Created (ET) ▼ |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
31-Jul-2025 ET |
2025 |
1119 |
2 |
TGbi |
D1.0 SN (de)anonymization |
Philip Hawkes (Qualcomm Inc) |
31-Jul-2025 07:03:17 ET |
Download |
31-Jul-2025 ET |
2025 |
1397 |
0 |
PQC SG |
PQC SG July 2025 Closing Report |
Stephen Orr (Cisco) |
31-Jul-2025 07:04:17 ET |
Download |
31-Jul-2025 ET |
2025 |
669 |
11 |
TGbn |
cr cc50 mac cids in clause 37.9.1 |
Liwen Chu (NXP) |
31-Jul-2025 06:54:58 ET |
Download |
31-Jul-2025 ET |
2025 |
1119 |
1 |
TGbi |
D1.0 SN (de)anonymization |
Philip Hawkes (Qualcomm Inc) |
31-Jul-2025 06:51:42 ET |
Download |
31-Jul-2025 ET |
2025 |
744 |
12 |
TGbn |
MAC-PDT-CR-37_12_5-parameter-update |
Sherief Helwa (Qualcomm) |
31-Jul-2025 06:47:24 ET |
Download |
31-Jul-2025 ET |
2025 |
669 |
10 |
TGbn |
cr cc50 mac cids in clause 37.9.1 |
Liwen Chu (NXP) |
31-Jul-2025 06:43:48 ET |
Download |
31-Jul-2025 ET |
2025 |
1164 |
8 |
TGbn |
PDT CR MAC for DSO CC50 |
Morteza Mehrnoush (Apple Inc) |
31-Jul-2025 06:39:19 ET |
Download |
31-Jul-2025 ET |
2025 |
1394 |
1 |
TGbq |
Liaison communication to Telecommunication Engineering Centre re: draft standard on Wi-Fi |
Edward Au (Huawei) |
31-Jul-2025 06:33:33 ET |
Download |
31-Jul-2025 ET |
2025 |
951 |
7 |
TGbi |
D1.0 CIDs in clause 10.71.1 |
Philip Hawkes (Qualcomm Inc) |
31-Jul-2025 06:33:22 ET |
Download |
31-Jul-2025 ET |
2025 |
951 |
6 |
TGbi |
D1.0 CIDs in clause 10.71.1 |
Philip Hawkes (Qualcomm Inc) |
31-Jul-2025 06:29:06 ET |
Download |
31-Jul-2025 ET |
2025 |
1164 |
7 |
TGbn |
PDT CR MAC for DSO CC50 |
Morteza Mehrnoush (Apple Inc) |
31-Jul-2025 06:29:30 ET |
Download |
31-Jul-2025 ET |
2025 |
1027 |
4 |
TGbn |
PDT-MAC-DBE-part 2 |
Binita Gupta (Cisco Systems) |
31-Jul-2025 06:22:41 ET |
Download |
31-Jul-2025 ET |
2025 |
768 |
11 |
TGbn |
PDT MAC and CR Coordinated Beamforming Protocol |
Jason Yuchen Guo (Huawei) |
31-Jul-2025 06:15:08 ET |
Download |
31-Jul-2025 ET |
2025 |
1383 |
2 |
TGbi |
LB288_misc_CIDs_part2 |
Jerome Henry (Cisco) |
31-Jul-2025 06:12:24 ET |
Download |
31-Jul-2025 ET |
2025 |
1383 |
1 |
TGbi |
LB288_misc_CIDs_part2 |
Jerome Henry (Cisco) |
31-Jul-2025 06:12:08 ET |
Download |
31-Jul-2025 ET |
2025 |
1103 |
4 |
TGbi |
D1.0 CIDs in clauses 10.71.3 |
Philip Hawkes (Qualcomm Inc) |
31-Jul-2025 06:10:06 ET |
Download |
31-Jul-2025 ET |
2025 |
1134 |
1 |
TGbn |
CR-MAC-cc50-CIDs_in_clause-37.1 |
George Cherian (Qualcomm) |
31-Jul-2025 06:09:48 ET |
Download |
31-Jul-2025 ET |
2025 |
1396 |
0 |
TGbn |
Overhearing failure handling for Co-BF |
Insik Jung (LGE) |
31-Jul-2025 06:12:16 ET |
Download |
31-Jul-2025 ET |
2025 |
1395 |
0 |
TGbn |
Sounding invite and response frame design |
Insik Jung (LGE) |
31-Jul-2025 06:10:09 ET |
Download |
31-Jul-2025 ET |
2025 |
1027 |
3 |
TGbn |
PDT-MAC-DBE-part 2 |
Binita Gupta (Cisco Systems) |
31-Jul-2025 06:04:05 ET |
Download |
31-Jul-2025 ET |
2025 |
890 |
6 |
TGbn |
D0.1 CC subclause 37.9.2 |
Laurent Cariou (Intel) |
31-Jul-2025 05:58:26 ET |
Download |
31-Jul-2025 ET |
2025 |
1385 |
2 |
TGbi |
D1.0 FA requirements and MIB |
Philip Hawkes (Qualcomm Inc) |
31-Jul-2025 05:57:41 ET |
Download |
31-Jul-2025 ET |
2025 |
890 |
5 |
TGbn |
D0.1 CC subclause 37.9.2 |
Laurent Cariou (Intel) |
31-Jul-2025 05:45:25 ET |
Download |
31-Jul-2025 ET |
2025 |
1055 |
5 |
TGbq |
TGbq agenda - 2025 July plenary |
Edward Au (Huawei) |
31-Jul-2025 05:40:31 ET |
Download |
31-Jul-2025 ET |
2025 |
1326 |
2 |
TGbn |
CC50 NPCA CR for CIDs 1817, 1818, 1819, 1821, 1830, 1822, 1823, 1824, 1831 |
Juseong Moon (KNUT) |
31-Jul-2025 05:42:53 ET |
Download |
31-Jul-2025 ET |
2025 |
1385 |
1 |
TGbi |
D1.0 FA requirements and MIB |
Philip Hawkes (Qualcomm Inc) |
31-Jul-2025 05:37:27 ET |
Download |
31-Jul-2025 ET |
2025 |
847 |
3 |
TGbn |
TGbn Coexistence Assessment Document |
Sigurd Schelstraete (MaxLinear) |
31-Jul-2025 05:36:51 ET |
Download |
31-Jul-2025 ET |
2025 |
1025 |
4 |
TGbn |
PDT MAC UHR Critical Updates Procedures |
Abhishek Patil (Qualcomm) |
31-Jul-2025 05:35:41 ET |
Download |
31-Jul-2025 ET |
2025 |
1091 |
6 |
TGbn |
PDT MAC on modes enablement and parameter updates at the AP |
Gaurang Naik (Qualcomm) |
31-Jul-2025 05:34:50 ET |
Download |
31-Jul-2025 ET |
2025 |
1108 |
3 |
PQC SG |
pqc-protocol-definitions |
Dan Harkins (HPE) |
31-Jul-2025 05:26:25 ET |
Download |
31-Jul-2025 ET |
2024 |
2060 |
4 |
TGbn |
CSR/COBF Protocol Design |
Kosuke Aio (Sony Corporation) |
31-Jul-2025 05:23:51 ET |
Download |
31-Jul-2025 ET |
2025 |
1063 |
8 |
PQC SG |
PQC SG July 2025 Plenary |
Stephen Orr (Cisco) |
31-Jul-2025 05:19:51 ET |
Download |
31-Jul-2025 ET |
2025 |
742 |
3 |
TGbn |
MAC-PDT-CR-37_12_2-internal-error-indication |
Sherief Helwa (Qualcomm) |
31-Jul-2025 05:20:48 ET |
Download |
31-Jul-2025 ET |
2025 |
744 |
11 |
TGbn |
MAC-PDT-CR-37_12_5-parameter-update |
Sherief Helwa (Qualcomm) |
31-Jul-2025 05:18:40 ET |
Download |
31-Jul-2025 ET |
2025 |
946 |
4 |
TGbn |
CC50 PDT-CR MAC on receiving ICF with IFCS |
Vishnu Ratnam (Samsung Electronics) |
31-Jul-2025 06:54:38 ET |
Download |
31-Jul-2025 ET |
2025 |
1394 |
0 |
TGbq |
Liaison communication to Telecommunication Engineering Centre re: draft standard on Wi-Fi |
Edward Au (Huawei) |
31-Jul-2025 05:12:28 ET |
Download |
31-Jul-2025 ET |
2025 |
1101 |
5 |
TGbn |
PDT-CR MAC on Seamless Roaming Part 5 |
Duncan Ho (Qualcomm Technologies, Inc.) |
31-Jul-2025 05:02:52 ET |
Download |
31-Jul-2025 ET |
2025 |
1163 |
5 |
TGbn |
CR for CID 2446 - ICR parameters in Co-TDMA |
Klaus Doppler (Nokia) |
31-Jul-2025 04:58:03 ET |
Download |
31-Jul-2025 ET |
2025 |
1101 |
4 |
TGbn |
PDT-CR MAC on Seamless Roaming Part 5 |
Duncan Ho (Qualcomm Technologies, Inc.) |
31-Jul-2025 04:51:32 ET |
Download |
31-Jul-2025 ET |
2025 |
1163 |
4 |
TGbn |
CR for CID 2446 - ICR parameters in Co-TDMA |
Klaus Doppler (Nokia) |
31-Jul-2025 04:45:11 ET |
Download |
31-Jul-2025 ET |
2025 |
1163 |
3 |
TGbn |
CR for CID 2446 - ICR parameters in Co-TDMA |
Klaus Doppler (Nokia) |
31-Jul-2025 04:40:18 ET |
Download |
31-Jul-2025 ET |
2025 |
1091 |
5 |
TGbn |
PDT MAC on modes enablement and parameter updates at the AP |
Gaurang Naik (Qualcomm) |
31-Jul-2025 04:31:21 ET |
Download |
31-Jul-2025 ET |
2025 |
890 |
4 |
TGbn |
D0.1 CC subclause 37.9.2 |
Laurent Cariou (Intel) |
31-Jul-2025 04:28:45 ET |
Download |
31-Jul-2025 ET |
2025 |
1063 |
7 |
PQC SG |
PQC SG July 2025 Plenary |
Stephen Orr (Cisco) |
31-Jul-2025 04:17:01 ET |
Download |
31-Jul-2025 ET |
2025 |
669 |
9 |
TGbn |
cr cc50 mac cids in clause 37.9.1 |
Liwen Chu (NXP) |
31-Jul-2025 04:04:04 ET |
Download |
31-Jul-2025 ET |
2025 |
155 |
7 |
TGbi |
SAE password identifier update |
Jouni Malinen (Qualcomm) |
31-Jul-2025 03:54:55 ET |
Download |
31-Jul-2025 ET |
2025 |
1164 |
6 |
TGbn |
PDT CR MAC for DSO CC50 |
Morteza Mehrnoush (Apple Inc) |
31-Jul-2025 03:50:31 ET |
Download |
31-Jul-2025 ET |
2024 |
2060 |
3 |
TGbn |
CSR/COBF Protocol Design |
Kosuke Aio (Sony Corporation) |
31-Jul-2025 03:43:22 ET |
Download |
31-Jul-2025 ET |
2025 |
1082 |
7 |
TGbn |
PDT-MAC-Co-TDMA-CR-CC50-Part-3 |
Sanket Kalamkar (Qualcomm Technologies Inc.) |
31-Jul-2025 03:35:15 ET |
Download |
31-Jul-2025 ET |
2025 |
1080 |
3 |
TGbn |
CC50: Switching back condition for NPCA operation |
Dongju Cha (LG Electronics) |
31-Jul-2025 03:29:00 ET |
Download |
31-Jul-2025 ET |
2025 |
639 |
5 |
TGbn |
CC50 CR for CIDs related to AP ID assignment |
Chun Huang (ZTE) |
31-Jul-2025 03:21:26 ET |
Download |
31-Jul-2025 ET |
2025 |
669 |
8 |
TGbn |
cr cc50 mac cids in clause 37.9.1 |
Liwen Chu (NXP) |
31-Jul-2025 03:16:30 ET |
Download |
31-Jul-2025 ET |
2025 |
993 |
2 |
TGbn |
CC50 CR for CIDs 1437, 1906, 1907, 1908 - Overlapping Quiet Interval for Co-RTWT |
Hank Hyeonjun Sung (WILUS) |
31-Jul-2025 03:14:08 ET |
Download |
31-Jul-2025 ET |
2025 |
155 |
6 |
TGbi |
SAE password identifier update |
Jouni Malinen (Qualcomm) |
31-Jul-2025 03:10:50 ET |
Download |
31-Jul-2025 ET |
2025 |
1091 |
4 |
TGbn |
PDT MAC on modes enablement and parameter updates at the AP |
Gaurang Naik (Qualcomm) |
31-Jul-2025 03:00:24 ET |
Download |
31-Jul-2025 ET |
2025 |
1163 |
2 |
TGbn |
CR for CID 2446 - ICR parameters in Co-TDMA |
Klaus Doppler (Nokia) |
31-Jul-2025 02:21:20 ET |
Download |
31-Jul-2025 ET |
2025 |
1064 |
11 |
TGbn |
tgbn-july-2025-meeting-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
31-Jul-2025 02:18:20 ET |
Download |
31-Jul-2025 ET |
2025 |
14 |
33 |
TGbn |
tgbn-motions-list-part-2 |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
31-Jul-2025 02:17:27 ET |
Download |
31-Jul-2025 ET |
2025 |
1065 |
5 |
TGbi |
TGbi July Plenary Agenda |
Carol Ansley (Cox) |
31-Jul-2025 02:16:54 ET |
Download |
31-Jul-2025 ET |
2025 |
1257 |
2 |
TGbp |
WUR-based frame formats for AMP devices |
Kamran Nishat (HaiLa Technologies) |
31-Jul-2025 01:57:44 ET |
Download |
31-Jul-2025 ET |
2025 |
286 |
12 |
TGbi |
IEEE 802.11bi LB288 comments |
Po-Kai Huang (Intel) |
31-Jul-2025 01:34:07 ET |
Download |
31-Jul-2025 ET |
2025 |
1084 |
3 |
TGbn |
CR for 38.3.5 (Interference Mitigation) |
Shimi Shilo (Huawei) |
31-Jul-2025 00:58:44 ET |
Download |
31-Jul-2025 ET |
2025 |
669 |
7 |
TGbn |
cr cc50 mac cids in clause 37.9.1 |
Liwen Chu (NXP) |
31-Jul-2025 00:39:16 ET |
Download |
30-Jul-2025 ET |
2025 |
1165 |
3 |
TGbn |
Resolutions for some comments on 11bn/D0.1 (CC50) |
Mark RISON (Samsung) |
30-Jul-2025 23:28:53 ET |
Download |
30-Jul-2025 ET |
2025 |
1027 |
2 |
TGbn |
PDT-MAC-DBE-part 2 |
Binita Gupta (Cisco Systems) |
30-Jul-2025 19:27:46 ET |
Download |
30-Jul-2025 ET |
2025 |
1025 |
3 |
TGbn |
PDT MAC UHR Critical Updates Procedures |
Abhishek Patil (Qualcomm) |
30-Jul-2025 19:10:04 ET |
Download |
30-Jul-2025 ET |
2025 |
1082 |
6 |
TGbn |
PDT-MAC-Co-TDMA-CR-CC50-Part-3 |
Sanket Kalamkar (Qualcomm Technologies Inc.) |
30-Jul-2025 18:52:13 ET |
Download |
30-Jul-2025 ET |
2025 |
1258 |
2 |
TGbp |
WUR-based Trigger frame for AMP devices |
Kamran Nishat (HaiLa Technologies) |
30-Jul-2025 17:31:56 ET |
Download |
30-Jul-2025 ET |
2025 |
669 |
6 |
TGbn |
cr cc50 mac cids in clause 37.9.1 |
Liwen Chu (NXP) |
30-Jul-2025 16:41:41 ET |
Download |
30-Jul-2025 ET |
2025 |
1065 |
4 |
TGbi |
TGbi July Plenary Agenda |
Carol Ansley (Cox) |
30-Jul-2025 15:32:44 ET |
Download |
30-Jul-2025 ET |
2025 |
946 |
3 |
TGbn |
CC50 PDT-CR MAC on receiving ICF with IFCS |
Vishnu Ratnam (Samsung Electronics) |
30-Jul-2025 13:10:58 ET |
Download |
30-Jul-2025 ET |
2025 |
882 |
16 |
TGbn |
PDT MAC UHR operating mode and parameter updates |
Gaurang Naik (Qualcomm) |
30-Jul-2025 12:27:56 ET |
Download |
30-Jul-2025 ET |
2025 |
1122 |
4 |
TGbi |
CIDs for Clause 10.71.2_part 2 |
Antonio de la Oliva, Interdigital |
30-Jul-2025 12:19:34 ET |
Download |
30-Jul-2025 ET |
2025 |
1030 |
6 |
802.11 WG |
2025 July WG11 Agenda |
Robert Stacey (Intel) |
30-Jul-2025 12:09:43 ET |
Download |
30-Jul-2025 ET |
2025 |
1112 |
4 |
TGbi |
CR Epoch start time computation Part 2 |
Stephane Baron (Canon) |
30-Jul-2025 12:05:44 ET |
Download |
30-Jul-2025 ET |
2025 |
1122 |
3 |
TGbi |
CIDs for Clause 10.71.2_part 2 |
Antonio de la Oliva, Interdigital |
30-Jul-2025 12:04:09 ET |
Download |
30-Jul-2025 ET |
2025 |
1102 |
1 |
TGbp |
AMP Frame format |
Rojan Chitrakar (Huawei) |
30-Jul-2025 12:02:23 ET |
Download |
30-Jul-2025 ET |
2025 |
882 |
15 |
TGbn |
PDT MAC UHR operating mode and parameter updates |
Gaurang Naik (Qualcomm) |
30-Jul-2025 12:01:59 ET |
Download |
30-Jul-2025 ET |
2025 |
890 |
3 |
TGbn |
D0.1 CC subclause 37.9.2 |
Laurent Cariou (Intel) |
30-Jul-2025 11:48:56 ET |
Download |
30-Jul-2025 ET |
2025 |
1062 |
4 |
ARC SC |
ARC SC agenda July 2025 |
Mark Hamilton (Ruckus/CommScope) |
30-Jul-2025 11:43:20 ET |
Download |
30-Jul-2025 ET |
2025 |
744 |
10 |
TGbn |
MAC-PDT-CR-37_12_5-parameter-update |
Sherief Helwa (Qualcomm) |
30-Jul-2025 11:36:49 ET |
Download |
30-Jul-2025 ET |
2025 |
1082 |
5 |
TGbn |
PDT-MAC-Co-TDMA-CR-CC50-Part-3 |
Sanket Kalamkar (Qualcomm Technologies Inc.) |
30-Jul-2025 11:31:05 ET |
Download |
30-Jul-2025 ET |
2025 |
1047 |
1 |
802.11 WG |
July-2025-working-group-motions |
Stephen McCann (Huawei) |
30-Jul-2025 11:29:55 ET |
Download |
30-Jul-2025 ET |
2025 |
931 |
12 |
TGbn |
PDT-CRs-MAC-LLI |
Mohamed Abouelseoud (Apple) |
30-Jul-2025 11:22:22 ET |
Download |
30-Jul-2025 ET |
2025 |
1393 |
0 |
ARC SC |
ARC closing report July 2025 |
Mark Hamilton (Ruckus/CommScope) |
31-Jul-2025 14:05:14 ET |
Download |
30-Jul-2025 ET |
2025 |
744 |
9 |
TGbn |
MAC-PDT-CR-37_12_5-parameter-update |
Sherief Helwa (Qualcomm) |
30-Jul-2025 11:09:08 ET |
Download |
30-Jul-2025 ET |
2025 |
1115 |
3 |
TGbn |
CC50 CR for miscellaneous cids |
Yan Li(ZTE) |
30-Jul-2025 11:05:57 ET |
Download |
30-Jul-2025 ET |
2025 |
753 |
5 |
TGbn |
PDT MAC on Seamless Roaming Part 3 |
Duncan Ho (Qualcomm Technologies, Inc.) |
30-Jul-2025 10:54:15 ET |
Download |
30-Jul-2025 ET |
2025 |
1101 |
3 |
TGbn |
PDT-CR MAC on Seamless Roaming Part 5 |
Duncan Ho (Qualcomm Technologies, Inc.) |
30-Jul-2025 10:47:40 ET |
Download |
30-Jul-2025 ET |
2025 |
1082 |
4 |
TGbn |
PDT-MAC-Co-TDMA-CR-CC50-Part-3 |
Sanket Kalamkar (Qualcomm Technologies Inc.) |
30-Jul-2025 10:44:25 ET |
Download |
30-Jul-2025 ET |
2025 |
907 |
5 |
TGbn |
CC50 CR for clause 9.4.2.aa1 |
Ming Gan (Huawei) |
30-Jul-2025 10:19:43 ET |
Download |
30-Jul-2025 ET |
2025 |
768 |
10 |
TGbn |
PDT MAC and CR Coordinated Beamforming Protocol |
Jason Yuchen Guo (Huawei) |
30-Jul-2025 11:42:07 ET |
Download |
30-Jul-2025 ET |
2025 |
753 |
4 |
TGbn |
PDT MAC on Seamless Roaming Part 3 |
Duncan Ho (Qualcomm Technologies, Inc.) |
30-Jul-2025 09:52:40 ET |
Download |
30-Jul-2025 ET |
2025 |
193 |
5 |
ARC SC |
Frame exchange sequence and FIG 10_14 |
Graham Smith (SRT wireless) |
30-Jul-2025 09:45:41 ET |
Download |
30-Jul-2025 ET |
2025 |
1064 |
10 |
TGbn |
tgbn-july-2025-meeting-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
30-Jul-2025 09:09:39 ET |
Download |
30-Jul-2025 ET |
2025 |
1064 |
9 |
TGbn |
tgbn-july-2025-meeting-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
30-Jul-2025 08:34:49 ET |
Download |
30-Jul-2025 ET |
2025 |
1053 |
1 |
WNG SC |
Agenda for WNG SC 2025-July |
Jim Lansford (FaraFir SRL) |
30-Jul-2025 07:41:55 ET |
Download |
30-Jul-2025 ET |
2025 |
1391 |
0 |
WNG SC |
2025 July WNG closing report |
Jim Lansford (FaraFir SRL) |
31-Jul-2025 11:53:58 ET |
Download |
30-Jul-2025 ET |
2025 |
1049 |
7 |
TGbn |
PDT MAC MAPC PASN part 1 |
Jay Yang (ZTE) |
30-Jul-2025 07:14:29 ET |
Download |
30-Jul-2025 ET |
2025 |
1080 |
2 |
TGbn |
CC50: Switching back condition for NPCA operation |
Dongju Cha (LG Electronics) |
30-Jul-2025 07:09:58 ET |
Download |