Created (ET) |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) ▲ |
Uploaded (ET) |
Actions |
09-Aug-2017 ET |
2017 |
57 |
2 |
0000 |
Liaison statement to WP5C |
ITU-R WP5C (Mike Lynch, MJ Lynch & Associates LLC) |
09-Aug-2017 19:32:55 ET |
Download |
04-Mar-2016 ET |
2016 |
12 |
0 |
0000 |
M.2012 Detailed specifications of the terrestrial radio interfaces of IMT-Advanced |
ITU-R WP5D |
04-Mar-2016 16:52:34 ET |
Download |
04-Mar-2016 ET |
2016 |
11 |
0 |
0000 |
Characteristics of terrestrial IMT systems for frequency sharing/interference analysis between 24.25 GHz and 86 GHz |
ITU-R WP5D |
04-Mar-2016 16:51:52 ET |
Download |
24-Nov-2014 ET |
2014 |
85 |
0 |
0000 |
SCHEDULE FOR REVISION 13 UPDATE OF |
ITU-R WP5D |
24-Nov-2014 11:06:56 ET |
Download |
24-Nov-2014 ET |
2014 |
84 |
0 |
0000 |
Liaison statement to External Organizations on |
ITU-R WP5D |
24-Nov-2014 11:04:14 ET |
Download |
24-Nov-2014 ET |
2014 |
83 |
0 |
0000 |
Working Document towards a Preliminary Draft |
ITU-R WP5D |
24-Nov-2014 10:37:21 ET |
Download |
24-Nov-2014 ET |
2014 |
82 |
0 |
0000 |
TECHNICAL FEASIBILITY OF IMT IN THE BANDS ABOVE 6 GHz |
ITU-R WP5D |
24-Nov-2014 10:41:05 ET |
Download |
24-Nov-2014 ET |
2014 |
81 |
0 |
0000 |
Att_5.8_5D_836 - Architecture |
ITU-R WP5D |
24-Nov-2014 10:51:03 ET |
Download |
24-Nov-2014 ET |
2014 |
80 |
0 |
0000 |
ARCHITECTURE AND TOPOLOGY OF IMT NETWORKS |
ITU-R WP5D |
24-Nov-2014 10:48:37 ET |
Download |
16-Jul-2014 ET |
2014 |
53 |
0 |
0000 |
WD Towards a handbook on global trends in IMT-ITU-R M.[IMT.HANDBOOK] |
ITU-R WP5D |
16-Jul-2014 12:20:08 ET |
Download |
16-Jul-2014 ET |
2014 |
52 |
0 |
0000 |
Transpositions and Certification C for Draft Revision 12 of Recommendation ITU-R M.1457 |
ITU-R WP5D |
16-Jul-2014 12:08:56 ET |
Download |
16-Jul-2014 ET |
2014 |
51 |
0 |
0000 |
Architecture and Topology of IMT networks (LS) |
ITU-R WP5D |
16-Jul-2014 12:02:02 ET |
Download |
16-Jul-2014 ET |
2014 |
50 |
0 |
0000 |
WORK PLAN, TIMELINE, PROCESS AND DELIVERABLES FOR "IMT-2020" |
ITU-R WP5D |
16-Jul-2014 12:01:51 ET |
Download |
16-Jul-2014 ET |
2014 |
49 |
0 |
0000 |
Architecture and topology of IMT networks |
ITU-R WP5D |
16-Jul-2014 11:56:38 ET |
Download |
25-Feb-2014 ET |
2014 |
11 |
0 |
0000 |
Liaison From WP5D |
ITU-R WP5D |
25-Feb-2014 15:06:46 ET |
Download |
02-Aug-2012 ET |
2012 |
79 |
0 |
0000 |
Invitation TO input material for development of Working Document toward a Preliminary Draft New Repo |
ITU-R WP5D |
02-Aug-2012 08:21:21 ET |
Download |
02-Aug-2012 ET |
2012 |
78 |
0 |
0000 |
Liaison from WP5D in regard to frequency sharing in the range 470 - above 6 GHz |
ITU-R WP5D |
02-Aug-2012 08:10:33 ET |
Download |
17-May-2009 ET |
2009 |
72 |
0 |
0000 |
ITU-R WP5D/422 |
ITU-R WP5D |
17-May-2009 13:50:50 ET |
Download |
16-May-2009 ET |
2009 |
71 |
0 |
0000 |
ITU-R WP5D/421 |
ITU-R WP5D |
16-May-2009 14:54:28 ET |
Download |
06-Jul-2016 ET |
2016 |
46 |
0 |
0000 |
ITU-R WP 5D Liaison on Frequency Sharing 24.25-86 GHz |
ITU-R WP 5D |
06-Jul-2016 10:26:18 ET |
Download |
21-Feb-2013 ET |
2013 |
19 |
0 |
0000 |
ITU-R_WP_5D_liaison_revision_of_M.1580-4_and_M.1581-4 |
ITU-R WP 5D |
21-Feb-2013 16:54:03 ET |
Download |
21-Feb-2013 ET |
2013 |
18 |
0 |
0000 |
ITU-R_WP_5D_liaison_re_study_IMT_VISION_2020_and_BEYOND |
ITU-R WP 5D |
21-Feb-2013 16:53:10 ET |
Download |
25-Oct-2012 ET |
2012 |
107 |
0 |
0000 |
Liaison WP 5D on TECHNICAL AND OPERATIONAL ASPECTS OF PASSIVE AND ACTIVE BASE STATION ANTENNAS FOR I |
ITU-R WP 5D |
25-Oct-2012 13:59:41 ET |
Download |
25-Oct-2012 ET |
2012 |
106 |
0 |
0000 |
Liaison WP 5D on REVISION 12 OF RECOMMENDATION ITU-R M.1457 |
ITU-R WP 5D |
25-Oct-2012 13:58:33 ET |
Download |
25-Oct-2012 ET |
2012 |
105 |
0 |
0000 |
Liaison WP 5D PARAMETERS FOR LTE-ADVANCED AND WIRELESSMAN ADVANCED FOR USE IN SHARING STUDIES |
ITU-R WP 5D |
25-Oct-2012 13:57:07 ET |
Download |
25-Oct-2012 ET |
2012 |
104 |
0 |
0000 |
Liaison from WP 5D Requests input on THE USE OF IMT FOR BROADBAND PPDR APPLICATIONS |
ITU-R WP 5D |
25-Oct-2012 13:55:43 ET |
Download |
22-Aug-2011 ET |
2011 |
70 |
0 |
0000 |
Liaison_ITU-R_WP_5D_to_3GPP_IMT.RSPEC |
ITU-R WP 5D |
22-Aug-2011 13:46:27 ET |
Download |
22-Aug-2011 ET |
2011 |
69 |
0 |
0000 |
Liaison_ITU-R_WP_5D_Revision of M.1224 |
ITU-R WP 5D |
22-Aug-2011 13:44:00 ET |
Download |
12-Mar-2017 ET |
2017 |
45 |
0 |
0000 |
ITU-R WORKING PARTY 5D WORKSHOP ON IMT-2020 |
ITU-R WP5D (ITU) |
12-Mar-2017 17:52:46 ET |
Download |
12-Mar-2017 ET |
2017 |
44 |
0 |
0000 |
FURTHER INFORMATION ON THE INVITATION FOR SUBMISSION OF PROPOSALS FOR CANDIDATE RADIO INTERFACE TECHNOLOGIES |
ITU-R WP5D (ITU) |
12-Mar-2017 17:46:01 ET |
Download |
12-Mar-2017 ET |
2017 |
43 |
0 |
0000 |
SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457 TO REVISION 14 |
ITU-R WP5D (ITU) |
12-Mar-2017 17:42:39 ET |
Download |
17-Jan-2017 ET |
2017 |
13 |
1 |
0000 |
Characteristics of terrestrial IMT systems for frequency sharing / interference analysis in the frequency range between 24.25 GHz and 86 GHz |
ITU-R WP5D (ITU-R) |
17-Jan-2017 11:07:38 ET |
Download |
15-Jan-2017 ET |
2017 |
13 |
0 |
0000 |
Characteristics of terrestrial IMT systems for frequency sharing / interference analysis in the frequency range between 24.25 GHz and 86 GHz |
ITU-R WP5D (ITU-R) |
16-Jan-2017 17:54:48 ET |
Download |
12-Jan-2018 ET |
2018 |
7 |
0 |
0000 |
IMT_2020-radio interface tech-R00-SG05-CIR-0059_support |
ITU-R WP5D (Jay Holcomb (Itron)) |
12-Jan-2018 20:30:05 ET |
Download |
12-Jan-2018 ET |
2018 |
6 |
0 |
0000 |
IMT_2020-radio interface tech-R00-SG05-CIR-0059 |
ITU-R WP5D (Jay Holcomb (Itron)) |
12-Jan-2018 20:29:12 ET |
Download |
09-Jul-2017 ET |
2017 |
91 |
0 |
0000 |
Guidelines for evaluation of radio interface technologies for IMT-2020 |
ITU-R WP5D (Mike Lynch, MJ Lynch & Associates) |
09-Jul-2017 22:05:45 ET |
Download |
09-Jul-2017 ET |
2017 |
90 |
0 |
0000 |
Requirements, evaluation criteria and submission templates for the development of IMT-2020 |
ITU-R WP5D (Mike Lynch, MJ Lynch & Associates) |
09-Jul-2017 22:01:45 ET |
Download |
09-Jul-2017 ET |
2017 |
89 |
0 |
0000 |
Twenty-eighth meeting of Working Party 5D on IMT systems |
ITU-R WP5D (Mike Lynch, MJ Lynch & Associates) |
09-Jul-2017 21:59:16 ET |
Download |
09-Jul-2017 ET |
2017 |
88 |
0 |
0000 |
LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS |
ITU-R WP5D (Mike Lynch, MJ Lynch & Associates) |
09-Jul-2017 21:56:45 ET |
Download |
21-Jan-2014 ET |
2014 |
5 |
0 |
0000 |
WP6A Chairman's Report Nov2013 meeting, Annex 14 |
ITU-R WP6A |
21-Jan-2014 14:58:29 ET |
Download |
21-Jan-2014 ET |
2014 |
4 |
0 |
0000 |
WP6A Chairman's Report November 2013 meeting |
ITU-R WP6A |
21-Jan-2014 14:57:15 ET |
Download |
28-May-2012 ET |
2012 |
52 |
0 |
0000 |
Doc. 1A/16 QUESTION ITU-R 236/1 - IMPACT ON RADIOCOMMUNICATION SYSTEMS FROM WIRELESS AND WIRED DATA |
ITU-R WP6A |
28-May-2012 15:44:49 ET |
Download |
28-May-2012 ET |
2012 |
51 |
0 |
0000 |
Doc. 1A/13 DESIGNATION OF FREQUENCIES FOR PURPOSES NOT |
ITU-R WP6A |
28-May-2012 15:40:05 ET |
Download |
28-May-2012 ET |
2012 |
50 |
0 |
0000 |
Doc. 1A/10 COEXISTENCE OF WIRED AND WIRELESS COMMUNICATIONS SYSTEMS |
ITU-R WP6A |
28-May-2012 15:34:36 ET |
Download |
17-Jul-2012 ET |
2012 |
67 |
0 |
0000 |
Access Network Transport Standards Overview December 2011 Q 1/15 meeting |
ITU-T |
17-Jul-2012 16:28:27 ET |
Download |
17-Jul-2012 ET |
2012 |
66 |
0 |
0000 |
Access Network Transport Standards Work Plan December 2011 Q 1/15 meeting |
ITU-T |
17-Jul-2012 16:25:04 ET |
Download |
24-Nov-2011 ET |
2011 |
95 |
0 |
0000 |
Liaison to ITU-R SG 1 SG5 on Narrowband Wireless Home Networing |
ITU-T |
24-Nov-2011 13:00:18 ET |
Download |
15-Mar-2014 ET |
2014 |
13 |
0 |
0000 |
LIAISON STATEMENT TO ITU-R SG 1 REGARDING DRAFT AMENDMENT 1 TO RECOMMENDATION ITU-T G.9955 (2011) (EX G.HNEM) |
ITU-T SG15 |
15-Mar-2014 01:27:26 ET |
Download |
15-Mar-2014 ET |
2014 |
12 |
0 |
0000 |
LIAISON TO ITU-R STUDY GROUP 1 REGARDING G.wnb, |
ITU-T SG15 |
15-Mar-2014 01:22:19 ET |
Download |
12-Nov-2013 ET |
2013 |
114 |
0 |
0000 |
Liaison Statement on Determination of the ITU-T G.fast PSD specification |
ITU-T SG15 |
12-Nov-2013 15:46:13 ET |
Download |
18-Jun-2012 ET |
2012 |
55 |
0 |
0000 |
LIAISON TO ITU-R STUDY GROUP 1 REGARDING G.wnb, |
ITU-T SG-15 |
18-Jun-2012 14:55:07 ET |
Download |
28-May-2012 ET |
2012 |
49 |
0 |
0000 |
Doc. 1A/2 LIAISON STATEMENT - UPDATE ON SMART GRID ACTIVITIES IN ITU, INCLUDING POWER LINE COMMUNICA |
ITU-T SG-15 |
28-May-2012 15:29:58 ET |
Download |
29-Apr-2013 ET |
2013 |
57 |
0 |
0000 |
Liaison Statement from ITU-T SG 5 Interference Between Wireless and Wired Broadband or Cable TV |
ITU-T SG 5 |
29-Apr-2013 13:37:33 ET |
Download |
29-Apr-2013 ET |
2013 |
56 |
0 |
0000 |
3rd revision of draft Recommendation K.mhn |
ITU-T SG 5 |
29-Apr-2013 13:34:06 ET |
Download |
21-Feb-2013 ET |
2013 |
20 |
0 |
0000 |
ITU-T_SG_5_liaison_K.60_report |
ITU-T SG 5 |
21-Feb-2013 16:54:45 ET |
Download |
12-Jul-2010 ET |
2010 |
39 |
0 |
0000 |
ITU-T Request for Input |
ITU-T Smart Grid Focus Group |
12-Jul-2010 11:59:15 ET |
Download |
14-Jul-2008 ET |
2008 |
40 |
0 |
0000 |
GERDCS |
Ivan Reede (Amerisys) |
15-Jul-2008 12:44:53 ET |
Download |
25-Feb-2014 ET |
2013 |
117 |
6 |
0000 |
802.24 draft for ITU-R Q236 |
James Gilb (Tensorcom) |
25-Feb-2014 22:50:18 ET |
Download |
23-Jan-2014 ET |
2013 |
117 |
5 |
0000 |
802.24 draft for ITU-R Q236 |
James Gilb (Tensorcom) |
23-Jan-2014 12:09:00 ET |
Download |
22-Jan-2014 ET |
2013 |
117 |
4 |
0000 |
802.24 draft for ITU-R Q236 |
James Gilb (Tensorcom) |
22-Jan-2014 19:16:58 ET |
Download |
21-Jan-2014 ET |
2013 |
117 |
3 |
0000 |
802.24 draft for ITU-R Q236 |
James Gilb (Tensorcom) |
21-Jan-2014 21:20:08 ET |
Download |
14-Nov-2013 ET |
2013 |
117 |
2 |
0000 |
802.24 draft for ITU-R Q236 |
James Gilb (Tensorcom) |
14-Nov-2013 12:21:11 ET |
Download |
14-Nov-2013 ET |
2013 |
117 |
1 |
0000 |
802.24 draft for ITU-R Q236 |
James Gilb (Tensorcom) |
14-Nov-2013 10:19:48 ET |
Download |
16-May-2013 ET |
2013 |
67 |
1 |
0000 |
Draft contribution of IEEE 802 on Question 236/1 |
James Gilb (Tensorcom) |
16-May-2013 17:24:21 ET |
Download |
16-May-2013 ET |
2013 |
67 |
0 |
0000 |
Draft contribution of IEEE 802 on Question 236/1 |
James Gilb (Tensorcom) |
16-May-2013 16:48:22 ET |
Download |
21-Mar-2019 ET |
2019 |
42 |
0 |
0000 |
Japan's Outline of Proposed Amendment to Ministerial Ordinance |
Japan (Jay Holcomb (Itron)) |
21-Mar-2019 23:18:22 ET |
Download |
27-Mar-2020 ET |
2020 |
50 |
1 |
0000 |
agenda_26mar20_RRTAG_teleconference |
jay Holcomb (Itron) |
27-Mar-2020 23:22:01 ET |
Download |
20-Mar-2020 ET |
2020 |
50 |
0 |
0000 |
agenda_26mar20_RRTAG_teleconference |
jay Holcomb (Itron) |
26-Mar-2020 13:23:34 ET |
Download |
14-Aug-2020 ET |
2020 |
120 |
0 |
0000 |
minutes_20aug20_RRTAG_teleconference |
Jay Holcomb (itron) |
21-Aug-2020 11:46:46 ET |
Download |
28-Feb-2020 ET |
2020 |
32 |
0 |
0000 |
minutes_05mar20_RRTAG_teleconference |
Jay Holcomb (itron) |
06-Mar-2020 20:13:15 ET |
Download |
16-Nov-2019 ET |
2019 |
142 |
2 |
0000 |
agenda_koa-plenary_10-15nov2019_rr-tag |
Jay Holcomb (itron) |
16-Nov-2019 08:57:04 ET |
Download |
12-Nov-2019 ET |
2019 |
142 |
1 |
0000 |
agenda_koa-plenary_10-15nov2019_rr-tag |
Jay Holcomb (itron) |
12-Nov-2019 23:35:19 ET |
Download |
05-Nov-2019 ET |
2019 |
142 |
0 |
0000 |
agenda_koa-plenary_10-15nov2019_rr-tag |
Jay Holcomb (itron) |
11-Nov-2019 11:04:38 ET |
Download |
21-Mar-2022 ET |
2022 |
28 |
1 |
0000 |
minutes_10-17mar22-rrtag-pleanry(mco) |
Jay Holcomb (Itron) |
21-Mar-2022 11:23:54 ET |
Download |
21-Mar-2022 ET |
2022 |
27 |
2 |
0000 |
agenda_10-17mar22-rrtag-pleanry(mco) |
Jay Holcomb (Itron) |
21-Mar-2022 11:23:34 ET |
Download |
14-Mar-2022 ET |
2022 |
27 |
1 |
0000 |
agenda_10-17mar22-rrtag-pleanry(mco) |
Jay Holcomb (Itron) |
14-Mar-2022 11:15:07 ET |
Download |
04-Mar-2022 ET |
2022 |
25 |
1 |
0000 |
agenda_03mar22_RRTAG_teleconference |
Jay Holcomb (Itron) |
04-Mar-2022 17:57:49 ET |
Download |
28-Feb-2022 ET |
2022 |
28 |
0 |
0000 |
minutes_10-17mar22-rrtag-pleanry(mco) |
Jay Holcomb (Itron) |
14-Mar-2022 11:14:43 ET |
Download |
28-Feb-2022 ET |
2022 |
27 |
0 |
0000 |
agenda_10-17mar22-rrtag-pleanry(mco) |
Jay Holcomb (Itron) |
10-Mar-2022 10:22:08 ET |
Download |
27-Feb-2022 ET |
2022 |
26 |
0 |
0000 |
minutes_03mar22_RRTAG_teleconference |
Jay Holcomb (Itron) |
04-Mar-2022 17:58:04 ET |
Download |
27-Feb-2022 ET |
2022 |
25 |
0 |
0000 |
agenda_03mar22_RRTAG_teleconference |
Jay Holcomb (Itron) |
03-Mar-2022 09:09:23 ET |
Download |
27-Feb-2022 ET |
2022 |
23 |
1 |
0000 |
agenda_24feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
27-Feb-2022 22:57:26 ET |
Download |
24-Feb-2022 ET |
2022 |
17 |
1 |
0000 |
agenda_22feb22-adhoc_frequency-table |
Jay Holcomb (Itron) |
24-Feb-2022 10:21:04 ET |
Download |
18-Feb-2022 ET |
2022 |
24 |
0 |
0000 |
minutes_24feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
27-Feb-2022 22:57:48 ET |
Download |
18-Feb-2022 ET |
2022 |
23 |
0 |
0000 |
agenda_24feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
24-Feb-2022 09:47:43 ET |
Download |
18-Feb-2022 ET |
2022 |
20 |
1 |
0000 |
agenda_17feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
18-Feb-2022 13:51:05 ET |
Download |
13-Feb-2022 ET |
2022 |
21 |
0 |
0000 |
minutes_17feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
18-Feb-2022 13:51:20 ET |
Download |
13-Feb-2022 ET |
2022 |
20 |
0 |
0000 |
agenda_17feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
17-Feb-2022 09:34:16 ET |
Download |
13-Feb-2022 ET |
2022 |
15 |
1 |
0000 |
agenda_10feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
13-Feb-2022 19:27:31 ET |
Download |
09-Feb-2022 ET |
2022 |
6 |
4 |
0000 |
agenda_electronic-wireless-interim_20-27jan22_rr-tag(pty) |
Jay Holcomb (Itron) |
09-Feb-2022 08:30:46 ET |
Download |
09-Feb-2022 ET |
2022 |
7 |
2 |
0000 |
minutes_electronic-wireles-interim_20-27jan22_rr-tag(pty) |
Jay Holcomb (Itron) |
09-Feb-2022 08:24:52 ET |
Download |
08-Feb-2022 ET |
2022 |
18 |
0 |
0000 |
minutes_22feb22-adhoc_frequency-table |
Jay Holcomb (Itron) |
24-Feb-2022 10:21:26 ET |
Download |
08-Feb-2022 ET |
2022 |
17 |
0 |
0000 |
agenda_22feb22-adhoc_frequency-table |
Jay Holcomb (Itron) |
22-Feb-2022 09:17:43 ET |
Download |
04-Feb-2022 ET |
2022 |
16 |
0 |
0000 |
minutes_10feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
13-Feb-2022 19:27:49 ET |
Download |
04-Feb-2022 ET |
2022 |
15 |
0 |
0000 |
agenda_10feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
10-Feb-2022 09:39:04 ET |
Download |
04-Feb-2022 ET |
2022 |
13 |
1 |
0000 |
agenda_03feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
04-Feb-2022 15:24:23 ET |
Download |
28-Jan-2022 ET |
2022 |
7 |
1 |
0000 |
minutes_electronic-wireles-interim_20-27jan22_rr-tag(pty) |
Jay Holcomb (Itron) |
28-Jan-2022 17:36:45 ET |
Download |
28-Jan-2022 ET |
2022 |
6 |
3 |
0000 |
agenda_electronic-wireless-interim_20-27jan22_rr-tag(pty) |
Jay Holcomb (Itron) |
28-Jan-2022 17:36:20 ET |
Download |
28-Jan-2022 ET |
2022 |
14 |
0 |
0000 |
minutes_03feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
04-Feb-2022 15:24:38 ET |
Download |
28-Jan-2022 ET |
2022 |
13 |
0 |
0000 |
agenda_03feb22_RRTAG_teleconference |
Jay Holcomb (Itron) |
03-Feb-2022 10:07:07 ET |
Download |