Created (ET) |
Year |
DCN |
Rev |
Group ▼ |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
03-Sep-2024 ET |
2024 |
1344 |
6 |
TGbn |
802.11bn MAC Ad Hoc Minutes July-Sept 2024 |
Srinivas Kandala (Samsung Electronics) |
03-Sep-2024 17:23:40 ET |
Download |
03-Sep-2024 ET |
2024 |
1510 |
0 |
TGbn |
Open issues on DRU |
Lin Yang (Qualcomm Inc.) |
08-Sep-2024 16:26:06 ET |
Download |
03-Sep-2024 ET |
2024 |
1508 |
0 |
TGbn |
Channel Protection In ELR Scenarios |
Yunbo Li (Huawei) |
03-Sep-2024 10:56:44 ET |
Download |
03-Sep-2024 ET |
2024 |
1507 |
0 |
TGbn |
UHR Trigger Frame Design |
Mahmoud Hasabelnaby (Huawei) |
08-Sep-2024 13:14:23 ET |
Download |
03-Sep-2024 ET |
2024 |
1505 |
0 |
TGbn |
TXOP bandwidth expansion - Follow up |
Sanghyun Kim (WILUS) |
09-Sep-2024 14:13:03 ET |
Download |
03-Sep-2024 ET |
2024 |
1504 |
0 |
TGbn |
Considerations on Aperiodic In-device Coexistence |
Hyeonjun Sung (WILUS Inc.) |
11-Sep-2024 06:00:47 ET |
Download |
03-Sep-2024 ET |
2024 |
1502 |
0 |
TGbn |
Discussion on AP Power Save |
SunHee Baek(LG Electronics) |
22-Oct-2024 03:45:12 ET |
Download |
03-Sep-2024 ET |
2024 |
1499 |
0 |
TGbn |
Low Latency BSS Indication |
Akira Kishida (NTT) |
09-Sep-2024 16:50:35 ET |
Download |
02-Sep-2024 ET |
2024 |
243 |
1 |
TGbn |
Protocol Design for UL Beamforming |
Eunsung Jeon (Samsung) |
02-Sep-2024 20:42:47 ET |
Download |
02-Sep-2024 ET |
2024 |
1124 |
2 |
TGbn |
Headroom Reason Reporting |
Brian Hart (Cisco Systems) |
02-Sep-2024 14:25:36 ET |
Download |
02-Sep-2024 ET |
2024 |
1494 |
0 |
TGbn |
a-transmission-scheme-for-UHR |
Xiangxin Gu (Spreadtrum) |
03-Sep-2024 22:12:20 ET |
Download |
02-Sep-2024 ET |
2024 |
1472 |
1 |
TGbn |
Consideration on DRU for 11bn |
Lei Zhou (New H3C) |
02-Sep-2024 01:49:26 ET |
Download |
01-Sep-2024 ET |
2024 |
1493 |
0 |
TGbn |
Tone Plan Shift Value Design |
Bo Gong (Huawei) |
05-Sep-2024 21:27:29 ET |
Download |
01-Sep-2024 ET |
2024 |
1492 |
0 |
TGbn |
Comparison between Dynamic and Fixed Start CSD Assignment |
Bo Gong (Huawei) |
05-Sep-2024 09:17:20 ET |
Download |
01-Sep-2024 ET |
2024 |
1491 |
0 |
TGbn |
RU adaptation signaling in UL TB transmission |
Yapu Li (OPPO) |
01-Sep-2024 21:46:27 ET |
Download |
01-Sep-2024 ET |
2024 |
1490 |
0 |
TGbn |
More Consideration of ICR/CRF for in-device-coexistence |
Hongwon Lee (LG Electronincs) |
24-Oct-2024 03:45:22 ET |
Download |
01-Sep-2024 ET |
2024 |
1489 |
0 |
TGbn |
Signaling for DRU Transmission |
Shengquan Hu (Mediatek) |
08-Sep-2024 19:21:13 ET |
Download |
01-Sep-2024 ET |
2024 |
1488 |
0 |
TGbn |
ELR PPDU Transmission Design |
Shengquan Hu (Mediatek) |
08-Sep-2024 19:19:18 ET |
Download |
01-Sep-2024 ET |
2024 |
1487 |
0 |
TGbn |
LDPC and Framing Settings for Ultra High Reliability |
Rainer Strobel (Maxlinear) |
06-Sep-2024 01:14:50 ET |
Download |
01-Sep-2024 ET |
2024 |
1486 |
0 |
TGbn |
Performance evaluation of ELR transmission |
Dongguk Lim (LG Electronics) |
08-Sep-2024 19:30:42 ET |
Download |
01-Sep-2024 ET |
2024 |
1485 |
0 |
TGbn |
Considerations for ELR PPDU format |
Dongguk Lim (LG Electronics) |
08-Sep-2024 19:30:06 ET |
Download |
01-Sep-2024 ET |
2024 |
1484 |
0 |
TGbn |
Coordinated BF: Figures of Merit |
Shimi Shilo (Huawei) |
08-Sep-2024 20:17:08 ET |
Download |
30-Aug-2024 ET |
2024 |
1483 |
0 |
TGbn |
Index Modulation applied to the DRU |
Junghoon Suh (Huawei) |
05-Sep-2024 12:33:15 ET |
Download |
30-Aug-2024 ET |
2024 |
1482 |
0 |
TGbn |
CSMA with enhanced Collision Avoidance for Low-Latency traffic |
Sigurd Schelstraete (MaxLinear) |
06-Sep-2024 17:22:48 ET |
Download |
30-Aug-2024 ET |
2024 |
1481 |
0 |
TGbn |
CSMA with enhanced Collision Avoidance - follow-up |
Sigurd Schelstraete (MaxLinear) |
06-Sep-2024 17:22:11 ET |
Download |
30-Aug-2024 ET |
2024 |
1480 |
0 |
TGbn |
UHR-LTF for DRU |
Sigurd Schelstraete (MaxLinear) |
06-Sep-2024 17:04:48 ET |
Download |
30-Aug-2024 ET |
2024 |
1344 |
5 |
TGbn |
802.11bn MAC Ad Hoc Minutes July-Sept 2024 |
Srinivas Kandala (Samsung Electronics) |
30-Aug-2024 15:00:03 ET |
Download |
30-Aug-2024 ET |
2024 |
1478 |
0 |
TGbn |
ELR PPDU design |
Lin Yang (Qualcomm Inc.) |
08-Sep-2024 16:09:18 ET |
Download |
30-Aug-2024 ET |
2024 |
1477 |
0 |
TGbn |
operating channel validation(OCV) in NPCA |
Jay Yang(ZTE) |
06-Sep-2024 02:14:57 ET |
Download |
30-Aug-2024 ET |
2024 |
1476 |
0 |
TGbn |
seamless roaming follow up |
Jay Yang(ZTE) |
06-Sep-2024 02:13:31 ET |
Download |
30-Aug-2024 ET |
2024 |
1388 |
1 |
TGbn |
Thoughts on interface between AP MLDs for reamless roaming |
Haorui Yang (China Mobile) |
30-Aug-2024 05:45:21 ET |
Download |
30-Aug-2024 ET |
2024 |
1474 |
0 |
TGbn |
some thoughts on DSO |
Li Quan(ZTE) |
08-Sep-2024 03:07:52 ET |
Download |
30-Aug-2024 ET |
2024 |
1473 |
0 |
TGbn |
MAP co-EDCA to improve the performance of edging STA Follow up |
Li Quan(ZTE) |
08-Sep-2024 03:08:21 ET |
Download |
30-Aug-2024 ET |
2024 |
1472 |
0 |
TGbn |
Consideration on DRU for 11bn |
Lei Zhou (New H3C) |
30-Aug-2024 04:05:06 ET |
Download |
30-Aug-2024 ET |
2024 |
1471 |
0 |
TGbn |
Signaling for DRU in Trigger Frame |
Eunsung Park (LG Electronics) |
08-Sep-2024 17:20:07 ET |
Download |
30-Aug-2024 ET |
2024 |
1470 |
0 |
TGbn |
Proposal for DRU Tone Pan |
Eunsung Park (LG Electronics) |
08-Sep-2024 17:19:34 ET |
Download |
30-Aug-2024 ET |
2024 |
1115 |
1 |
TGbn |
Channel switching rules for NPCA |
Vishnu Ratnam (Samsung Electronics) |
30-Aug-2024 02:20:48 ET |
Download |
30-Aug-2024 ET |
2024 |
1469 |
0 |
TGbn |
PHY primitive extension for NPCA |
Yan Li(ZTE) |
06-Sep-2024 09:01:49 ET |
Download |
30-Aug-2024 ET |
2024 |
1468 |
0 |
TGbn |
Credibility Criterion for TXOP Preemption |
Yuxin Lu (TCL Industries) |
04-Sep-2024 00:01:03 ET |
Download |
30-Aug-2024 ET |
2024 |
1467 |
0 |
TGbn |
Framework of Multi-AP |
Suhwook Kim (Samsung Electronics) |
06-Sep-2024 20:06:22 ET |
Download |
29-Aug-2024 ET |
2024 |
1465 |
0 |
TGbn |
Updated Proposal for 80MHz DRU Tone Plan |
Chenchen LIU(Huawei) |
03-Sep-2024 22:31:09 ET |
Download |
29-Aug-2024 ET |
2024 |
1464 |
0 |
TGbn |
Discussion on ICF |
Insun Jang (LG Electronics) |
12-Nov-2024 17:10:49 ET |
Download |
29-Aug-2024 ET |
2024 |
1224 |
1 |
TGbn |
Joint Medium Access and TXOP Sharing |
Yongsen Ma (Samsung) |
29-Aug-2024 11:31:59 ET |
Download |
29-Aug-2024 ET |
2024 |
1463 |
0 |
TGbn |
Robust Beamforming Nulling for CBF |
Ken Tanaka (Sony) |
04-Sep-2024 08:44:01 ET |
Download |
29-Aug-2024 ET |
2024 |
1461 |
0 |
TGbn |
UHR preamble signaling |
Sigurd Schelstraete (MaxLinear) |
06-Sep-2024 12:11:52 ET |
Download |
29-Aug-2024 ET |
2024 |
1460 |
0 |
TGbn |
Extension of TXOP-level IDC to MLO |
Jaheon Gu (Samsung Electronics) |
06-Sep-2024 08:16:46 ET |
Download |
29-Aug-2024 ET |
2024 |
1125 |
1 |
TGbn |
Considerations on switching for NPCA |
Dongju Cha (LG Electronics) |
29-Aug-2024 03:29:29 ET |
Download |
29-Aug-2024 ET |
2024 |
1457 |
0 |
TGbn |
R-TWT Sharing |
Gaius Wee (Panasonic) |
09-Sep-2024 23:56:19 ET |
Download |
29-Aug-2024 ET |
2024 |
1456 |
0 |
TGbn |
Discussion on DCM of DRU |
Mengshi Hu (Huawei) |
29-Aug-2024 02:30:51 ET |
Download |
29-Aug-2024 ET |
2024 |
1455 |
0 |
TGbn |
Discussion on TB ELR PPDU |
Mengshi Hu (Huawei) |
29-Aug-2024 02:24:19 ET |
Download |
29-Aug-2024 ET |
2024 |
1454 |
0 |
TGbn |
Discussion on configuration/indication of ELR PPDU |
Ke Zhong (Ruijie Networks Co., Ltd.) |
03-Sep-2024 22:50:05 ET |
Download |
29-Aug-2024 ET |
2024 |
679 |
2 |
TGbn |
Thoughts on Functionality and Security Architecture for UHR Seamless Roaming |
Thomas Derham (Broadcom) |
29-Aug-2024 00:42:46 ET |
Download |
28-Aug-2024 ET |
2024 |
1453 |
0 |
TGbn |
Concurrent Messaging |
Yue Xu (Huawei) |
06-Sep-2024 06:07:50 ET |
Download |
28-Aug-2024 ET |
2024 |
1452 |
0 |
TGbn |
Coordinated Measurement: Follow-up |
Kosuke Aio (Sony Corporation) |
08-Sep-2024 19:20:06 ET |
Download |
28-Aug-2024 ET |
2024 |
1340 |
13 |
TGbn |
July to Sept TGbn Teleconference Agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
28-Aug-2024 11:37:37 ET |
Download |
28-Aug-2024 ET |
2023 |
1871 |
3 |
TGbn |
M-AP Coordinated Transmission framework |
Arik Klein (Huawei) |
28-Aug-2024 11:12:08 ET |
Download |
28-Aug-2024 ET |
2024 |
1451 |
0 |
TGbn |
UEQM Transmission over Spatial Streams |
Ying Wang (InterDigital) |
08-Sep-2024 15:25:24 ET |
Download |
27-Aug-2024 ET |
2024 |
1449 |
0 |
TGbn |
A Flexible Extension Structure |
Yongsen Ma (Samsung) |
06-Sep-2024 12:23:17 ET |
Download |
27-Aug-2024 ET |
2024 |
1447 |
0 |
TGbn |
In-Device Coexistence Indication |
Yongsen Ma (Samsung) |
06-Sep-2024 12:22:08 ET |
Download |
27-Aug-2024 ET |
2024 |
1340 |
12 |
TGbn |
July to Sept TGbn Teleconference Agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
27-Aug-2024 12:02:06 ET |
Download |
27-Aug-2024 ET |
2024 |
1445 |
0 |
TGbn |
indication-for-coex-event |
Xiangxin Gu (Spreadtrum) |
02-Sep-2024 06:10:34 ET |
Download |
27-Aug-2024 ET |
2024 |
1444 |
0 |
TGbn |
roaming-with-context-transfer |
Xiangxin Gu (Spreadtrum) |
02-Sep-2024 06:11:07 ET |
Download |
26-Aug-2024 ET |
2024 |
1443 |
0 |
TGbn |
DPWiFi revA |
Carlos Rios (Terabit Wireless Internet LLC) |
05-Sep-2024 02:59:38 ET |
Download |
26-Aug-2024 ET |
2024 |
1340 |
11 |
TGbn |
July to Sept TGbn Teleconference Agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
26-Aug-2024 12:03:32 ET |
Download |
26-Aug-2024 ET |
2024 |
1392 |
1 |
TGbn |
TGbn July August 2024 Teleconference Minutes |
Yusuke Asai (NTT) |
26-Aug-2024 04:28:30 ET |
Download |
26-Aug-2024 ET |
2024 |
1439 |
0 |
TGbn |
Dynamic Power Saving in MLO |
Suhwook Kim (Samsung Electronics) |
06-Sep-2024 20:06:49 ET |
Download |
25-Aug-2024 ET |
2024 |
1259 |
1 |
TGbn |
SP-based non-primary channel access follow-up |
Yue Zhao (Huawei) |
25-Aug-2024 23:38:58 ET |
Download |
25-Aug-2024 ET |
2024 |
1438 |
0 |
TGbn |
Enabling QoS Monitoring at AP Side |
Guogang Huang (Huawei) |
05-Sep-2024 22:58:36 ET |
Download |
23-Aug-2024 ET |
2024 |
1344 |
4 |
TGbn |
802.11bn MAC Ad Hoc Minutes July-Sept 2024 |
Xiaofei WANG (InterDigital) |
23-Aug-2024 13:48:42 ET |
Download |
22-Aug-2024 ET |
2024 |
1435 |
0 |
TGbn |
UHR Multi-Channel Access |
Yanchun Li (Huawei) |
31-Aug-2024 02:37:13 ET |
Download |
22-Aug-2024 ET |
2024 |
1124 |
1 |
TGbn |
Headroom Reason Reporting |
Brian Hart (Cisco Systems) |
22-Aug-2024 17:04:44 ET |
Download |
22-Aug-2024 ET |
2024 |
1433 |
0 |
TGbn |
Enhancing BF Feedback mechanism in 11bn |
Aiguo Yan (Samsung) |
03-Sep-2024 13:17:17 ET |
Download |
22-Aug-2024 ET |
2024 |
1432 |
0 |
TGbn |
Unified CoBF and MUMIMO Schemes with Zero MUI |
Aiguo Yan (Samsung) |
05-Sep-2024 14:55:58 ET |
Download |
22-Aug-2024 ET |
2024 |
1431 |
0 |
TGbn |
A Unified Signaling Scheme for EQM and UEQM |
Aiguo Yan (Samsung) |
04-Sep-2024 19:28:15 ET |
Download |
22-Aug-2024 ET |
2024 |
803 |
1 |
TGbn |
The switching time in NPCA |
Yunbo Li (Huawei) |
22-Aug-2024 10:17:58 ET |
Download |
22-Aug-2024 ET |
2024 |
1206 |
1 |
TGbn |
Considerations on Coordinated R-TWT |
Jason Yuchen Guo (Huawei) |
22-Aug-2024 10:07:10 ET |
Download |
22-Aug-2024 ET |
2024 |
850 |
1 |
TGbn |
TXOP Bandwidth Expansion Related to Secondary Channel Access |
Jerome Gu (Clourney Semiconductor) |
22-Aug-2024 06:04:41 ET |
Download |
22-Aug-2024 ET |
2024 |
981 |
1 |
TGbn |
Considerations on NPCA for reliability |
Si-Chan Noh (Newracom) |
22-Aug-2024 05:17:02 ET |
Download |
21-Aug-2024 ET |
2024 |
686 |
1 |
TGbn |
STA initiated TXOP Sharing via Unicast CF-End |
Pei Zhou (TCL) |
21-Aug-2024 21:52:31 ET |
Download |
21-Aug-2024 ET |
2024 |
1427 |
0 |
TGbn |
Signaling for MCS and UEQM in 11bn |
Dongguk Lim (LG Electronics) |
08-Sep-2024 21:36:24 ET |
Download |
21-Aug-2024 ET |
2024 |
1425 |
0 |
TGbn |
Considerations for Context Transfer in 11bn |
Peshal Nayak (Samsung) |
09-Nov-2024 11:49:44 ET |
Download |
20-Aug-2024 ET |
2024 |
1421 |
0 |
TGbn |
Follow-up on Peer-to-Peer TWT for Handling Co-Ex |
Rubayet Shafin (Samsung Electronics) |
27-Oct-2024 14:29:48 ET |
Download |
20-Aug-2024 ET |
2024 |
1340 |
10 |
TGbn |
July to Sept TGbn Teleconference Agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
20-Aug-2024 11:57:34 ET |
Download |
19-Aug-2024 ET |
2024 |
1344 |
3 |
TGbn |
802.11bn MAC Ad Hoc Minutes July-Sept 2024 |
Xiaofei WANG (InterDigital) |
19-Aug-2024 21:15:56 ET |
Download |
19-Aug-2024 ET |
2024 |
1217 |
2 |
TGbn |
Multi-AP Coordination Setup Scheme |
Kaiying Lu (MediaTek USA) |
19-Aug-2024 19:17:07 ET |
Download |
19-Aug-2024 ET |
2024 |
1217 |
1 |
TGbn |
Multi-AP Coordination Setup Scheme |
Kaiying Lu (MediaTek USA) |
19-Aug-2024 18:56:31 ET |
Download |
19-Aug-2024 ET |
2024 |
1340 |
9 |
TGbn |
July to Sept TGbn Teleconference Agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
19-Aug-2024 11:54:28 ET |
Download |
19-Aug-2024 ET |
2024 |
1145 |
1 |
TGbn |
Multi-AP Coordination for Low Latency Traffic Transmission |
Jerome Gu (Clourney Semiconductor) |
19-Aug-2024 06:14:16 ET |
Download |
16-Aug-2024 ET |
2024 |
1154 |
1 |
TGbn |
Discussion on coordination of TWT |
Yingqiao Quan (Spreadtrum) |
16-Aug-2024 06:38:22 ET |
Download |
15-Aug-2024 ET |
2024 |
1340 |
8 |
TGbn |
July to Sept TGbn Teleconference Agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
15-Aug-2024 16:56:03 ET |
Download |
15-Aug-2024 ET |
2024 |
1414 |
0 |
TGbn |
Channel Measurement Based on Control Frame Exchange |
Guogang Huang (Huawei) |
05-Sep-2024 23:06:56 ET |
Download |
14-Aug-2024 ET |
2024 |
737 |
1 |
TGbn |
Cross-link Wake-up to Go Deeper in Power Save |
Yuxin Lu (TCL Industries) |
14-Aug-2024 03:08:21 ET |
Download |
13-Aug-2024 ET |
2024 |
1411 |
0 |
TGbn |
Signaling for UHR PPDU |
Ross Jian Yu (Huawei) |
13-Aug-2024 22:45:51 ET |
Download |
13-Aug-2024 ET |
2024 |
1410 |
0 |
TGbn |
Legacy preamble for ELR PPDU |
Ross Jian Yu (Huawei) |
13-Aug-2024 22:27:58 ET |
Download |
13-Aug-2024 ET |
2024 |
1409 |
0 |
TGbn |
Unequal Pattern Discussion Follow up |
Ross Jian Yu (Huawei) |
13-Aug-2024 21:59:55 ET |
Download |
13-Aug-2024 ET |
2024 |
1405 |
0 |
TGbn |
Discussion on aspects in DRU operation - follow up |
Arik Klein (Huawei) |
22-Aug-2024 08:59:10 ET |
Download |
13-Aug-2024 ET |
2024 |
1404 |
0 |
TGbn |
Discussion on Channel Switching for NPCA |
Si-Chan Noh (Newracom) |
26-Aug-2024 20:57:25 ET |
Download |
13-Aug-2024 ET |
2024 |
1403 |
0 |
TGbn |
Some thoughts on NPCA Operation |
Si-Chan Noh (Newracom) |
26-Aug-2024 20:56:38 ET |
Download |
12-Aug-2024 ET |
2024 |
1340 |
7 |
TGbn |
July to Sept TGbn Teleconference Agenda |
Alfred Asterjadhi (Qualcomm Technologies Inc.) |
12-Aug-2024 13:55:18 ET |
Download |
09-Aug-2024 ET |
2024 |
1394 |
0 |
TGbn |
NPCA Operation Issues |
Seongho Byeon (Samsung Electronics) |
06-Sep-2024 02:06:10 ET |
Download |