
Download |
01-Jul-2025 ET |
2025 |
1096 |
0 |
ARC SC |
ARC SC Mixed Mode Minutes July 2025 Plenary |
Joseph Levy (InterDigital) |
03-Sep-2025 18:02:59 ET |
Download |
03-Sep-2025 ET |
2025 |
1436 |
1 |
TGbn |
September-2025-mac-adhoc-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
03-Sep-2025 17:24:10 ET |
Download |
03-Sep-2025 ET |
2025 |
1512 |
0 |
TGbi |
IEEE 802.11bi LB290 comments |
Po-Kai Huang (Intel) |
03-Sep-2025 14:04:01 ET |
Download |
25-Jul-2025 ET |
2025 |
1318 |
0 |
TGbi |
TGbi minutes for July 2025 Plenary Meeting |
Stephane Baron (Canon) |
03-Sep-2025 11:11:15 ET |
Download |
03-Sep-2025 ET |
2025 |
724 |
3 |
TGbn |
Details on Over-the-DS Probe Mechanism |
Guogang Huang (Huawei) |
03-Sep-2025 10:01:27 ET |
Download |
03-Sep-2025 ET |
2025 |
1506 |
0 |
TGbn |
OMP Request with NPCA Feedback Information |
Shravan (Huawei) |
03-Sep-2025 05:39:39 ET |
Download |
18-Aug-2025 ET |
2025 |
1460 |
0 |
TGbn |
Some thoughts on DPS |
Chun Huang (ZTE) |
02-Sep-2025 22:40:24 ET |
Download |
02-Sep-2025 ET |
2025 |
419 |
3 |
TGbn |
Spatial Reuse for NPCA Capable STAs |
Salvatore Talarico (Nokia) |
02-Sep-2025 17:06:26 ET |
Download |
02-Sep-2025 ET |
2025 |
1241 |
1 |
TGbp |
AMP Pairing and ID assignment |
Rojan Chitrakar (Huawei) |
02-Sep-2025 11:38:10 ET |
Download |
11-Aug-2025 ET |
2025 |
1437 |
0 |
TGbp |
A Scalable Provisioning Method and Its Improvement for Secure AMP Communication |
Hui Luo (Infineon Technologies) |
02-Sep-2025 10:16:33 ET |
Download |
02-Sep-2025 ET |
2025 |
1443 |
1 |
TGbq |
On-demand mmWave link activation - follow up |
Jonghoe Koo (Samsung Electronics) |
02-Sep-2025 08:56:35 ET |
Download |
20-Jul-2025 ET |
2025 |
1241 |
0 |
TGbp |
AMP Pairing and ID assignment |
Rojan Chitrakar (Huawei) |
02-Sep-2025 08:56:05 ET |
Download |
02-Sep-2025 ET |
2025 |
1371 |
2 |
TGbq |
TGbq July 2025 Plenary Meeting Minutes |
Jonghoe Koo (Samsung Electronics) |
02-Sep-2025 08:10:55 ET |
Download |
02-Sep-2025 ET |
2025 |
1371 |
1 |
TGbq |
TGbq July 2025 Plenary Meeting Minutes |
Jonghoe Koo (Samsung Electronics) |
02-Sep-2025 08:01:58 ET |
Download |
02-Sep-2025 ET |
2025 |
1357 |
1 |
TGbp |
PDT WPT Energizer control |
Ian Bajaj (Huawei) |
02-Sep-2025 06:13:33 ET |
Download |
02-Sep-2025 ET |
2025 |
1499 |
0 |
TGbn |
OBSS R-TWT SP based NPCA |
Rishabh Roy (Samsung Electronics) |
02-Sep-2025 03:33:42 ET |
Download |
02-Sep-2025 ET |
2025 |
1497 |
1 |
TGbn |
Enabling Co-BF and Co-SR for Co-RTWT Negotiation and Operation |
Rishabh Roy(Samsung Electronics) |
02-Sep-2025 03:27:36 ET |
Download |
16-Aug-2025 ET |
2025 |
1452 |
0 |
TGbn |
MAPC security follow up |
Jay Yang (ZTE) |
02-Sep-2025 03:18:49 ET |
Download |
02-Sep-2025 ET |
2025 |
1497 |
0 |
TGbn |
Enabling Co-BF and Co-SR for Co-RTWT Negotiation and Operation |
Samsung Electronics |
02-Sep-2025 02:18:33 ET |
Download |
15-Aug-2025 ET |
2025 |
1449 |
0 |
TGbn |
MAPC PASN authentication with public key |
Jay Yang (ZTE) |
02-Sep-2025 02:00:07 ET |
Download |
01-Sep-2025 ET |
2025 |
1493 |
0 |
AIML TIG/SC |
Unified AutoEncoder based CSI Feedback in MU-MIMO for Next Generation WLANs - Follow Up |
Eunsung Jeon (Samsung) |
01-Sep-2025 20:32:06 ET |
Download |
28-Aug-2025 ET |
2025 |
1489 |
0 |
TGbn |
802.11bn MAC Ad Hoc July-September Minutes |
Kiseon Ryu (Wilus Inc.) |
01-Sep-2025 20:29:02 ET |
Download |
01-Sep-2025 ET |
2025 |
1429 |
4 |
TGbp |
tg-bp-tc-agenda-till-sep-2025 |
Bo Sun (Sanechips) |
01-Sep-2025 11:54:27 ET |
Download |
20-Jul-2025 ET |
2025 |
1234 |
0 |
TGbp |
AMP Tag Active Mode Performance Example and Review |
Dror Regev (Huawei) |
01-Sep-2025 11:12:18 ET |
Download |
01-Sep-2025 ET |
2025 |
1495 |
0 |
TGbn |
Mobile-AP unavailability |
Manasi Ekkundi(Samsung Electronics) |
01-Sep-2025 05:53:13 ET |
Download |
26-Aug-2025 ET |
2025 |
1479 |
0 |
TGbp |
RFID operation and .11bp specification |
Solomon Trainin (Wiliot) |
01-Sep-2025 03:35:58 ET |
Download |
13-Aug-2025 ET |
2025 |
1443 |
0 |
TGbq |
On-demand mmWave link activation - follow up |
Jonghoe Koo (Samsung Electronics) |
31-Aug-2025 21:32:59 ET |
Download |
16-Jul-2025 ET |
2025 |
1150 |
0 |
TGbn |
Switch of Timeout Value in DPS |
Maolin Zhang (Huawei) |
30-Aug-2025 06:32:38 ET |
Download |
29-Aug-2025 ET |
2025 |
1492 |
0 |
TGm |
REVmf September 2025 Adhoc Agenda |
Michael Montemurro (Huawei) |
29-Aug-2025 15:49:32 ET |
Download |
19-Aug-2025 ET |
2025 |
1471 |
0 |
TGbq |
TGbq August/September 2025 Teleconference Call Meeting Minutes |
Jonghoe Koo (Samsung Electronics) |
29-Aug-2025 12:59:59 ET |
Download |
29-Aug-2025 ET |
2025 |
1470 |
1 |
TGbp |
Teleconference Minutes August September |
Sebastian Max (Ericsson) |
29-Aug-2025 09:39:56 ET |
Download |
28-Aug-2025 ET |
2025 |
1434 |
7 |
TGbn |
aug-sept-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
28-Aug-2025 12:04:11 ET |
Download |
28-Aug-2025 ET |
2025 |
1267 |
1 |
TGbn |
Dynamic Unavailability Announcement Threshold |
Manasi Ekkundi(Samsung Electronics) |
28-Aug-2025 11:27:18 ET |
Download |
28-Aug-2025 ET |
2025 |
1407 |
5 |
TGbq |
August/September 2025 Teleconference Agenda |
Edward Au (Huawei) |
28-Aug-2025 10:39:45 ET |
Download |
28-Aug-2025 ET |
2025 |
1434 |
6 |
TGbn |
aug-sept-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
28-Aug-2025 09:59:00 ET |
Download |
28-Aug-2025 ET |
2025 |
724 |
2 |
TGbn |
Details on Over-the-DS Probe Mechanism |
Guogang Huang (Huawei) |
28-Aug-2025 09:27:24 ET |
Download |
28-Aug-2025 ET |
2025 |
829 |
1 |
TGbn |
Early Indication of RA-RU in DPS |
Ning Gao(OPPO) |
28-Aug-2025 06:47:45 ET |
Download |
28-Aug-2025 ET |
2025 |
827 |
1 |
TGbn |
Improvement on Link Adaptation Feedback |
Ning Gao(OPPO) |
28-Aug-2025 06:47:10 ET |
Download |
30-Jul-2025 ET |
2025 |
1392 |
0 |
Coex SC |
July 2025 minutes |
Guido R. Hiertz (Ericsson GmbH) |
28-Aug-2025 05:34:22 ET |
Download |
28-Aug-2025 ET |
2025 |
724 |
1 |
TGbn |
Details on Over-the-DS Probe Mechanism |
Guogang Huang (Huawei) |
28-Aug-2025 04:39:24 ET |
Download |
27-Aug-2025 ET |
2025 |
1434 |
5 |
TGbn |
aug-sept-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
27-Aug-2025 14:39:26 ET |
Download |
27-Aug-2025 ET |
2025 |
749 |
2 |
TGbn |
Follow-up on AP Power Save |
Helene Ralle (Orange) |
27-Aug-2025 03:32:51 ET |
Download |
28-Jul-2025 ET |
2025 |
1371 |
0 |
TGbq |
TGbq July 2025 Plenary Meeting Minutes |
Jonghoe Koo (Samsung Electronics) |
26-Aug-2025 22:26:50 ET |
Download |
26-Aug-2025 ET |
2025 |
1434 |
4 |
TGbn |
aug-sept-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
26-Aug-2025 13:56:52 ET |
Download |
26-Aug-2025 ET |
2025 |
1429 |
3 |
TGbp |
tg-bp-tc-agenda-till-sep-2025 |
Bo Sun (Sanechips) |
26-Aug-2025 12:08:25 ET |
Download |
26-Aug-2025 ET |
2025 |
1429 |
2 |
TGbp |
tg-bp-tc-agenda-till-sep-2025 |
Bo Sun (Sanechips) |
26-Aug-2025 09:32:58 ET |
Download |
25-Aug-2025 ET |
2025 |
776 |
2 |
TGbp |
AMP frames - follow up |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
25-Aug-2025 21:00:19 ET |
Download |
25-Aug-2025 ET |
2025 |
357 |
5 |
TGbn |
Retry Timeout Adjustment during EDCA Periods |
Behnam Dezfouli (Nokia) |
25-Aug-2025 19:00:14 ET |
Download |
25-Aug-2025 ET |
2025 |
1434 |
3 |
TGbn |
aug-sept-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
25-Aug-2025 18:39:45 ET |
Download |
25-Aug-2025 ET |
2025 |
579 |
1 |
TGbn |
Operating Mode Request for Multi-AP |
Yongsen Ma (Samsung) |
25-Aug-2025 17:14:35 ET |
Download |
25-Aug-2025 ET |
2025 |
578 |
1 |
TGbn |
TWT-Based AP Power Save |
Yongsen Ma (Samsung) |
25-Aug-2025 17:13:49 ET |
Download |
25-Aug-2025 ET |
2025 |
873 |
1 |
TGbn |
P-EDCA Discussion |
Kiseon Ryu (WILUS) |
25-Aug-2025 15:53:25 ET |
Download |
19-Aug-2025 ET |
2025 |
1470 |
0 |
TGbp |
Teleconference Minutes August September |
Sebastian Max (Ericsson) |
25-Aug-2025 04:56:35 ET |
Download |
25-Aug-2025 ET |
2025 |
645 |
1 |
TGbn |
R-TWT operation with NPCA |
Juseong Moon (KNUT) |
25-Aug-2025 04:46:51 ET |
Download |
24-Aug-2025 ET |
2025 |
1475 |
0 |
UCM TIG |
UCM TIG Unified Channel Model Use Cases proposal |
Yanchun Li (Huawei) |
24-Aug-2025 21:20:02 ET |
Download |
21-Aug-2025 ET |
2025 |
1407 |
4 |
TGbq |
August/September 2025 Teleconference Agenda |
Edward Au (Huawei) |
23-Aug-2025 16:35:40 ET |
Download |
21-Aug-2025 ET |
2025 |
1156 |
1 |
TGm |
CFP support for ranging and sensing trigger frames |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
21-Aug-2025 17:55:52 ET |
Download |
21-Aug-2025 ET |
2025 |
1434 |
2 |
TGbn |
aug-sept-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
21-Aug-2025 17:52:50 ET |
Download |
21-Aug-2025 ET |
2025 |
493 |
2 |
TGbn |
NPCA during scheduled periods |
Zhenpeng Shi (Huawei) |
21-Aug-2025 11:43:33 ET |
Download |
21-Aug-2025 ET |
2025 |
445 |
1 |
TGbn |
Discussion on Coordinated NPCA Operation |
Javier Perez-Ramirez (Ofinno) |
21-Aug-2025 11:30:15 ET |
Download |
21-Aug-2025 ET |
2025 |
355 |
1 |
TGbn |
Considerations for AP Dynamic Power Save |
Aditi Singh (Charter Communications) |
21-Aug-2025 10:29:04 ET |
Download |
21-Aug-2025 ET |
2025 |
1472 |
0 |
PQC SG |
PQC SG July 2025 Plenary Meeting Minutes |
Alex LUNGU (Samsung) |
21-Aug-2025 10:26:00 ET |
Download |
21-Aug-2025 ET |
2025 |
408 |
1 |
TGbn |
Roaming Through Target AP follow-up |
Binita Gupta (Cisco Systems) |
21-Aug-2025 03:06:01 ET |
Download |
20-Aug-2025 ET |
2025 |
237 |
2 |
TGbn |
Access Delay for Seamless Roaming |
Haorui Yang (China Mobile) |
20-Aug-2025 21:45:01 ET |
Download |
20-Aug-2025 ET |
2025 |
18 |
1 |
TGbn |
Considerations on STAs without NPCA Capability |
Juseong Moon (KNUT) |
20-Aug-2025 04:14:17 ET |
Download |
15-Aug-2025 ET |
2025 |
1448 |
0 |
TGbn |
Bandwidth Expansion by AP PUO and DPS |
Yongsen Ma (Samsung) |
19-Aug-2025 23:52:29 ET |
Download |
08-Aug-2025 ET |
2025 |
1428 |
0 |
ARC SC |
ARC SC agenda Sept 2025 |
Mark Hamilton (Ruckus/CommScope) |
19-Aug-2025 12:43:53 ET |
Download |
19-Aug-2025 ET |
2025 |
1429 |
1 |
TGbp |
tg-bp-tc-agenda-till-sep-2025 |
Bo Sun (Sanechips) |
19-Aug-2025 12:06:41 ET |
Download |
19-Aug-2025 ET |
2025 |
1344 |
2 |
TGbp |
PDT Components of architecture |
Rojan Chitrakar (Huawei) |
19-Aug-2025 11:24:41 ET |
Download |
06-Aug-2025 ET |
2025 |
1424 |
0 |
TGbp |
A WPT Device Option |
Amichai Sanderovich (Wiliot) |
19-Aug-2025 09:59:25 ET |
Download |
19-Aug-2025 ET |
2025 |
1407 |
3 |
TGbq |
August/September 2025 Teleconference Agenda |
Edward Au (Huawei) |
19-Aug-2025 08:42:24 ET |
Download |
19-Aug-2025 ET |
2025 |
1333 |
1 |
TGbp |
PDT PHY UL Modulation And Coding |
Alice Chen (Qualcomm) |
19-Aug-2025 03:33:06 ET |
Download |
19-Aug-2025 ET |
2024 |
1613 |
12 |
TGbp |
Specification Framework for TGbp |
Yinan Qi (OPPO) |
19-Aug-2025 03:31:25 ET |
Download |
19-Aug-2025 ET |
2025 |
613 |
8 |
TGbp |
TGbp Spec Text Topics and Volunteers |
Yinan Qi (OPPO) |
19-Aug-2025 03:30:48 ET |
Download |
19-Aug-2025 ET |
2025 |
614 |
6 |
TGbp |
Proposed Specification Skeleton for TGbp D0.1 |
Yinan Qi (OPPO) |
19-Aug-2025 03:30:09 ET |
Download |
19-Aug-2025 ET |
2025 |
1344 |
1 |
TGbp |
PDT Components of architecture |
Rojan Chitrakar (Huawei) |
19-Aug-2025 01:34:47 ET |
Download |
18-Aug-2025 ET |
2025 |
1434 |
1 |
TGbn |
aug-sept-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
18-Aug-2025 13:31:43 ET |
Download |
18-Aug-2025 ET |
2025 |
614 |
5 |
TGbp |
Proposed Specification Skeleton for TGbp D0.1 |
Yinan Qi (OPPO) |
18-Aug-2025 03:22:27 ET |
Download |
18-Aug-2025 ET |
2025 |
613 |
7 |
TGbp |
TGbp Spec Text Topics and Volunteers |
Yinan Qi (OPPO) |
18-Aug-2025 03:21:44 ET |
Download |
18-Aug-2025 ET |
2024 |
1613 |
11 |
TGbp |
Specification Framework for TGbp |
Yinan Qi (OPPO) |
18-Aug-2025 03:20:58 ET |
Download |
17-Aug-2025 ET |
2025 |
1001 |
3 |
TGbn |
Adaptive power boosting design for dRU |
Sawaira Ali (Vestel) |
17-Aug-2025 15:35:09 ET |
Download |
14-Aug-2025 ET |
2025 |
1407 |
2 |
TGbq |
August/September 2025 Teleconference Agenda |
Edward Au (Huawei) |
16-Aug-2025 13:02:37 ET |
Download |
14-Aug-2025 ET |
2025 |
296 |
29 |
TGbn |
IEEE 802.11bn CC50 comments on D0.1 |
Ross Jian Yu (Huawei) |
14-Aug-2025 20:36:49 ET |
Download |
11-Aug-2025 ET |
2025 |
1429 |
0 |
TGbp |
tg-bp-tc-agenda-till-sep-2025 |
Bo Sun (Sanechips) |
14-Aug-2025 10:05:50 ET |
Download |
11-Aug-2025 ET |
2025 |
1438 |
0 |
AIML TIG/SC |
AIML SC July 2025 Plenary Meeting Minutes |
Liangxiao Xin (NBU) |
14-Aug-2025 03:37:33 ET |
Download |
21-Jul-2025 ET |
2025 |
1267 |
0 |
TGbn |
Dynamic Unavailability Announcement Threshold |
Manasi Ekkundi(Samsung Electronics) |
14-Aug-2025 03:00:58 ET |
Download |
16-Apr-2025 ET |
2025 |
665 |
0 |
TGbn |
Status Update During DSO |
Yuxin Lu (TCL Industries) |
13-Aug-2025 21:53:40 ET |
Download |
17-Jul-2025 ET |
2025 |
1172 |
0 |
TGbn |
Further consideration on DPS mode |
Kiseon Ryu (WILUS) |
12-Aug-2025 15:35:29 ET |
Download |
17-Jul-2025 ET |
2025 |
1171 |
0 |
TGbn |
NPCA operation considering unavailability |
Kiseon Ryu (WILUS) |
12-Aug-2025 15:35:04 ET |
Download |
11-Aug-2025 ET |
2025 |
1071 |
8 |
TGbn |
PDT/CR for ICF/ICR details with multiple modes |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
11-Aug-2025 21:12:06 ET |
Download |
11-Aug-2025 ET |
2025 |
1436 |
0 |
TGbn |
September-2025-mac-adhoc-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
11-Aug-2025 19:29:37 ET |
Download |