Created (ET) |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) ▲ |
Uploaded (ET) |
Actions |
16-Jan-2024 ET |
2024 |
139 |
0 |
TGbn |
HE-UHR Aggregated Sounding Design |
Eunsung Jeon (Samsung) |
05-Mar-2024 00:33:36 ET |
Download |
16-Jan-2024 ET |
2024 |
138 |
0 |
TGbn |
EHT-UHR Aggregated Sounding Design |
Eunsung Jeon (Samsung) |
05-Mar-2024 00:31:49 ET |
Download |
11-Jan-2024 ET |
2024 |
57 |
1 |
AIML TIG/SC |
ML-aided Channel Classification and Its Application to WLAN |
Eunsung Jeon (Samsung) |
11-Jan-2024 21:29:12 ET |
Download |
10-Jan-2024 ET |
2024 |
57 |
0 |
AIML TIG/SC |
ML-aided Channel Classification and Its Application to WLAN |
Eunsung Jeon (Samsung) |
11-Jan-2024 01:34:13 ET |
Download |
05-Nov-2023 ET |
2023 |
1906 |
0 |
TGbn |
Channel Information Feedback for Smooth Beamforming - Follow Up |
Eunsung Jeon (Samsung) |
06-Nov-2023 03:40:45 ET |
Download |
07-Sep-2023 ET |
2023 |
1514 |
0 |
UHR SG |
Channel Information Feedback for Smooth Beamforming - Follow Up |
Eunsung Jeon (Samsung) |
07-Sep-2023 23:50:47 ET |
Download |
06-Jul-2023 ET |
2023 |
991 |
2 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the CSI Compression Use Case |
Eunsung Jeon (Samsung) |
06-Jul-2023 21:53:13 ET |
Download |
04-Jul-2023 ET |
2023 |
991 |
1 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the CSI Compression Use Case |
Eunsung Jeon (Samsung) |
04-Jul-2023 20:19:35 ET |
Download |
07-Jun-2023 ET |
2023 |
991 |
0 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the CSI Compression Use Case |
Eunsung Jeon (Samsung) |
07-Jun-2023 01:26:14 ET |
Download |
09-May-2023 ET |
2023 |
606 |
1 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the Dual CSI Feedback Use Case |
Eunsung Jeon (Samsung) |
09-May-2023 20:58:28 ET |
Download |
08-May-2023 ET |
2023 |
783 |
0 |
AIML TIG/SC |
Adaptive Sounding Using ML |
Eunsung Jeon (Samsung) |
09-May-2023 20:55:42 ET |
Download |
05-Apr-2023 ET |
2023 |
606 |
0 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the Dual CSI Feedback Use Case |
Eunsung Jeon (Samsung) |
19-Apr-2023 21:08:38 ET |
Download |
15-Mar-2023 ET |
2023 |
217 |
2 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the Subcarrier Grouping Use Case |
Eunsung Jeon (Samsung) |
15-Mar-2023 21:55:02 ET |
Download |
13-Mar-2023 ET |
2023 |
217 |
1 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the Subcarrier Grouping Use Case |
Eunsung Jeon (Samsung) |
13-Mar-2023 11:31:20 ET |
Download |
05-Mar-2023 ET |
2023 |
280 |
0 |
AIML TIG/SC |
ML aided Dual CSI Feedback for Next Generation WLANs |
Eunsung Jeon (Samsung) |
10-Mar-2023 01:35:40 ET |
Download |
09-Feb-2023 ET |
2023 |
217 |
0 |
AIML TIG/SC |
Proposed IEEE 802.11 AIML TIG Technical Report Text for the Subcarrier Grouping Use Case |
Eunsung Jeon (Samsung) |
10-Feb-2023 00:24:38 ET |
Download |
12-Jan-2023 ET |
2023 |
32 |
3 |
AIML TIG/SC |
ML-based Adaptive Subcarrier Grouping for Beamforming Feedback |
Eunsung Jeon (Samsung) |
12-Jan-2023 19:59:09 ET |
Download |
12-Jan-2023 ET |
2023 |
32 |
2 |
AIML TIG/SC |
ML-based Adaptive Subcarrier Grouping for Beamforming Feedback |
Eunsung Jeon (Samsung) |
12-Jan-2023 19:39:17 ET |
Download |
09-Jan-2023 ET |
2023 |
32 |
1 |
AIML TIG/SC |
ML-based Adaptive Subcarrier Grouping for Beamforming Feedback |
Eunsung Jeon (Samsung) |
09-Jan-2023 23:49:00 ET |
Download |
31-Oct-2022 ET |
2022 |
1842 |
0 |
UHR SG |
Channel Information Feedback for Smooth Beamforming |
Eunsung Jeon (Samsung) |
03-Nov-2022 00:17:17 ET |
Download |
26-Aug-2022 ET |
2022 |
1392 |
0 |
UHR SG |
Beamforming Improvement for UHR |
Eunsung Jeon (Samsung) |
07-Sep-2022 12:29:52 ET |
Download |
29-Oct-2020 ET |
2020 |
950 |
5 |
TGbe |
Partial Bandwidth Feedback for Multi-RU |
Eunsung Jeon (Samsung) |
29-Oct-2020 12:39:48 ET |
Download |
15-Oct-2020 ET |
2020 |
1474 |
2 |
TGbe |
NDP Design for EHT |
Eunsung Jeon (Samsung) |
15-Oct-2020 01:10:39 ET |
Download |
24-Sep-2020 ET |
2020 |
1474 |
1 |
TGbe |
NDP Design for EHT |
Eunsung Jeon (Samsung) |
24-Sep-2020 00:52:21 ET |
Download |
21-Sep-2020 ET |
2020 |
950 |
4 |
TGbe |
Partial Bandwidth Feedback for Multi-RU |
Eunsung Jeon (Samsung) |
21-Sep-2020 10:05:11 ET |
Download |
18-Sep-2020 ET |
2020 |
1223 |
2 |
TGbe |
Subcarrier Grouping for EHT |
Eunsung Jeon (Samsung) |
18-Sep-2020 14:52:06 ET |
Download |
15-Sep-2020 ET |
2020 |
1474 |
0 |
TGbe |
NDP Design for EHT |
Eunsung Jeon (Samsung) |
15-Sep-2020 00:23:38 ET |
Download |
01-Sep-2020 ET |
2020 |
950 |
3 |
TGbe |
Partial Bandwidth Feedback for Multi-RU |
Eunsung Jeon (Samsung) |
01-Sep-2020 20:15:50 ET |
Download |
25-Aug-2020 ET |
2020 |
950 |
2 |
TGbe |
Partial Bandwidth Feedback for Multi-RU |
Eunsung Jeon (Samsung) |
25-Aug-2020 11:04:10 ET |
Download |
20-Aug-2020 ET |
2020 |
1223 |
1 |
TGbe |
Subcarrier Grouping for EHT |
Eunsung Jeon (Samsung) |
20-Aug-2020 21:52:37 ET |
Download |
13-Aug-2020 ET |
2020 |
1223 |
0 |
TGbe |
Subcarrier Grouping for EHT |
Eunsung Jeon (Samsung) |
13-Aug-2020 13:13:04 ET |
Download |
10-Aug-2020 ET |
2020 |
950 |
1 |
TGbe |
Partial Bandwidth Feedback for Multi-RU |
Eunsung Jeon (Samsung) |
10-Aug-2020 13:35:03 ET |
Download |
24-Jun-2020 ET |
2020 |
950 |
0 |
TGbe |
Partial Bandwidth Feedback for Multi-RU |
Eunsung Jeon (Samsung) |
30-Jun-2020 20:01:08 ET |
Download |
08-Jan-2018 ET |
2018 |
71 |
0 |
TGba |
Performance Investigation on Partial OOK |
Eunsung Park (LGE Electronics) |
15-Jan-2018 03:04:05 ET |
Download |
06-Apr-2020 ET |
2020 |
585 |
0 |
TGbe |
Consideration on EHT-STF |
Eunsung Park (LG Electronics |
16-Apr-2020 23:04:07 ET |
Download |
24-Apr-2025 ET |
2025 |
570 |
4 |
TGbn |
CC50 CR for 38.3.4 Transmission of DRU |
Eunsung Park (LG Electronics) |
24-Apr-2025 19:40:18 ET |
Download |
21-Apr-2025 ET |
2025 |
570 |
3 |
TGbn |
CC50 CR for 38.3.4 Transmission of DRU |
Eunsung Park (LG Electronics) |
21-Apr-2025 19:51:42 ET |
Download |
17-Apr-2025 ET |
2025 |
570 |
2 |
TGbn |
CC50 CR for 38.3.4 Transmission of DRU |
Eunsung Park (LG Electronics) |
17-Apr-2025 18:34:12 ET |
Download |
10-Apr-2025 ET |
2025 |
570 |
1 |
TGbn |
CC50 CR for 38.3.4 Transmission of DRU |
Eunsung Park (LG Electronics) |
10-Apr-2025 12:07:06 ET |
Download |
07-Apr-2025 ET |
2025 |
525 |
1 |
TGbn |
CC50 CR for 38.3.15.10.1 and 38.3.15.10.5 |
Eunsung Park (LG Electronics) |
07-Apr-2025 20:16:19 ET |
Download |
07-Apr-2025 ET |
2025 |
612 |
0 |
TGbn |
CC50 CR for 60 MHz DRU Tone Plan |
Eunsung Park (LG Electronics) |
10-Apr-2025 12:10:54 ET |
Download |
01-Apr-2025 ET |
2025 |
570 |
0 |
TGbn |
CC50 CR for 38.3.4 Transmission of DRU |
Eunsung Park (LG Electronics) |
08-Apr-2025 01:22:36 ET |
Download |
01-Apr-2025 ET |
2025 |
365 |
1 |
TGbq |
PPDU Format for IMMW |
Eunsung Park (LG Electronics) |
01-Apr-2025 00:13:54 ET |
Download |
27-Mar-2025 ET |
2025 |
520 |
1 |
TGbn |
CC50 CR for 38.3.15.10.4 CSD index assignment for DRU UHR-STF transmission |
Eunsung Park (LG Electronics) |
27-Mar-2025 19:55:15 ET |
Download |
27-Mar-2025 ET |
2025 |
518 |
1 |
TGbn |
CC50 CR for 38.3.15.2.2 Cyclic shift for UHR modulated fields |
Eunsung Park (LG Electronics) |
27-Mar-2025 19:42:36 ET |
Download |
26-Mar-2025 ET |
2025 |
547 |
0 |
TGbn |
CC50 CR for 38.3.15.10.2 UHR-STF for DRUs |
Eunsung Park (LG Electronics) |
03-Apr-2025 10:43:20 ET |
Download |
25-Mar-2025 ET |
2025 |
525 |
0 |
TGbn |
CC50 CR for 38.3.15.10.1 and 38.3.15.10.5 |
Eunsung Park (LG Electronics) |
03-Apr-2025 10:42:44 ET |
Download |
24-Mar-2025 ET |
2025 |
524 |
0 |
TGbn |
CC50 CR for 38.3.15.10.3 CSD for DRU transmission |
Eunsung Park (LG Electronics) |
01-Apr-2025 21:12:11 ET |
Download |
24-Mar-2025 ET |
2025 |
522 |
0 |
TGbn |
CC50 CR for 38.3.3 RU and MRU restrictions for 20 MHz operation |
Eunsung Park (LG Electronics) |
30-Mar-2025 19:05:53 ET |
Download |
24-Mar-2025 ET |
2025 |
520 |
0 |
TGbn |
CC50 CR for 38.3.15.10.4 CSD index assignment for DRU UHR-STF transmission |
Eunsung Park (LG Electronics) |
25-Mar-2025 23:37:03 ET |
Download |
24-Mar-2025 ET |
2025 |
518 |
0 |
TGbn |
CC50 CR for 38.3.15.2.2 Cyclic shift for UHR modulated fields |
Eunsung Park (LG Electronics) |
25-Mar-2025 23:36:44 ET |
Download |
06-Mar-2025 ET |
2025 |
365 |
0 |
TGbq |
PPDU Format for IMMW |
Eunsung Park (LG Electronics) |
12-Mar-2025 07:41:36 ET |
Download |
06-Mar-2025 ET |
2025 |
359 |
0 |
TGbn |
Open Issues for 60 MHz DBW |
Eunsung Park (LG Electronics) |
09-Mar-2025 19:37:45 ET |
Download |
08-Jan-2025 ET |
2025 |
64 |
0 |
TGbn |
60 MHz DRU Tone Plan |
Eunsung Park (LG Electronics) |
12-Jan-2025 20:34:28 ET |
Download |
15-Dec-2024 ET |
2024 |
2025 |
1 |
TGbn |
PDT PHY RU and MRU restrictions for 20 MHz operation |
Eunsung Park (LG Electronics) |
15-Dec-2024 02:33:59 ET |
Download |
04-Dec-2024 ET |
2024 |
1753 |
1 |
TGbn |
Signaling for DRU in Trigger Frame Follow-up |
Eunsung Park (LG Electronics) |
04-Dec-2024 16:51:14 ET |
Download |
02-Dec-2024 ET |
2024 |
2025 |
0 |
TGbn |
PDT PHY RU and MRU restrictions for 20 MHz operation |
Eunsung Park (LG Electronics) |
05-Dec-2024 20:58:26 ET |
Download |
02-Dec-2024 ET |
2024 |
2024 |
0 |
TGbn |
PDT PHY UHR-STF |
Eunsung Park (LG Electronics) |
12-Jan-2025 01:42:05 ET |
Download |
13-Nov-2024 ET |
2024 |
1754 |
2 |
TGbn |
20 MHz UHR-LTF Sequence for DRU |
Eunsung Park (LG Electronics) |
13-Nov-2024 20:02:00 ET |
Download |
12-Nov-2024 ET |
2024 |
1471 |
3 |
TGbn |
Signaling for DRU in Trigger Frame |
Eunsung Park (LG Electronics) |
12-Nov-2024 17:52:56 ET |
Download |
11-Nov-2024 ET |
2024 |
1754 |
1 |
TGbn |
20 MHz UHR-LTF Sequence for DRU |
Eunsung Park (LG Electronics) |
11-Nov-2024 17:14:16 ET |
Download |
11-Nov-2024 ET |
2024 |
1471 |
2 |
TGbn |
Signaling for DRU in Trigger Frame |
Eunsung Park (LG Electronics) |
11-Nov-2024 11:58:03 ET |
Download |
10-Nov-2024 ET |
2024 |
1470 |
1 |
TGbn |
Proposal for DRU Tone Pan |
Eunsung Park (LG Electronics) |
10-Nov-2024 19:03:54 ET |
Download |
10-Nov-2024 ET |
2024 |
1471 |
1 |
TGbn |
Signaling for DRU in Trigger Frame |
Eunsung Park (LG Electronics) |
10-Nov-2024 19:03:09 ET |
Download |
03-Nov-2024 ET |
2024 |
1754 |
0 |
TGbn |
20 MHz UHR-LTF Sequence for DRU |
Eunsung Park (LG Electronics) |
10-Nov-2024 19:04:48 ET |
Download |
03-Nov-2024 ET |
2024 |
1753 |
0 |
TGbn |
Signaling for DRU in Trigger Frame Follow-up |
Eunsung Park (LG Electronics) |
10-Nov-2024 19:04:22 ET |
Download |
28-Oct-2024 ET |
2024 |
1097 |
1 |
TGbn |
Thoughts on UHR-LTF for DRU |
Eunsung Park (LG Electronics) |
28-Oct-2024 20:29:42 ET |
Download |
30-Aug-2024 ET |
2024 |
1471 |
0 |
TGbn |
Signaling for DRU in Trigger Frame |
Eunsung Park (LG Electronics) |
08-Sep-2024 17:20:07 ET |
Download |
30-Aug-2024 ET |
2024 |
1470 |
0 |
TGbn |
Proposal for DRU Tone Pan |
Eunsung Park (LG Electronics) |
08-Sep-2024 17:19:34 ET |
Download |
14-Jul-2024 ET |
2024 |
766 |
3 |
TGbn |
Distribution Bandwidth within 80 MHz for DRU |
Eunsung Park (LG Electronics) |
14-Jul-2024 11:47:27 ET |
Download |
01-Jul-2024 ET |
2024 |
1097 |
0 |
TGbn |
Thoughts on UHR-LTF for DRU |
Eunsung Park (LG Electronics) |
14-Jul-2024 11:46:55 ET |
Download |
01-Jul-2024 ET |
2024 |
1096 |
0 |
TGbn |
Mirror Symmetric 20 MHz DRU Tone Plan within 242 RRU Boundary |
Eunsung Park (LG Electronics) |
14-Jul-2024 11:46:27 ET |
Download |
14-May-2024 ET |
2024 |
766 |
2 |
TGbn |
Distribution Bandwidth within 80 MHz for DRU |
Eunsung Park (LG Electronics) |
14-May-2024 11:21:49 ET |
Download |
14-May-2024 ET |
2024 |
766 |
1 |
TGbn |
Distribution Bandwidth within 80 MHz for DRU |
Eunsung Park (LG Electronics) |
14-May-2024 10:00:15 ET |
Download |
01-May-2024 ET |
2024 |
767 |
0 |
TGbn |
20 MHz Tone Plan and Pilot Design for DRU Follow Up |
Eunsung Park (LG Electronics) |
12-May-2024 11:05:27 ET |
Download |
01-May-2024 ET |
2024 |
766 |
0 |
TGbn |
Distribution Bandwidth within 80 MHz for DRU |
Eunsung Park (LG Electronics) |
12-May-2024 11:04:29 ET |
Download |
13-Mar-2024 ET |
2024 |
402 |
1 |
TGbn |
20 MHz Tone Plan and Pilot Design for DRU |
Eunsung Park (LG Electronics) |
13-Mar-2024 14:01:07 ET |
Download |
03-Mar-2024 ET |
2024 |
402 |
0 |
TGbn |
20 MHz Tone Plan and Pilot Design for DRU |
Eunsung Park (LG Electronics) |
09-Mar-2024 22:22:00 ET |
Download |
03-Mar-2024 ET |
2024 |
401 |
0 |
TGbn |
Multiple DRU Follow Up |
Eunsung Park (LG Electronics) |
09-Mar-2024 22:21:31 ET |
Download |
03-Mar-2024 ET |
2024 |
400 |
0 |
TGbn |
Hybrid PPDU and Distribution Bandwidth for DRU |
Eunsung Park (LG Electronics) |
09-Mar-2024 22:20:37 ET |
Download |
16-Jan-2024 ET |
2023 |
1919 |
1 |
TGbn |
dRU Proposal |
Eunsung Park (LG Electronics) |
16-Jan-2024 17:25:26 ET |
Download |
11-Jan-2024 ET |
2024 |
66 |
0 |
Integrated mmWave SG |
Discussion on Target Objectives for IMMW |
Eunsung Park (LG Electronics) |
14-Jan-2024 23:31:51 ET |
Download |
03-Jan-2024 ET |
2024 |
14 |
0 |
TGbn |
Further Thoughts on dRU |
Eunsung Park (LG Electronics) |
11-Jan-2024 12:36:42 ET |
Download |
06-Nov-2023 ET |
2023 |
1919 |
0 |
TGbn |
dRU Proposal |
Eunsung Park (LG Electronics) |
10-Nov-2023 08:49:29 ET |
Download |
12-Sep-2023 ET |
2023 |
1437 |
1 |
TGbe |
LB275 CR for CIDs 19163 and 19543 |
Eunsung Park (LG Electronics) |
12-Sep-2023 14:58:24 ET |
Download |
31-Aug-2023 ET |
2023 |
1448 |
0 |
UHR SG |
Further Considerations on dRU |
Eunsung Park (LG Electronics) |
10-Sep-2023 11:00:05 ET |
Download |
31-Aug-2023 ET |
2023 |
1447 |
0 |
UHR SG |
CFO Impact and Pilot Design for dRU Follow up |
Eunsung Park (LG Electronics) |
10-Sep-2023 10:59:45 ET |
Download |
29-Aug-2023 ET |
2023 |
1437 |
0 |
TGbe |
LB275 CR for CIDs 19163 and 19543 |
Eunsung Park (LG Electronics) |
10-Sep-2023 10:57:30 ET |
Download |
30-Jun-2023 ET |
2023 |
1117 |
0 |
UHR SG |
dRU Signaling for UHR |
Eunsung Park (LG Electronics) |
10-Jul-2023 04:33:54 ET |
Download |
30-Jun-2023 ET |
2023 |
1115 |
0 |
UHR SG |
CFO Impact and Pilot Design for dRU |
Eunsung Park (LG Electronics) |
10-Jul-2023 04:33:13 ET |
Download |
19-Jun-2023 ET |
2023 |
1031 |
0 |
TGbe |
LB271 CR for CID 15220 |
Eunsung Park (LG Electronics) |
19-Jun-2023 23:42:08 ET |
Download |
08-May-2023 ET |
2023 |
781 |
0 |
TGbe |
LB271 CR for 36.3.2.5 20 MHz operating non-AP EHT STAs participating in wider bandwidth OFDMA |
Eunsung Park (LG Electronics) |
14-May-2023 16:41:38 ET |
Download |
07-Mar-2023 ET |
2023 |
320 |
0 |
TGbe |
LB271 CR for 36.3.12.9 EHT-STF |
Eunsung Park (LG Electronics) |
12-Mar-2023 14:39:07 ET |
Download |
05-Mar-2023 ET |
2023 |
281 |
0 |
UHR SG |
Considerations on RU / MRU Designs for UHR |
Eunsung Park (LG Electronics) |
10-Apr-2023 19:49:27 ET |
Download |
02-Nov-2022 ET |
2022 |
1872 |
0 |
UHR SG |
Considerations on PHY designs for mmWave band |
Eunsung Park (LG Electronics) |
13-Nov-2022 13:12:48 ET |
Download |
04-Sep-2022 ET |
2022 |
1466 |
0 |
UHR SG |
Potential PHY Features for UHR |
Eunsung Park (LG Electronics) |
12-Sep-2022 01:57:56 ET |
Download |
04-Sep-2022 ET |
2022 |
1465 |
0 |
TGbe |
LB266 CR for CID 12937 |
Eunsung Park (LG Electronics) |
04-Sep-2022 19:24:49 ET |
Download |
04-Sep-2022 ET |
2022 |
1464 |
0 |
TGbe |
LB266 CR for CID 11692 and 11693 |
Eunsung Park (LG Electronics) |
04-Sep-2022 19:24:30 ET |
Download |
29-Aug-2022 ET |
2022 |
1358 |
1 |
TGbe |
LB266 CR for CID 11343 and 12145 |
Eunsung Park (LG Electronics) |
29-Aug-2022 19:21:26 ET |
Download |
16-Aug-2022 ET |
2022 |
1358 |
0 |
TGbe |
LB266 CR for CID 11343 and 12145 |
Eunsung Park (LG Electronics) |
16-Aug-2022 21:56:08 ET |
Download |