Created (ET) |
Year |
DCN |
Rev |
Group ▲ |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
28-Feb-2023 ET |
2023 |
171 |
3 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Feb-2023 |
Bo Sun (Sanechips) |
28-Feb-2023 23:10:28 ET |
Download |
27-Feb-2023 ET |
2023 |
171 |
2 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Feb-2023 |
Bo Sun (Sanechips) |
27-Feb-2023 10:47:09 ET |
Download |
07-Feb-2023 ET |
2023 |
171 |
1 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Feb-2023 |
Bo Sun (Sanechips) |
07-Feb-2023 11:12:22 ET |
Download |
03-Feb-2023 ET |
2023 |
172 |
0 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Mar-Plenary-2023 |
Bo Sun (Sanechips) |
12-Mar-2023 21:24:22 ET |
Download |
03-Feb-2023 ET |
2023 |
171 |
0 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Feb-2023 |
Bo Sun (Sanechips) |
03-Feb-2023 21:41:05 ET |
Download |
19-Jan-2023 ET |
2022 |
2137 |
2 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Jan-Interim-2023 |
Bo Sun (Sanechips) |
19-Jan-2023 13:30:33 ET |
Download |
19-Jan-2023 ET |
2023 |
136 |
0 |
AMP TIG/SG |
amp-tig-closing-report-jan-interim-2023 |
Bo Sun (Sanechips) |
19-Jan-2023 13:33:04 ET |
Download |
16-Jan-2023 ET |
2022 |
2137 |
1 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Jan-Interim-2023 |
Bo Sun (Sanechips) |
16-Jan-2023 22:01:50 ET |
Download |
13-Dec-2022 ET |
2022 |
2134 |
1 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Dec-2022 |
Bo Sun (Sanechips) |
13-Dec-2022 10:29:04 ET |
Download |
12-Dec-2022 ET |
2022 |
2138 |
0 |
AMP TIG/SG |
New Use Case for Amp IoT Devices |
Bo Sun (Sanechips) |
12-Dec-2022 20:25:36 ET |
Download |
12-Dec-2022 ET |
2022 |
2137 |
0 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Jan-Interim-2023 |
Bo Sun (Sanechips) |
16-Jan-2023 06:35:31 ET |
Download |
11-Dec-2022 ET |
2022 |
2134 |
0 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Dec-2022 |
Bo Sun (Sanechips) |
11-Dec-2022 11:04:13 ET |
Download |
17-Nov-2022 ET |
2022 |
2036 |
1 |
AMP TIG/SG |
amp-tig-closing-report-nov-plenary-2022 |
Bo Sun (Sanechips) |
17-Nov-2022 08:18:42 ET |
Download |
17-Nov-2022 ET |
2022 |
2036 |
0 |
AMP TIG/SG |
amp-tig-closing-report-nov-plenary-2022 |
Bo Sun (Sanechips) |
17-Nov-2022 02:53:44 ET |
Download |
17-Nov-2022 ET |
2022 |
1707 |
3 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Nov-Plenary-2022 |
Bo Sun (Sanechips) |
17-Nov-2022 02:50:26 ET |
Download |
16-Nov-2022 ET |
2022 |
1707 |
2 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Nov-Plenary-2022 |
Bo Sun (Sanechips) |
16-Nov-2022 13:41:43 ET |
Download |
14-Nov-2022 ET |
2022 |
1707 |
1 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Nov-Plenary-2022 |
Bo Sun (Sanechips) |
14-Nov-2022 01:25:58 ET |
Download |
25-Oct-2022 ET |
2022 |
1801 |
1 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Oct-2022 |
Bo Sun (Sanechips) |
25-Oct-2022 09:54:43 ET |
Download |
24-Oct-2022 ET |
2022 |
1801 |
0 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Oct-2022 |
Bo Sun (Sanechips) |
24-Oct-2022 10:44:40 ET |
Download |
07-Oct-2022 ET |
2022 |
1707 |
0 |
AMP TIG/SG |
amp-tig-meeting-agenda-for-Nov-Plenary-2022 |
Bo Sun (Sanechips) |
13-Nov-2022 20:41:18 ET |
Download |
14-Sep-2022 ET |
2022 |
1615 |
0 |
AMP TIG/SG |
amp-tig-closing-report-sep-interim-2022 |
Bo Sun (ZTE) |
14-Sep-2022 23:05:17 ET |
Download |
13-Sep-2022 ET |
2022 |
1291 |
2 |
AMP TIG/SG |
TIG-AMP-session-agenda-for-Sep-Interim-2022 |
Bo Sun (ZTE Corporation) |
13-Sep-2022 03:37:39 ET |
Download |
13-Sep-2022 ET |
2022 |
1291 |
1 |
AMP TIG/SG |
TIG-AMP-session-agenda-for-Sep-Interim-2022 |
Bo Sun (ZTE Corporation) |
13-Sep-2022 01:22:12 ET |
Download |
16-Aug-2022 ET |
2022 |
1333 |
1 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Aug-2022 |
Bo Sun (ZTE Corporation) |
16-Aug-2022 23:20:19 ET |
Download |
16-Aug-2022 ET |
2022 |
1294 |
1 |
AMP TIG/SG |
Wireless Power Transmission and Energy Harvesting for IoT Applications |
Boyce Bo Yang (Huawei) |
16-Aug-2022 07:18:34 ET |
Download |
12-Aug-2022 ET |
2022 |
1333 |
0 |
AMP TIG/SG |
amp-tig-tc-agenda-for-Aug-2022 |
Bo Sun (ZTE Corporation) |
16-Aug-2022 02:56:06 ET |
Download |
08-Aug-2022 ET |
2022 |
1294 |
0 |
AMP TIG/SG |
Wireless Power Transmission and Energy Harvesting for IoT Applications |
Boyce Bo Yang (Huawei) |
15-Aug-2022 07:35:44 ET |
Download |
07-Aug-2022 ET |
2022 |
1291 |
0 |
AMP TIG/SG |
TIG-AMP-session-agenda-for-Sep-Interim-2022 |
Bo Sun (ZTE Corporation) |
07-Sep-2022 04:46:09 ET |
Download |
14-Jul-2022 ET |
2022 |
1139 |
1 |
AMP TIG/SG |
TIG-AMP-session-agenda-for-Jul-Plenary-2022 |
Bo Sun (ZTE Corporation) |
14-Jul-2022 09:23:38 ET |
Download |
14-Jul-2022 ET |
2022 |
1140 |
0 |
AMP TIG/SG |
802-11-amp-tig-closing-report-Jul-Plenary-2022 |
Bo Sun (ZTE Corporation) |
14-Jul-2022 10:16:19 ET |
Download |
14-Jul-2022 ET |
2022 |
1139 |
0 |
AMP TIG/SG |
TIG-AMP-session-agenda-for-Jul-Plenary-2022 |
Bo Sun (ZTE Corporation) |
14-Jul-2022 09:19:08 ET |
Download |
14-Nov-2004 ET |
2004 |
1418 |
0 |
APF AHC |
APF Telecon Minutes November03 |
Eric Tokubo (Symbol Technologies) |
14-Nov-2004 00:00:00 ET |
Download |
08-Sep-2004 ET |
2004 |
1013 |
0 |
APF AHC |
APF SG Teleconference Minutes Sept01 |
Eric Tokubo (Symbol Technologies) |
08-Sep-2004 00:00:00 ET |
Download |
30-Apr-2025 ET |
2025 |
738 |
0 |
ARC SC |
WMs, Protection Mechanisms, and Frame Exchange Sequences |
Harry Bims (Bims Laboratories, Inc.) |
02-May-2025 11:34:08 ET |
Download |
30-Apr-2025 ET |
2023 |
880 |
8 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
30-Apr-2025 01:04:54 ET |
Download |
13-Mar-2025 ET |
2025 |
488 |
0 |
ARC SC |
FES Concepts and Straw Polls |
Harry Bims (Bims Laboratories) |
13-Mar-2025 10:54:38 ET |
Download |
10-Mar-2025 ET |
2023 |
880 |
7 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
10-Mar-2025 09:08:44 ET |
Download |
10-Mar-2025 ET |
2023 |
880 |
6 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
10-Mar-2025 03:46:42 ET |
Download |
13-Jan-2025 ET |
2023 |
880 |
5 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
13-Jan-2025 23:44:51 ET |
Download |
11-Nov-2024 ET |
2023 |
880 |
4 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
11-Nov-2024 16:18:33 ET |
Download |
12-Sep-2024 ET |
2023 |
880 |
3 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
12-Sep-2024 14:27:33 ET |
Download |
09-Sep-2024 ET |
2023 |
880 |
2 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
09-Sep-2024 14:32:21 ET |
Download |
12-Sep-2023 ET |
2023 |
1599 |
0 |
ARC SC |
Discussion of normative text understanding of Frame Exchange Sequences |
Harry Bims (Bims Laboratories, Inc) |
13-Sep-2023 10:57:07 ET |
Download |
11-Jul-2023 ET |
2023 |
880 |
1 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
11-Jul-2023 19:51:01 ET |
Download |
17-May-2023 ET |
2023 |
880 |
0 |
ARC SC |
Revised Annex G containing Example Frame Exchange Sequences |
Harry Bims (Bims Laboratories) |
17-May-2023 00:42:35 ET |
Download |
13-Mar-2023 ET |
2023 |
419 |
0 |
ARC SC |
Proposal for Annex G Frame Exchange Sequence Examples |
Harry Bims (Bims Laboratories, Inc.) |
13-Mar-2023 09:49:56 ET |
Download |
17-Jan-2022 ET |
2022 |
101 |
0 |
ARC SC |
The Need for Frame Exchange Sequences |
Harry Bims (Bims Laboratories, Inc.) |
17-Jan-2022 11:27:44 ET |
Download |
29-Nov-2021 ET |
2021 |
1797 |
2 |
ARC SC |
Proposal for New Annex G Frame Exchange Sequence Descriptions |
Harry Bims (Bims Laboratories, Inc.) |
29-Nov-2021 15:35:49 ET |
Download |
29-Nov-2021 ET |
2021 |
1797 |
1 |
ARC SC |
Proposal for New Annex G Frame Exchange Sequence Descriptions |
Harry Bims (Bims Laboratories, Inc.) |
29-Nov-2021 14:19:08 ET |
Download |
06-Nov-2021 ET |
2021 |
1797 |
0 |
ARC SC |
Proposal for New Annex G Frame Exchange Sequence Descriptions |
Harry Bims (Bims Laboratories, Inc.) |
06-Nov-2021 19:00:31 ET |
Download |
03-Apr-2021 ET |
2021 |
414 |
2 |
ARC SC |
Draft examples of a proposed notation for frame exchange sequence sequences in Annex G of 802.11-2020 |
Harry Bims (Bims Laboratories, Inc.) |
03-Apr-2021 00:32:38 ET |
Download |
08-Mar-2021 ET |
2021 |
414 |
1 |
ARC SC |
Draft examples of a proposed notation for frame exchange sequence sequences in Annex G of 802.11-2020 |
Harry Bims (Bims Laboratories, Inc.) |
09-Mar-2021 12:25:40 ET |
Download |
08-Mar-2021 ET |
2021 |
414 |
0 |
ARC SC |
Draft examples of a proposed notation for frame exchange sequence sequences in Annex G of 802.11-2020 |
Harry Bims (Bims Laboratories, Inc.) |
08-Mar-2021 20:00:31 ET |
Download |
03-Mar-2025 ET |
2025 |
293 |
0 |
Auto TIG |
Automotive-TIG-Thoughts on PHY improvements |
Azin Neishaboori (General Motors) |
03-Mar-2025 15:25:35 ET |
Download |
09-Sep-2024 ET |
2024 |
1525 |
2 |
Auto TIG |
Sustained automotive connectivity use case study |
Azin Neishaboori (General Motors) |
09-Sep-2024 14:50:13 ET |
Download |
06-Sep-2024 ET |
2024 |
1525 |
1 |
Auto TIG |
Sustained automotive connectivity use case study |
Azin Neishaboori (General Motors) |
06-Sep-2024 11:42:53 ET |
Download |
04-Sep-2024 ET |
2024 |
1525 |
0 |
Auto TIG |
Sustained automotive connectivity use case study |
Azin Neishaboori (General Motors) |
05-Sep-2024 16:20:40 ET |
Download |
18-Jan-2023 ET |
2023 |
126 |
0 |
Coex SC |
EN 301 893 EDT Update |
David Boldy, Broadcom |
18-Jan-2023 09:11:20 ET |
Download |
09-Jun-2020 ET |
2020 |
878 |
2 |
Coex SC |
Minutes of 4 June 2020 teleconference |
David Boldy (Broadcom) |
09-Jun-2020 21:18:29 ET |
Download |
09-Jun-2020 ET |
2020 |
878 |
1 |
Coex SC |
Minutes of 4 June 2020 teleconference |
David Boldy (Broadcom) |
09-Jun-2020 02:13:38 ET |
Download |
09-Jun-2020 ET |
2020 |
878 |
0 |
Coex SC |
Minutes of 4 June 2020 teleconference |
David Boldy (Broadcom) |
09-Jun-2020 01:57:17 ET |
Download |
14-Jan-2020 ET |
2020 |
172 |
0 |
Coex SC |
EN 301 893 Spectrum Mask Puncturing Update |
David Boldy (Broadcom) |
15-Jan-2020 12:14:36 ET |
Download |
12-Nov-2019 ET |
2019 |
2060 |
0 |
Coex SC |
Updates from EN301893 GoToMeetings since BRAN103 |
David Boldy (Broadcom) |
12-Nov-2019 21:48:51 ET |
Download |
19-Sep-2019 ET |
2019 |
1672 |
1 |
Coex SC |
EN 301 893 Spectrum Mask Interpretations |
David Boldy (Broadcom) |
19-Sep-2019 21:31:51 ET |
Download |
17-Sep-2019 ET |
2019 |
1672 |
0 |
Coex SC |
EN 301 893 Spectrum Mask Interpretations |
David Boldy (Broadcom) |
17-Sep-2019 23:54:52 ET |
Download |
05-Sep-2019 ET |
2019 |
1469 |
1 |
Coex SC |
LS to 3GPP RAN1 about short LBT |
Andrew Myles (Cisco) |
05-Sep-2019 20:18:53 ET |
Download |
05-Sep-2019 ET |
2019 |
1474 |
1 |
Coex SC |
LS to 3GPP RAN1 about blocking energy |
Andrew Myles (Cisco) |
05-Sep-2019 20:18:17 ET |
Download |
03-Sep-2019 ET |
2019 |
1474 |
0 |
Coex SC |
LS to 3GPP RAN1 about blocking energy |
Andrew Myles (Cisco) |
04-Sep-2019 00:38:30 ET |
Download |
02-Sep-2019 ET |
2019 |
1469 |
0 |
Coex SC |
LS to 3GPP RAN1 about short LBT |
Andrew Myles (Cisco) |
02-Sep-2019 20:42:07 ET |
Download |
09-Mar-2018 ET |
2018 |
580 |
1 |
Coex SC |
Enhancing Collaboration between IEEE 802 and World Regulators on unlicensed spectrum regulations |
Lloyd Matabishi (ZICTA) |
09-Mar-2018 09:40:46 ET |
Download |
08-Mar-2018 ET |
2018 |
580 |
0 |
Coex SC |
Enhancing Collaboration between IEEE 802 and World Regulators on unlicensed spectrum regulations |
Lloyd Matabishi (ZICTA) |
08-Mar-2018 12:59:55 ET |
Download |
25-Oct-2007 ET |
2007 |
2627 |
1 |
DLS SG |
TGz-Oct-07-telecon-meeting-notes |
Daniel R. Borges (Apple, Inc) |
30-Oct-2007 12:33:27 ET |
Download |
02-Oct-2007 ET |
2007 |
2627 |
0 |
DLS SG |
TGz-Oct-07-telecon-meeting-notes |
Daniel R. Borges (Apple, Inc) |
25-Oct-2007 08:09:34 ET |
Download |
18-Sep-2007 ET |
2007 |
2527 |
0 |
DLS SG |
TGz Hawaii Minutes |
Daniel Borges (Apple) |
21-Sep-2007 18:26:35 ET |
Download |
07-Mar-2019 ET |
2019 |
360 |
0 |
EHT TIG/SG |
MAC Architectures for EHT Multi-band Operation |
Sharan Naribole (Samsung) |
13-Mar-2019 00:14:39 ET |
Download |
28-Nov-2018 ET |
2018 |
1963 |
1 |
EHT TIG/SG |
Discussion on HARQ for EHT |
Bo Sun (ZTE) |
28-Nov-2018 00:50:39 ET |
Download |
11-Nov-2018 ET |
2018 |
1963 |
0 |
EHT TIG/SG |
Discussion on HARQ for EHT |
Bo Sun (ZTE) |
12-Nov-2018 02:54:19 ET |
Download |
13-Sep-2018 ET |
2018 |
1576 |
1 |
EHT TIG/SG |
Considerations on AP Coordination |
Yang Bo [Boyce], Roger Marks, Lyu Yunping [Lily], Yuchen Guo [Jason] (Huawei) |
13-Sep-2018 21:13:14 ET |
Download |
09-Sep-2018 ET |
2018 |
1576 |
0 |
EHT TIG/SG |
Considerations on AP Coordination |
Yang Bo [Boyce], Roger Marks, Lyu Yunping [Lily], Yuchen Guo [Jason] (Huawei) |
09-Sep-2018 04:50:24 ET |
Download |
10-Aug-2010 ET |
2010 |
980 |
0 |
FIA SG |
FIA Security Analysis BobM |
Marc Emmelmann (Fraunhofer FOKUS) |
11-Aug-2010 00:37:50 ET |
Download |
14-Jul-2010 ET |
2010 |
853 |
1 |
FIA SG |
Some Concerns about FIA |
Emily Qi (Intel Corporation) |
14-Jul-2010 10:15:12 ET |
Download |
13-Jul-2010 ET |
2010 |
853 |
0 |
FIA SG |
Some Concerns about FIA |
Emily Qi (Intel Corporation) |
14-Jul-2010 01:03:06 ET |
Download |
17-Jul-2006 ET |
2003 |
770 |
6 |
FRFH SG |
Make Before Break |
Clint Chaplin (Symbol Technologies) |
17-Jul-2006 00:00:00 ET |
Download |
12-Jul-2006 ET |
2003 |
770 |
5 |
FRFH SG |
Make Before Break |
Clint Chaplin (Symbol Technologies) |
12-Jul-2006 00:00:00 ET |
Download |
18-Jun-2006 ET |
2003 |
770 |
4 |
FRFH SG |
Make Before Break |
Clint Chaplin (Symbol Technologies) |
18-Jun-2006 00:00:00 ET |
Download |
14-May-2006 ET |
2003 |
770 |
3 |
FRFH SG |
Make Before Break |
Clint Chaplin (Symbol Technologies) |
14-May-2006 00:00:00 ET |
Download |
02-May-2006 ET |
2003 |
770 |
2 |
FRFH SG |
Make Before Break |
Clint Chaplin (Symbol Technologies) |
02-May-2006 00:00:00 ET |
Download |
12-May-2004 ET |
2004 |
606 |
0 |
FRFH SG |
Tentative Association |
Clint Chaplin (Symbol Technologies) |
12-May-2004 00:00:00 ET |
Download |
10-May-2004 ET |
2004 |
549 |
1 |
FRFH SG |
Multiple Concurrent Associations as a Means of Doing Fast Roaming |
Bob Beach (Symbol Technologies) |
10-May-2004 00:00:00 ET |
Download |
10-May-2004 ET |
2004 |
549 |
0 |
FRFH SG |
Multiple Concurrent Associations as a Means of Doing Fast Roaming |
Bob Beach (Symbol Technologies) |
10-May-2004 00:00:00 ET |
Download |
10-May-2004 ET |
2004 |
516 |
0 |
FRFH SG |
Requirements Discussion |
Jesse Walker (Intel Corporation), Bob Beach (Symbol Technologies), Nancy Cam-Winget (Cisco), |
10-May-2004 00:00:00 ET |
Download |
29-Mar-2004 ET |
2004 |
377 |
1 |
FRFH SG |
Analysis of Roaming Techniques |
Areg Alimian(CMC), Bernard Aboba(Microsoft) |
29-Mar-2004 00:00:00 ET |
Download |
17-Mar-2004 ET |
2004 |
377 |
0 |
FRFH SG |
Analysis of Roaming Techniques |
Areg Alimian(CMC), Bernard Aboba(Microsoft) |
17-Mar-2004 00:00:00 ET |
Download |
17-Mar-2004 ET |
2003 |
771 |
6 |
FRFH SG |
Possible PAR |
Clint Chaplin (Symbol Technologies) |
17-Mar-2004 00:00:00 ET |
Download |
16-Jan-2004 ET |
2004 |
162 |
0 |
FRFH SG |
Fast Roaming Study Group Closing Report January 2004 |
Clint Chaplin (Symbol Technologies) |
16-Jan-2004 00:00:00 ET |
Download |
13-Jan-2004 ET |
2004 |
85 |
0 |
FRFH SG |
Approval of PAR and 5 Criteria |
Clint Chaplin (Symbol Technologies) |
13-Jan-2004 00:00:00 ET |
Download |
12-Jan-2004 ET |
2004 |
34 |
0 |
FRFH SG |
Fast Roaming Study Group Opening Report |
Clint Chaplin (Symbol Technologies) |
12-Jan-2004 00:00:00 ET |
Download |
12-Jan-2004 ET |
2004 |
25 |
0 |
FRFH SG |
January 2004 Agenda |
Clint Chaplin (Symbol Technologies) |
12-Jan-2004 00:00:00 ET |
Download |
12-Jan-2004 ET |
2004 |
22 |
0 |
FRFH SG |
Introductory Remarks January 2004 |
Clint Chaplin (Symbol Technologies) |
12-Jan-2004 00:00:00 ET |
Download |
12-Jan-2004 ET |
2003 |
772 |
4 |
FRFH SG |
Possible 5 Criteria |
Clint Chaplin (Symbol Technologies) |
12-Jan-2004 00:00:00 ET |
Download |