Created (ET) |
Year |
DCN |
Rev |
Group ▼ |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
10-May-2024 ET |
2024 |
860 |
0 |
TGbp |
Coexistence considerations of AMP data communication |
You-Wei Chen (MediaTek) |
10-May-2024 13:07:40 ET |
Download |
10-May-2024 ET |
2024 |
854 |
0 |
TGbp |
MSK Performance For 802.11bp |
Amichai Sanderovich (Wiliot) |
13-May-2024 05:42:21 ET |
Download |
10-May-2024 ET |
2024 |
853 |
0 |
TGbp |
Design target and device capabilities for AMP IoT |
Weijie Xu (OPPO) |
12-May-2024 12:30:42 ET |
Download |
10-May-2024 ET |
2024 |
851 |
0 |
TGbp |
Uplink FDM for AMP |
Yinan Qi (OPPO) |
12-May-2024 09:40:41 ET |
Download |
10-May-2024 ET |
2024 |
849 |
0 |
TGbp |
Harmonization of Waveform |
Yinan Qi (OPPO) |
12-May-2024 09:41:02 ET |
Download |
10-May-2024 ET |
2024 |
847 |
0 |
TGbp |
Initial Thought on 2.4 GHz DL AMP PPDU Design |
Bin Qian (Huawei) |
10-May-2024 03:23:32 ET |
Download |
10-May-2024 ET |
2024 |
841 |
0 |
TGbp |
11bp timeline discussion |
Lei Huang (Huawei) |
12-May-2024 10:26:35 ET |
Download |
09-May-2024 ET |
2024 |
836 |
0 |
TGbp |
Thoughts on AMP UHF RFID Tags |
Rojan Chitrakar (Huawei) |
10-May-2024 03:41:10 ET |
Download |
09-May-2024 ET |
2024 |
835 |
0 |
TGbp |
Overview of S1G and RFID Spectrum |
Panpan Li (Huawei) |
10-May-2024 22:32:02 ET |
Download |
09-May-2024 ET |
2024 |
826 |
0 |
TGbp |
Energy balance of the state-based AMP station |
Solomon Trainin (Wiliot) |
09-May-2024 13:44:52 ET |
Download |
07-May-2024 ET |
2024 |
798 |
0 |
TGbp |
Close-range AMP WiFi Reader Feasibility Study followup |
Rui Cao (NXP) |
13-May-2024 02:52:57 ET |
Download |
18-Apr-2024 ET |
2024 |
722 |
0 |
TGbp |
Introduction to passive sub 1GHz RFID systems |
Franz Amtmann (NXP) |
13-May-2024 02:27:17 ET |
Download |
06-Apr-2024 ET |
2024 |
666 |
0 |
TGbp |
tg-bp-meeting-agenda-for-may-interim-2024 |
Bo Sun (Sanechips) |
28-Apr-2024 02:52:03 ET |
Download |
03-Jul-2025 ET |
2025 |
551 |
4 |
TGbn |
CR-MAC-cc50-CIDs_in_clause-9 |
Abhishek Patil (Qualcomm) |
03-Jul-2025 17:24:52 ET |
Download |
03-Jul-2025 ET |
2025 |
986 |
17 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
03-Jul-2025 15:12:52 ET |
Download |
03-Jul-2025 ET |
2025 |
734 |
2 |
TGbn |
Misc. CBF Topics part II |
Ron Porat (Broadcom) |
03-Jul-2025 14:24:28 ET |
Download |
03-Jul-2025 ET |
2025 |
552 |
8 |
TGbn |
CR-MAC-cc50-CIDs_related_to_Beacon_Optimization |
Abhishek Patil (Qualcomm) |
03-Jul-2025 11:31:53 ET |
Download |
03-Jul-2025 ET |
2025 |
92 |
2 |
TGbn |
High-Priority EDCA Management |
Mikhail Liubogoshchev (Nokia) |
03-Jul-2025 11:25:43 ET |
Download |
03-Jul-2025 ET |
2025 |
508 |
3 |
TGbn |
D0.1 CC subclause 37.11.3 |
Laurent Cariou (Intel) |
03-Jul-2025 10:45:38 ET |
Download |
03-Jul-2025 ET |
2025 |
437 |
17 |
TGbn |
CC D0.1 subclause 37.11 |
Laurent Cariou (Intel) |
03-Jul-2025 12:49:34 ET |
Download |
03-Jul-2025 ET |
2025 |
890 |
1 |
TGbn |
D0.1 CC subclause 37.9.2 |
Laurent Cariou (Intel) |
03-Jul-2025 09:49:24 ET |
Download |
03-Jul-2025 ET |
2025 |
437 |
16 |
TGbn |
CC D0.1 subclause 37.11 |
Laurent Cariou (Intel) |
03-Jul-2025 09:34:22 ET |
Download |
03-Jul-2025 ET |
2025 |
437 |
15 |
TGbn |
CC D0.1 subclause 37.11 |
Laurent Cariou (Intel) |
03-Jul-2025 08:19:40 ET |
Download |
02-Jul-2025 ET |
2025 |
552 |
7 |
TGbn |
CR-MAC-cc50-CIDs_related_to_Beacon_Optimization |
Abhishek Patil (Qualcomm) |
02-Jul-2025 20:14:23 ET |
Download |
02-Jul-2025 ET |
2025 |
986 |
16 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
02-Jul-2025 13:24:01 ET |
Download |
02-Jul-2025 ET |
2025 |
1094 |
1 |
TGbn |
cr cc50 mac cids in clause 37.13 |
Liwen Chu (NXP) |
02-Jul-2025 13:11:23 ET |
Download |
01-Jul-2025 ET |
2025 |
1097 |
0 |
TGbn |
cc50 mac cids in clause 37.14 |
Liwen Chu (NXP) |
01-Jul-2025 15:40:49 ET |
Download |
01-Jul-2025 ET |
2025 |
986 |
15 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
01-Jul-2025 15:05:17 ET |
Download |
01-Jul-2025 ET |
2025 |
14 |
26 |
TGbn |
tgbn-motions-list-part-2 |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
01-Jul-2025 15:01:46 ET |
Download |
01-Jul-2025 ET |
2025 |
749 |
1 |
TGbn |
Follow-up on AP Power Save |
Helene Ralle (Orange) |
01-Jul-2025 10:57:45 ET |
Download |
01-Jul-2025 ET |
2025 |
735 |
6 |
TGbn |
CC50 CR for CIDs on overhearing OBSS CSI |
Yurong Qian (ZTE) |
01-Jul-2025 07:31:29 ET |
Download |
30-Jun-2025 ET |
2025 |
1094 |
0 |
TGbn |
cr cc50 mac cids in clause 37.13 |
Liwen Chu (NXP) |
01-Jul-2025 10:54:41 ET |
Download |
30-Jun-2025 ET |
2025 |
965 |
2 |
TGbn |
CC50 CR for 60MHz DBW |
Chenchen Liu (Huawei) |
30-Jun-2025 20:33:09 ET |
Download |
30-Jun-2025 ET |
2025 |
964 |
1 |
TGbn |
CC50 CR for UHR-SIG User Specific Field - Part 2 |
Mengshi Hu (Huawei) |
30-Jun-2025 20:31:44 ET |
Download |
30-Jun-2025 ET |
2025 |
936 |
8 |
TGbn |
PDT-CR-MAC-NPCA-CC50 |
Matthew Fischer (Broadcom) |
30-Jun-2025 20:19:53 ET |
Download |
30-Jun-2025 ET |
2025 |
823 |
4 |
TGbn |
CC50 CR on UEQM CID 372,374 |
Jiyang Bai (TCL) |
30-Jun-2025 20:15:41 ET |
Download |
30-Jun-2025 ET |
2025 |
838 |
9 |
TGbn |
CC50: CR for A-MPDU (9.7.3) related to the Feedback information |
Hongwon Lee(LG Electronics Inc.) |
30-Jun-2025 19:32:50 ET |
Download |
30-Jun-2025 ET |
2025 |
909 |
1 |
TGbn |
CC50 CR for clause 37.3 |
Ming Gan (Huawei) |
30-Jun-2025 19:06:42 ET |
Download |
30-Jun-2025 ET |
2025 |
864 |
1 |
TGbn |
Channel Access Mechanisms for the NPCA Operation |
Sanghyun Kim (WILUS) |
30-Jun-2025 19:04:49 ET |
Download |
30-Jun-2025 ET |
2025 |
994 |
1 |
TGbn |
CC50 CR for CIDs 1872, 1879 and 1880 - NPCA operation |
Sanghyun Kim (WILUS) |
30-Jun-2025 19:04:04 ET |
Download |
30-Jun-2025 ET |
2025 |
14 |
25 |
TGbn |
tgbn-motions-list-part-2 |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
30-Jun-2025 18:57:44 ET |
Download |
30-Jun-2025 ET |
2025 |
946 |
2 |
TGbn |
CC50 PDT-CR MAC on receiving ICF with IFCS |
Vishnu Ratnam (Samsung Electronics) |
30-Jun-2025 18:53:17 ET |
Download |
30-Jun-2025 ET |
2025 |
986 |
14 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
30-Jun-2025 16:35:00 ET |
Download |
30-Jun-2025 ET |
2025 |
1090 |
0 |
TGbn |
cr cc50 mac cids in clause 9.4.1.85 |
Liwen Chu (NXP) |
30-Jun-2025 12:23:37 ET |
Download |
30-Jun-2025 ET |
2025 |
272 |
3 |
TGbn |
TGbn Spec Text Volunteers and Status |
Ross Jian Yu (Huawei) |
30-Jun-2025 09:41:41 ET |
Download |
30-Jun-2025 ET |
2025 |
763 |
1 |
TGbn |
C-RTWT in NPCA Primary channel |
Yunbo Li (Huawei) |
30-Jun-2025 05:33:14 ET |
Download |
30-Jun-2025 ET |
2025 |
760 |
1 |
TGbn |
TXOP in P-EDCA |
Yunbo Li (Huawei) |
30-Jun-2025 05:23:41 ET |
Download |
30-Jun-2025 ET |
2025 |
1089 |
0 |
TGbn |
Discussion on NPCA switch back |
Yingqiao Quan (Spreadtrum) |
30-Jun-2025 06:31:44 ET |
Download |
30-Jun-2025 ET |
2025 |
735 |
5 |
TGbn |
CC50 CR for CIDs on overhearing OBSS CSI |
Yurong Qian (ZTE) |
30-Jun-2025 03:45:50 ET |
Download |
29-Jun-2025 ET |
2025 |
1088 |
0 |
TGbn |
Discussion on Overhead Reduction on Co-BF/Co-SR Signalling |
Ke Zhong (Ruijie Networks Co., Ltd.) |
30-Jun-2025 11:32:52 ET |
Download |
29-Jun-2025 ET |
2025 |
838 |
8 |
TGbn |
CC50: CR for A-MPDU (9.7.3) related to the Feedback information |
Hongwon Lee(LG Electronics Inc.) |
30-Jun-2025 03:55:05 ET |
Download |
29-Jun-2025 ET |
2025 |
839 |
10 |
TGbn |
PDT UHR MU operation |
Hongwon Lee (LG Electronics Inc.) |
30-Jun-2025 03:42:53 ET |
Download |
27-Jun-2025 ET |
2025 |
764 |
3 |
TGbn |
Peer-to-Peer (P2P) PDT |
Rubayet Shafin (Samsung Electronics) |
27-Jun-2025 23:48:11 ET |
Download |
27-Jun-2025 ET |
2025 |
764 |
2 |
TGbn |
Peer-to-Peer (P2P) PDT |
Rubayet Shafin (Samsung Electronics) |
27-Jun-2025 23:38:36 ET |
Download |
27-Jun-2025 ET |
2025 |
768 |
2 |
TGbn |
PDT MAC and CR Coordinated Beamforming Protocol |
Jason Yuchen Guo (Huawei) |
27-Jun-2025 22:18:15 ET |
Download |
27-Jun-2025 ET |
2025 |
965 |
1 |
TGbn |
CC50 CR for 60MHz DBW |
Chenchen Liu (Huawei) |
27-Jun-2025 21:11:09 ET |
Download |
27-Jun-2025 ET |
2025 |
1085 |
0 |
TGbn |
PDT-PHY-CoBF |
Ron Porat (Broadcom) |
03-Jul-2025 14:23:10 ET |
Download |
27-Jun-2025 ET |
2025 |
1083 |
0 |
TGbn |
DPS Suspending Operation |
Qingwei Fu (TP-Link Systems Inc.) |
27-Jun-2025 02:17:18 ET |
Download |
26-Jun-2025 ET |
2025 |
1081 |
0 |
TGbn |
CC50 CR for Pilot subcarriers |
Chenchen Liu(Huawei) |
27-Jun-2025 23:24:02 ET |
Download |
26-Jun-2025 ET |
2025 |
1080 |
0 |
TGbn |
CC50: Switching back condition for NPCA operation |
Dongju Cha (LG Electronics) |
03-Jul-2025 21:14:28 ET |
Download |
26-Jun-2025 ET |
2025 |
277 |
1 |
TGbn |
Follow Up on DRUs |
Brian Hart (Cisco Systems) |
26-Jun-2025 10:10:55 ET |
Download |
26-Jun-2025 ET |
2024 |
2060 |
2 |
TGbn |
CSR/COBF Protocol Design |
Kosuke Aio (Sony Corporation) |
26-Jun-2025 10:01:57 ET |
Download |
26-Jun-2025 ET |
2025 |
768 |
1 |
TGbn |
PDT MAC and CR Coordinated Beamforming Protocol |
Jason Yuchen Guo (Huawei) |
26-Jun-2025 09:21:20 ET |
Download |
26-Jun-2025 ET |
2025 |
1026 |
1 |
TGbn |
Sequential Ack Procedure of Co-SR |
Yurong Qian (ZTE) |
26-Jun-2025 03:30:45 ET |
Download |
26-Jun-2025 ET |
2025 |
879 |
2 |
TGbn |
CoBF Signaling Details |
Sherief Helwa (Qualcomm) |
26-Jun-2025 01:38:02 ET |
Download |
25-Jun-2025 ET |
2025 |
986 |
13 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
25-Jun-2025 21:07:51 ET |
Download |
25-Jun-2025 ET |
2025 |
823 |
3 |
TGbn |
CC50 CR on UEQM CID 372,374 |
Jiyang Bai (TCL) |
25-Jun-2025 04:29:42 ET |
Download |
25-Jun-2025 ET |
2025 |
1072 |
0 |
TGbn |
CC50 CR on DRU CID 375 |
Jiyang Bai (TCL) |
25-Jun-2025 04:25:30 ET |
Download |
24-Jun-2025 ET |
2025 |
986 |
12 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
24-Jun-2025 20:12:29 ET |
Download |
24-Jun-2025 ET |
2025 |
1071 |
0 |
TGbn |
PDT/CR for ICF/ICR details with multiple modes |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
03-Jul-2025 20:11:07 ET |
Download |
24-Jun-2025 ET |
2025 |
357 |
1 |
TGbn |
Retry Timeout Adjustment during EDCA Periods |
Behnam Dezfouli (Nokia) |
24-Jun-2025 16:59:46 ET |
Download |
23-Jun-2025 ET |
2025 |
296 |
25 |
TGbn |
IEEE 802.11bn CC50 comments on D0.1 |
Ross Jian Yu (Huawei) |
23-Jun-2025 23:44:31 ET |
Download |
23-Jun-2025 ET |
2025 |
931 |
6 |
TGbn |
PDT-CRs-MAC-LLI |
Mohamed Abouelseoud (Apple) |
23-Jun-2025 18:48:57 ET |
Download |
23-Jun-2025 ET |
2025 |
915 |
2 |
TGbn |
PDT/CR for ELR MAC |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
23-Jun-2025 15:50:53 ET |
Download |
23-Jun-2025 ET |
2025 |
937 |
2 |
TGbn |
CC50 CR for CIDs 3824, 3861, 3862 and 3863 |
Hanqing Lou (InterDigital) |
23-Jun-2025 12:50:52 ET |
Download |
23-Jun-2025 ET |
2025 |
986 |
11 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
23-Jun-2025 12:41:27 ET |
Download |
23-Jun-2025 ET |
2025 |
1064 |
0 |
TGbn |
tgbn-july-2025-meeting-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
23-Jun-2025 17:59:03 ET |
Download |
23-Jun-2025 ET |
2025 |
1001 |
2 |
TGbn |
Adaptive power boosting design for dRU |
Sawaira Ali (Vestel) |
23-Jun-2025 08:49:59 ET |
Download |
23-Jun-2025 ET |
2025 |
1001 |
1 |
TGbn |
Adaptive power boosting design for dRU |
Sawaira Ali (Vestel) |
23-Jun-2025 08:14:39 ET |
Download |
23-Jun-2025 ET |
2025 |
199 |
1 |
TGbn |
power-management-across-multi-link |
Xiangxin Gu (Spreadtrum) |
23-Jun-2025 06:34:11 ET |
Download |
23-Jun-2025 ET |
2025 |
1061 |
0 |
TGbn |
How to further minimize the duration of connectivity loss for SMD BSS transition |
Kyosuke Inoue (SHARP CORPORATION) |
27-Jun-2025 00:04:16 ET |
Download |
22-Jun-2025 ET |
2025 |
1060 |
1 |
TGbn |
TGbn May 2025 Meeting Minutes |
Yusuke Asai (NTT) |
22-Jun-2025 23:27:17 ET |
Download |
22-Jun-2025 ET |
2025 |
1060 |
0 |
TGbn |
TGbn May 2025 Meeting Minutes |
Yusuke Asai (NTT) |
22-Jun-2025 18:58:32 ET |
Download |
20-Jun-2025 ET |
2025 |
552 |
6 |
TGbn |
CR-MAC-cc50-CIDs_related_to_Beacon_Optimization |
Abhishek Patil (Qualcomm) |
20-Jun-2025 02:58:35 ET |
Download |
19-Jun-2025 ET |
2025 |
920 |
2 |
TGbn |
PDT MAC Coex clause6 CID2190 |
Brian Hart (Cisco Systems) |
19-Jun-2025 11:02:05 ET |
Download |
19-Jun-2025 ET |
2025 |
920 |
1 |
TGbn |
PDT MAC Coex clause6 CID2190 |
Brian Hart (Cisco Systems) |
19-Jun-2025 10:49:08 ET |
Download |
19-Jun-2025 ET |
2025 |
931 |
5 |
TGbn |
PDT-CRs-MAC-LLI |
Mohamed Abouelseoud (Apple) |
19-Jun-2025 10:49:27 ET |
Download |
19-Jun-2025 ET |
2025 |
931 |
4 |
TGbn |
PDT-CRs-MAC-LLI |
Mohamed Abouelseoud (Apple) |
19-Jun-2025 04:52:22 ET |
Download |
18-Jun-2025 ET |
2025 |
936 |
7 |
TGbn |
PDT-CR-MAC-NPCA-CC50 |
Matthew Fischer (Broadcom) |
18-Jun-2025 23:03:30 ET |
Download |
18-Jun-2025 ET |
2025 |
915 |
1 |
TGbn |
PDT/CR for ELR MAC |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
18-Jun-2025 19:53:02 ET |
Download |
18-Jun-2025 ET |
2025 |
1050 |
0 |
TGbn |
Channel configuration for NPCA |
Si-Chan Noh (Newracom) |
18-Jun-2025 03:33:36 ET |
Download |
18-Jun-2025 ET |
2025 |
1049 |
0 |
TGbn |
PDT MAC MAPC PASN part 1 |
Jay Yang (ZTE) |
01-Jul-2025 03:02:04 ET |
Download |
17-Jun-2025 ET |
2025 |
495 |
1 |
TGbn |
Considerations in low latency indication |
Yue Qi (Samsung Electronics) |
17-Jun-2025 23:23:54 ET |
Download |
17-Jun-2025 ET |
2025 |
1048 |
0 |
TGbn |
july-2025-mac-phy-adhoc-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
23-Jun-2025 17:59:46 ET |
Download |
17-Jun-2025 ET |
2025 |
986 |
10 |
TGbn |
may-july-tgbn-teleconference-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
17-Jun-2025 13:49:03 ET |
Download |
17-Jun-2025 ET |
2025 |
694 |
2 |
TGbn |
UHR OFDMA Sounding Limitations |
Avner Epstein (Maxlinear) |
17-Jun-2025 11:56:51 ET |
Download |
16-Jun-2025 ET |
2025 |
599 |
16 |
TGbn |
PDT MAC MAPC Signaling and Protocol Aspects |
Giovanni Chisci, Qualcomm Technologies Inc. |
16-Jun-2025 21:20:22 ET |
Download |
16-Jun-2025 ET |
2025 |
638 |
7 |
TGbn |
CRs for CID related to definitions in MAPC scheme |
Chun Huang (ZTE) |
16-Jun-2025 19:49:55 ET |
Download |
16-Jun-2025 ET |
2025 |
936 |
6 |
TGbn |
PDT-CR-MAC-NPCA-CC50 |
Matthew Fischer (Broadcom) |
16-Jun-2025 19:16:15 ET |
Download |
16-Jun-2025 ET |
2025 |
907 |
2 |
TGbn |
CC50 CR for clause 9.4.2.aa1 |
Ming Gan (Huawei) |
16-Jun-2025 18:59:43 ET |
Download |