Created (ET) ▼ |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
17-Sep-2025 ET |
2025 |
1015 |
1 |
TGbn |
P-EDCA in NPCA Operation |
Gwangho Lee (KNUT) |
17-Sep-2025 04:19:08 ET |
Download |
17-Sep-2025 ET |
2025 |
1499 |
1 |
TGbn |
OBSS R-TWT SP based NPCA |
Rishabh Roy (Samsung Electronics) |
17-Sep-2025 03:46:30 ET |
Download |
17-Sep-2025 ET |
2025 |
1497 |
3 |
TGbn |
Enabling Co-BF and Co-SR for Co-RTWT Negotiation and Operation |
Rishabh Roy(Samsung Electronics) |
17-Sep-2025 03:38:19 ET |
Download |
17-Sep-2025 ET |
2025 |
1430 |
4 |
TGbp |
tg-bp-meeting-agenda-for-sep-interim-2025 |
Bo Sun (Sanechips) |
17-Sep-2025 02:48:14 ET |
Download |
17-Sep-2025 ET |
2025 |
654 |
1 |
TGbn |
Dynamic MPDU Adjustment for A-MPDU Transmission |
Ravi Gidvani (Samsung) |
17-Sep-2025 02:33:52 ET |
Download |
17-Sep-2025 ET |
2025 |
1676 |
0 |
TGbh |
TGbh awards |
Mark Hamilton (Ruckus/CommScope) |
17-Sep-2025 14:00:24 ET |
Download |
16-Sep-2025 ET |
2025 |
270 |
7 |
TGm |
Beacon modification for reduced ANQP exchange induced latency |
Azin Neishaboori (General Motors) |
16-Sep-2025 23:55:00 ET |
Download |
16-Sep-2025 ET |
2025 |
1675 |
1 |
TGbn |
NDPA Indication of Cross-BSS Sounding Feedback Status |
Mahmoud Kamel (InterDigital) |
16-Sep-2025 23:49:47 ET |
Download |
16-Sep-2025 ET |
2025 |
1675 |
0 |
TGbn |
NDPA Indication of Cross-BSS Sounding Feedback Status |
Mahmoud Kamel (InterDigital) |
16-Sep-2025 23:47:53 ET |
Download |
16-Sep-2025 ET |
2025 |
1469 |
1 |
TGbn |
Smarter Sub-band Transition Strategies for DSO |
Kerstin Johnsson (Nokia) |
16-Sep-2025 22:50:23 ET |
Download |
16-Sep-2025 ET |
2025 |
1034 |
1 |
TGbn |
OBSS CSI Report Check for Co-BF |
Kosuke Aio (Sony Corporation) |
16-Sep-2025 22:15:35 ET |
Download |
16-Sep-2025 ET |
2025 |
1674 |
0 |
TGbn |
Further consideration on Co-TDMA for 11bn |
Lei Zhou (New H3C technologies co. ltd) |
16-Sep-2025 21:52:26 ET |
Download |
16-Sep-2025 ET |
2025 |
1490 |
2 |
TGm |
CR for PASN ID in MLO |
Yan Li(ZTE) |
16-Sep-2025 21:22:51 ET |
Download |
16-Sep-2025 ET |
2025 |
1673 |
0 |
802.11 WG |
WBA Liaison Report - September 2025 |
Necati Canpolat (Intel) |
16-Sep-2025 21:27:23 ET |
Download |
16-Sep-2025 ET |
2025 |
1433 |
3 |
TGm |
REVmf Agenda September 2025 Session |
Michael Montemurro (Huawei) |
16-Sep-2025 21:19:51 ET |
Download |
16-Sep-2025 ET |
2025 |
1509 |
3 |
TGm |
Country Element in 6 GHz |
Youhan Kim (Qualcomm Technologies, Inc.) |
16-Sep-2025 20:27:22 ET |
Download |
16-Sep-2025 ET |
2025 |
1559 |
1 |
TGbp |
AMP-S1G DL and UL Data Rate |
Panpan Li (Huawei) |
16-Sep-2025 20:19:57 ET |
Download |
16-Sep-2025 ET |
2025 |
1672 |
0 |
TGbi |
fixing-ptk-derivation |
Dan Harkins (HPE) |
16-Sep-2025 20:20:39 ET |
Download |
16-Sep-2025 ET |
2025 |
1486 |
1 |
TGbn |
Further Considerations on Co-BF Transmission Sequence |
Mahmoud Hasabelnaby (Huawei) |
16-Sep-2025 20:05:21 ET |
Download |
16-Sep-2025 ET |
2025 |
1491 |
4 |
TGm |
CR for editorial fix in device ID mechanism |
Yan Li(ZTE) |
16-Sep-2025 19:58:15 ET |
Download |
16-Sep-2025 ET |
2025 |
1671 |
0 |
WNG SC |
WNG Meeting Minutes 2025-09 Waikoloa |
Lei Wang (Futurewei/Huawei) |
17-Sep-2025 15:00:25 ET |
Download |
16-Sep-2025 ET |
2025 |
1509 |
2 |
TGm |
Country Element in 6 GHz |
Youhan Kim (Qualcomm Technologies, Inc.) |
16-Sep-2025 19:26:18 ET |
Download |
16-Sep-2025 ET |
2025 |
1408 |
2 |
TGbq |
TGbq agenda - 2025 September wireless interim |
Edward Au (Huawei) |
16-Sep-2025 18:36:01 ET |
Download |
16-Sep-2025 ET |
2025 |
1555 |
3 |
TGbi |
CR for Miscellaneous CIDs |
Po-Kai Huang (Intel) |
16-Sep-2025 18:11:28 ET |
Download |
16-Sep-2025 ET |
2025 |
1600 |
3 |
TGbp |
PDT WPT Signal Coexistence |
KE WANG (OPPO) |
16-Sep-2025 18:03:32 ET |
Download |
16-Sep-2025 ET |
2025 |
1580 |
1 |
TGbp |
Follow-up on Sync field for AMP PPDU |
KE WANG (OPPO) |
16-Sep-2025 17:47:01 ET |
Download |
16-Sep-2025 ET |
2025 |
1609 |
2 |
TGbn |
2x LDPC usage at shared AP for CoBF |
Sameer Vermani (Qualcomm) |
16-Sep-2025 17:23:10 ET |
Download |
16-Sep-2025 ET |
2025 |
1542 |
1 |
TGbp |
AMP Random Access Simulation |
Qingrui Pan (Huawei) |
16-Sep-2025 17:15:09 ET |
Download |
16-Sep-2025 ET |
2025 |
1457 |
1 |
TGm |
LB289 CR for 9.6.38.14 |
Frank Hsu (Mediatek Inc.) |
16-Sep-2025 17:26:34 ET |
Download |
16-Sep-2025 ET |
2025 |
1176 |
3 |
TGbn |
Unused Tone EVM for DRU |
Lin Yang (Qualcomm Inc.) |
16-Sep-2025 17:11:02 ET |
Download |
16-Sep-2025 ET |
2025 |
1541 |
2 |
TGbp |
Thoughts on Bistatic Backscatter |
Nelson Costa (HaiLa Technologies) |
16-Sep-2025 17:06:46 ET |
Download |
16-Sep-2025 ET |
2025 |
1289 |
1 |
TGbn |
Coordinated Puncturing for MAP |
Yanchun Li (Huawei) |
16-Sep-2025 16:55:05 ET |
Download |
16-Sep-2025 ET |
2025 |
1156 |
4 |
TGm |
CFP support for ranging and sensing trigger frames |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
16-Sep-2025 16:45:46 ET |
Download |
16-Sep-2025 ET |
2025 |
1430 |
3 |
TGbp |
tg-bp-meeting-agenda-for-sep-interim-2025 |
Bo Sun (Sanechips) |
16-Sep-2025 16:30:29 ET |
Download |
16-Sep-2025 ET |
2025 |
1355 |
4 |
TGbn |
NPCA EDCA Slot Boundaries |
Mikhail Liubogoshchev (Nokia) |
16-Sep-2025 16:31:00 ET |
Download |
16-Sep-2025 ET |
2025 |
1366 |
2 |
TGbn |
Consideration for NPCA during AP PUO |
Gwangho Lee (KNUT) |
16-Sep-2025 16:12:38 ET |
Download |
16-Sep-2025 ET |
2025 |
1497 |
2 |
TGbn |
Enabling Co-BF and Co-SR for Co-RTWT Negotiation and Operation |
Rishabh Roy(Samsung Electronics) |
16-Sep-2025 16:14:19 ET |
Download |
16-Sep-2025 ET |
2025 |
1626 |
2 |
TGbi |
SAE comments LB290 |
Jouni Malinen (Qualcomm) |
16-Sep-2025 15:58:46 ET |
Download |
16-Sep-2025 ET |
2025 |
1609 |
1 |
TGbn |
2x LDPC usage at shared AP for CoBF |
Sameer Vermani (Qualcomm) |
16-Sep-2025 15:50:24 ET |
Download |
16-Sep-2025 ET |
2025 |
1341 |
1 |
TGbq |
Discussion on mmWave Link Management |
Liuming Lu (OPPO) |
16-Sep-2025 15:36:53 ET |
Download |
16-Sep-2025 ET |
2025 |
1507 |
6 |
TGm |
DSSS Tx Power Ramp |
Youhan Kim (Qualcomm Technologies, Inc.) |
16-Sep-2025 15:36:13 ET |
Download |
16-Sep-2025 ET |
2025 |
1357 |
3 |
TGbp |
PDT WPT Energizer control |
Ian Bajaj (Huawei) |
16-Sep-2025 15:28:46 ET |
Download |
16-Sep-2025 ET |
2025 |
1606 |
1 |
TGbn |
Discussion on AOM parameters |
Kiseon Ryu (Wilus Inc.) |
16-Sep-2025 15:26:12 ET |
Download |
16-Sep-2025 ET |
2025 |
1633 |
1 |
TGbq |
IMMW Range Extension Follow-up |
Safi Hoque (Ofinno) |
16-Sep-2025 15:12:31 ET |
Download |
16-Sep-2025 ET |
2025 |
1670 |
0 |
TGbn |
2x LDPC related spec text changes for CoBF |
Sameer Vermani (Qualcomm) |
16-Sep-2025 15:38:37 ET |
Download |
16-Sep-2025 ET |
2025 |
1661 |
1 |
TGbn |
TGbn September MAC Ad Hoc Meeting Minutes |
Kiseon Ryu (Wilus Inc.) |
16-Sep-2025 14:59:49 ET |
Download |
16-Sep-2025 ET |
2025 |
1511 |
4 |
TGm |
Clarification on TX spectral mask measurement |
Youhan Kim (Qualcomm Technologies, Inc.) |
16-Sep-2025 14:43:11 ET |
Download |
16-Sep-2025 ET |
2025 |
893 |
1 |
TGbn |
Remaining Issue for NPCA |
Jeongki Kim (Ofinno) |
16-Sep-2025 16:29:46 ET |
Download |
16-Sep-2025 ET |
2025 |
1507 |
5 |
TGm |
DSSS Tx Power Ramp |
Youhan Kim (Qualcomm Technologies, Inc.) |
16-Sep-2025 14:34:38 ET |
Download |
16-Sep-2025 ET |
2025 |
1667 |
0 |
TGbi |
10.71.5.1 LB290 Comments |
Philip Hawkes (Qualcomm Inc) |
16-Sep-2025 14:40:28 ET |
Download |
16-Sep-2025 ET |
2025 |
1567 |
1 |
TGbp |
WPT PHY Design Considerations |
Yinan Qi (OPPO) |
16-Sep-2025 14:22:38 ET |
Download |
16-Sep-2025 ET |
2025 |
1568 |
2 |
TGbp |
PDT AMP Uplink PPDU Format |
Yinan Qi (OPPO) |
16-Sep-2025 14:21:36 ET |
Download |
16-Sep-2025 ET |
2025 |
1555 |
2 |
TGbi |
CR for Miscellaneous CIDs |
Po-Kai Huang (Intel) |
16-Sep-2025 14:09:12 ET |
Download |
16-Sep-2025 ET |
2025 |
1277 |
3 |
TGm |
Neighbor And Beacon Report S1G |
Dave Halasz (Morse Micro) |
16-Sep-2025 14:08:47 ET |
Download |
16-Sep-2025 ET |
2025 |
1428 |
2 |
ARC SC |
ARC SC agenda Sept 2025 |
Mark Hamilton (Ruckus/CommScope) |
16-Sep-2025 14:08:11 ET |
Download |
16-Sep-2025 ET |
2025 |
1433 |
2 |
TGm |
REVmf Agenda September 2025 Session |
Michael Montemurro (Huawei) |
16-Sep-2025 14:07:50 ET |
Download |
16-Sep-2025 ET |
2025 |
1635 |
1 |
TGbt |
An Improved PQC PAKE |
Chu-Meng Wang (ZTE) |
16-Sep-2025 14:05:44 ET |
Download |
16-Sep-2025 ET |
2025 |
1156 |
3 |
TGm |
CFP support for ranging and sensing trigger frames |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
16-Sep-2025 13:35:45 ET |
Download |
16-Sep-2025 ET |
2025 |
1441 |
2 |
TGbi |
September Interim TGbi Agenda |
Carol Ansley (Cox) |
16-Sep-2025 13:02:59 ET |
Download |
16-Sep-2025 ET |
2025 |
1491 |
3 |
TGm |
CR for editorial fix in device ID mechanism |
Yan Li(ZTE) |
16-Sep-2025 13:02:11 ET |
Download |
16-Sep-2025 ET |
2025 |
1440 |
2 |
802.11 WG |
September 2025 Editors Meeting |
Edward Au (Huawei) |
16-Sep-2025 12:54:13 ET |
Download |
16-Sep-2025 ET |
2025 |
1612 |
5 |
TGm |
Proposed resolution for REVmf LB289 comments |
Edward Au (Huawei) |
16-Sep-2025 12:34:37 ET |
Download |
16-Sep-2025 ET |
2025 |
1666 |
0 |
TGbi |
Comments 9.6.6.6 |
Antonio de la Oliva, Interdigital |
16-Sep-2025 12:05:51 ET |
Download |
16-Sep-2025 ET |
2025 |
1665 |
0 |
TGbi |
Comments 9.4.1.84 |
Antonio de la Oliva, Interdigital |
16-Sep-2025 12:04:31 ET |
Download |
16-Sep-2025 ET |
2025 |
1664 |
0 |
TGbi |
Comments 9.6.42.5 |
Antonio de la Oliva, Interdigital |
16-Sep-2025 12:02:46 ET |
Download |
16-Sep-2025 ET |
2025 |
1404 |
2 |
AIML TIG/SC |
AIML SC Sept 2025 Hawaii Interim Agenda |
Xiaofei WANG (InterDigital) |
16-Sep-2025 11:46:42 ET |
Download |
16-Sep-2025 ET |
2025 |
1605 |
1 |
TGbt |
TGbt Agenda - 2025 September Wireless Interim |
Stephen Orr (Cisco) |
16-Sep-2025 11:21:31 ET |
Download |
16-Sep-2025 ET |
2025 |
1648 |
1 |
TGbr |
ELC_MLD_Mapping_Proposal |
Aravindh Krishnamoorthy (University of Cambridge) |
16-Sep-2025 10:48:47 ET |
Download |
16-Sep-2025 ET |
2025 |
1663 |
0 |
TGbi |
Comment resolution for some comments in 10.71.7 |
Domenico Ficara (Cisco) |
16-Sep-2025 09:17:28 ET |
Download |
16-Sep-2025 ET |
2025 |
1478 |
1 |
AIML TIG/SC |
AIML activities in 3GPP |
Jim Lansford (DeepSig, Inc) |
16-Sep-2025 05:33:33 ET |
Download |
16-Sep-2025 ET |
2025 |
1621 |
1 |
TGbn |
LTF Design for Co-SR Channel Estimation |
Ying Wang (InterDigital) |
16-Sep-2025 05:11:50 ET |
Download |
16-Sep-2025 ET |
2025 |
1598 |
1 |
TGbp |
PDT AMP MAC introduction |
Zhanjing Bao (ZTE) |
16-Sep-2025 04:27:42 ET |
Download |
16-Sep-2025 ET |
2025 |
1661 |
0 |
TGbn |
TGbn September MAC Ad Hoc Meeting Minutes |
Kiseon Ryu (Wilus Inc.) |
16-Sep-2025 02:53:22 ET |
Download |
16-Sep-2025 ET |
2025 |
1660 |
0 |
TGbn |
Considerations on DBE Mechanism |
Shravan (Huawei) |
16-Sep-2025 02:52:05 ET |
Download |
15-Sep-2025 ET |
2025 |
1526 |
1 |
802.11 WG |
802.18 liaison report - September 2025 |
Edward Au (Huawei) |
15-Sep-2025 23:56:52 ET |
Download |
15-Sep-2025 ET |
2025 |
1612 |
4 |
TGm |
Proposed resolution for REVmf LB289 comments |
Edward Au (Huawei) |
16-Sep-2025 12:30:49 ET |
Download |
15-Sep-2025 ET |
2025 |
1634 |
1 |
TGbt |
Proposed Texts for CNSA 2.0 |
Po-Kai Huang (Intel) |
15-Sep-2025 23:18:26 ET |
Download |
15-Sep-2025 ET |
2025 |
1507 |
4 |
TGm |
DSSS Tx Power Ramp |
Youhan Kim (Qualcomm Technologies, Inc.) |
15-Sep-2025 23:11:27 ET |
Download |
15-Sep-2025 ET |
2025 |
1511 |
3 |
TGm |
Clarification on TX spectral mask measurement |
Youhan Kim (Qualcomm Technologies, Inc.) |
15-Sep-2025 23:05:41 ET |
Download |
15-Sep-2025 ET |
2025 |
1491 |
2 |
TGm |
CR for editorial fix in device ID mechanism |
Yan Li(ZTE) |
15-Sep-2025 22:58:45 ET |
Download |
15-Sep-2025 ET |
2023 |
880 |
12 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
15-Sep-2025 22:58:03 ET |
Download |
15-Sep-2025 ET |
2025 |
723 |
4 |
TGm |
802.11REVmf Editor's Report |
Po-Kai Huang (Intel) |
15-Sep-2025 22:43:24 ET |
Download |
15-Sep-2025 ET |
2025 |
1476 |
1 |
TGm |
LB289 CR on Replacement link |
Rubayet Shafin (Samsung Electronics) |
15-Sep-2025 22:36:00 ET |
Download |
15-Sep-2025 ET |
2025 |
1592 |
1 |
TGbt |
draft-text-pqc-protocols |
Dan Harkins (HPE) |
15-Sep-2025 22:24:20 ET |
Download |
15-Sep-2025 ET |
2025 |
1433 |
1 |
TGm |
REVmf Agenda September 2025 Session |
Michael Montemurro (Huawei) |
15-Sep-2025 22:13:27 ET |
Download |
15-Sep-2025 ET |
2025 |
1612 |
3 |
TGm |
Proposed resolution for REVmf LB289 comments |
Edward Au (Huawei) |
15-Sep-2025 22:12:42 ET |
Download |
15-Sep-2025 ET |
2025 |
1544 |
1 |
TGbp |
PDT Downlink waveform generation |
Rui Cao (NXP) |
15-Sep-2025 22:12:23 ET |
Download |
15-Sep-2025 ET |
2025 |
1545 |
1 |
TGbp |
PDT Uplink carrier center frequency |
Rui Cao (NXP) |
15-Sep-2025 22:11:38 ET |
Download |
15-Sep-2025 ET |
2025 |
1432 |
4 |
TGbn |
tgbn-september-2025-meeting-agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
15-Sep-2025 22:08:04 ET |
Download |
15-Sep-2025 ET |
2025 |
1541 |
1 |
TGbp |
Thoughts on Bistatic Backscatter |
Nelson Costa (HaiLa Technologies) |
15-Sep-2025 22:06:15 ET |
Download |
15-Sep-2025 ET |
2025 |
1601 |
1 |
UCM TIG |
Agenda for UCM TIG September 2025 |
Volker Jungnickel (Fraunhofer HHI) |
15-Sep-2025 21:54:36 ET |
Download |
15-Sep-2025 ET |
2025 |
1616 |
1 |
TGbp |
PDT AMP TSF |
Chuanfeng He (OPPO) |
15-Sep-2025 21:35:37 ET |
Download |
15-Sep-2025 ET |
2025 |
1615 |
2 |
TGbp |
PDT Duty-cycle operation |
Chuanfeng He (OPPO) |
15-Sep-2025 21:26:39 ET |
Download |
15-Sep-2025 ET |
2025 |
1659 |
0 |
TGbt |
Authentication Frame Fragmentation flow |
Michael Montemurro (Huawei) |
17-Sep-2025 18:33:36 ET |
Download |
15-Sep-2025 ET |
2025 |
288 |
5 |
TGm |
Puncturing with Low Power Indoor APs |
Pelin Salem (Cisco Systems) |
15-Sep-2025 21:22:24 ET |
Download |
15-Sep-2025 ET |
2025 |
1599 |
2 |
TGbp |
PDT AMP Downlink Synchronization Field |
Weijie Xu (OPPO) |
15-Sep-2025 21:06:35 ET |
Download |
15-Sep-2025 ET |
2025 |
1571 |
1 |
Auto TIG |
Further Consideration on HD-Map Downloads and Sensor-Data Sharing Use cases |
Jing Ma (Toyota) |
15-Sep-2025 20:57:06 ET |
Download |
15-Sep-2025 ET |
2025 |
1615 |
1 |
TGbp |
PDT Duty-cycle operation |
Chuanfeng He (OPPO) |
15-Sep-2025 20:53:41 ET |
Download |
15-Sep-2025 ET |
2025 |
1413 |
5 |
802.11 WG |
2025 September WG11 Agenda |
Robert Stacey (Intel) |
15-Sep-2025 20:47:33 ET |
Download |
15-Sep-2025 ET |
2025 |
1408 |
1 |
TGbq |
TGbq agenda - 2025 September wireless interim |
Edward Au (Huawei) |
15-Sep-2025 20:55:25 ET |
Download |