Created (ET) |
Year ▼ |
DCN ▼ |
Rev ▼ |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
19-Jan-2012 ET |
2012 |
74 |
1 |
TG4n |
sg4n-cmb-closing-report-jax-jan-2012 |
Clint Powell (PWC, LLC) |
19-Jan-2012 18:32:03 ET |
Download |
19-Jan-2012 ET |
2012 |
74 |
0 |
TG4n |
sg4n-cmb-closing-report-jax-jan-2012 |
Clint Powell (PWC, LLC) |
19-Jan-2012 16:48:47 ET |
Download |
19-Jan-2012 ET |
2012 |
73 |
0 |
SC WNG |
Closing_Report_for_WNG_Jan_2012 |
Pat Kinney (Kinney Consulting) |
19-Jan-2012 15:13:21 ET |
Download |
19-Jan-2012 ET |
2012 |
72 |
0 |
TG9 |
Interim Meeting Minutes Jacksonville January 2012 |
Paul Chilton (NXP Semiconductors) |
10-Feb-2012 05:41:57 ET |
Download |
19-Jan-2012 ET |
2012 |
71 |
0 |
TG4j |
TG4j Interim Meeting Minutes Jacksonville January 2012 |
Dave Evans (Philips) |
24-Jan-2012 03:04:22 ET |
Download |
19-Jan-2012 ET |
2012 |
70 |
0 |
TG4j |
Jan 2012 Closing Report |
Ray Krasinski (Philips) |
19-Jan-2012 14:18:41 ET |
Download |
19-Jan-2012 ET |
2012 |
69 |
0 |
TG4m |
TG4m 4TV Closing Report for January 2012 |
Sangsung Choi(ETRI) |
19-Jan-2012 14:04:43 ET |
Download |
23-Jan-2012 ET |
2012 |
68 |
2 |
SG PTC |
Jacksonville 2012 Closing Report |
Jon Adams (Lilee Systems) |
23-Jan-2012 20:04:47 ET |
Download |
19-Jan-2012 ET |
2012 |
68 |
1 |
SG PTC |
Jacksonville 2012 Closing Report |
Jon Adams (Lilee Systems) |
19-Jan-2012 18:43:41 ET |
Download |
19-Jan-2012 ET |
2012 |
68 |
0 |
SG PTC |
Jacksonville 2012 Closing Report |
Jon Adams (Lilee Systems) |
19-Jan-2012 13:23:09 ET |
Download |
19-Jan-2012 ET |
2012 |
67 |
0 |
WG15 |
Liaison report 802.18 to 802.15 |
John Notor (Notor Research) |
19-Jan-2012 14:19:40 ET |
Download |
19-Jan-2012 ET |
2012 |
66 |
0 |
TG4k |
TG4k_Closing_Report_for_Jacksonville_Jan_2012 |
Pat Kinney (Kinney Consulting) |
19-Jan-2012 14:27:32 ET |
Download |
19-Jan-2012 ET |
2012 |
65 |
0 |
SG PAC |
PAC-Closing-Report-Jan12 |
Myung Lee, CUNY |
19-Jan-2012 10:39:56 ET |
Download |
08-Feb-2012 ET |
2012 |
64 |
1 |
SG PAC |
PAC-five criteria |
Myung Lee, CUNY |
08-Feb-2012 11:26:58 ET |
Download |
19-Jan-2012 ET |
2012 |
64 |
0 |
SG PAC |
PAC-five criteria |
Myung Lee, CUNY |
19-Jan-2012 08:43:40 ET |
Download |
17-Jan-2013 ET |
2012 |
63 |
2 |
SG PAC |
PAC PAR |
Myung Lee, CUNY |
17-Jan-2013 14:52:20 ET |
Download |
08-Feb-2012 ET |
2012 |
63 |
1 |
SG PAC |
PAC PAR |
Myung Lee, CUNY |
08-Feb-2012 22:34:45 ET |
Download |
19-Jan-2012 ET |
2012 |
63 |
0 |
SG PAC |
PAC PAR |
Myung Lee, CUNY |
19-Jan-2012 08:41:57 ET |
Download |
19-Jan-2012 ET |
2012 |
62 |
0 |
TG4m |
Draft TOC |
Kunal Shah (Silver Spring Networks), Ben Rolfe (Blind Creek Associates) |
19-Jan-2012 08:28:29 ET |
Download |
19-Jan-2012 ET |
2012 |
61 |
1 |
TG4m |
Impact of out-of-band emission limit in TVWS to OFDM signals |
Shigenobu Sasaki (Niigata Univ.) |
19-Jan-2012 08:30:54 ET |
Download |
19-Jan-2012 ET |
2012 |
61 |
0 |
TG4m |
Impact of out-of-band emission limit in TVWS to OFDM signals |
Shigenobu Sasaki (Niigata Univ.) |
19-Jan-2012 08:20:25 ET |
Download |
18-Jan-2012 ET |
2012 |
60 |
0 |
TG4m |
Additional Potential Use Case for TG4m |
Liru Lu (Alina), Chin Sean Sum, Fumihide Kojima, Hiroshi Harada |
18-Jan-2012 23:54:50 ET |
Download |
19-Jan-2012 ET |
2012 |
59 |
2 |
TG9 |
TG9-Closing-Report-January-2012 |
Robert Moskowitz (Verizon) |
19-Jan-2012 16:34:55 ET |
Download |
19-Jan-2012 ET |
2012 |
59 |
1 |
TG9 |
TG9-Closing-Report-January-2012 |
Robert Moskowitz (Verizon) |
19-Jan-2012 16:29:25 ET |
Download |
18-Jan-2012 ET |
2012 |
59 |
0 |
TG9 |
TG9-Closing-Report-January-2012 |
Robert Moskowitz (Verizon) |
19-Jan-2012 11:52:21 ET |
Download |
18-Jan-2012 ET |
2012 |
58 |
0 |
TG4k |
Interference Mitigation Issues for LECIM |
Kyung Sup Kwak (Inha University) |
18-Jan-2012 13:33:36 ET |
Download |
18-Jan-2012 ET |
2012 |
57 |
0 |
SC WNG |
group-management-and-routing-issues |
Subir Das |
18-Jan-2012 11:43:00 ET |
Download |
20-Jan-2012 ET |
2012 |
55 |
1 |
SC WNG |
SCWNG-minutes-from-Jacksonville-Jan-12 |
Pat Kinney (Kinney Consulting) |
20-Jan-2012 23:52:15 ET |
Download |
18-Jan-2012 ET |
2012 |
55 |
0 |
SC WNG |
SCWNG-minutes-from-Jacksonville-Jan-12 |
Pat Kinney (Kinney Consulting) |
18-Jan-2012 12:52:31 ET |
Download |
18-Jan-2012 ET |
2012 |
54 |
0 |
TG6 |
TG6 Closing Report Jan 2012 |
Arthur Astrin (Astrin Radio) |
19-Jan-2012 18:52:21 ET |
Download |
18-Jan-2012 ET |
2012 |
53 |
1 |
SG PTC |
Global overview of Existing Radio Communication Systems used for Positive Train Control |
Ibrahim Muftic, Parsons Brinckerhoff |
18-Jan-2012 13:16:41 ET |
Download |
18-Jan-2012 ET |
2012 |
53 |
0 |
SG PTC |
Global overview of Existing Radio Communication Systems used for Positive Train Control |
Ibrahim Muftic, Parsons Brinckerhoff |
18-Jan-2012 10:25:34 ET |
Download |
18-Jan-2012 ET |
2012 |
52 |
1 |
SG PTC |
Overview of Positive Train Control and Request to Approve PAR/5C |
Jon Adams (Lilee Systems) |
18-Jan-2012 10:58:55 ET |
Download |
18-Jan-2012 ET |
2012 |
52 |
0 |
SG PTC |
Overview of Positive Train Control and Request to Approve PAR/5C |
Jon Adams (Lilee Systems) |
18-Jan-2012 09:20:08 ET |
Download |
23-Jan-2012 ET |
2012 |
51 |
2 |
TG4j |
Draft TG4j Amendment Text for Association Proxy |
Dave Evans (Philips) |
23-Jan-2012 06:15:06 ET |
Download |
19-Jan-2012 ET |
2012 |
51 |
1 |
TG4j |
Draft TG4j Amendment Text for Association Proxy |
Dave Evans (Philips) |
19-Jan-2012 09:05:33 ET |
Download |
18-Jan-2012 ET |
2012 |
51 |
0 |
TG4j |
Draft TG4j Amendment Text for Association Proxy |
Dave Evans (Philips) |
18-Jan-2012 09:38:04 ET |
Download |
19-Jan-2012 ET |
2012 |
50 |
1 |
TG4j |
Draft TG4j Amendment Text for Channel Bitmap |
Dave Evans (Philips) |
19-Jan-2012 09:04:46 ET |
Download |
18-Jan-2012 ET |
2012 |
50 |
0 |
TG4j |
Draft TG4j Amendment Text for Channel Bitmap |
Dave Evans (Philips) |
18-Jan-2012 09:37:30 ET |
Download |
18-Jan-2012 ET |
2012 |
49 |
0 |
TG4g |
tg4g-sun-closing-report-jax-jan-2012 |
Phil Beecher (BCC) |
18-Jan-2012 07:28:44 ET |
Download |
18-Jan-2012 ET |
2012 |
48 |
0 |
TG4k |
SFD discussions for LECIM FSK-PHY |
Mi-Kyung Oh and Sangsung Choi (ETRI) |
18-Jan-2012 02:51:48 ET |
Download |
18-Jan-2012 ET |
2012 |
47 |
0 |
TG4f |
Comments Regarding FCC RM-11651 Petition |
Dalibor Pokrajac (GuardRFID) |
18-Jan-2012 02:41:37 ET |
Download |
18-Jan-2012 ET |
2012 |
46 |
1 |
SC WNG |
PAC-introduction |
Myung Lee, CUNY |
18-Jan-2012 10:05:15 ET |
Download |
17-Jan-2012 ET |
2012 |
46 |
0 |
SC WNG |
PAC-introduction |
Myung Lee, CUNY |
17-Jan-2012 23:11:56 ET |
Download |
17-Jan-2012 ET |
2012 |
45 |
0 |
TG4f |
Draft_Comments_FCC_RM-11651_433MHz_Petition |
Mike McInnis (The Boeing Company) |
17-Jan-2012 22:20:01 ET |
Download |
17-Jan-2012 ET |
2012 |
44 |
0 |
TG4k |
Informative_annex |
Pat Kinney (Kinney Consulting) |
09-Feb-2012 14:11:46 ET |
Download |
17-Jan-2012 ET |
2012 |
43 |
0 |
TG4m |
OFDM Proposal Considerations |
Cristina Seibert (Silver Spring Networks) |
17-Jan-2012 16:16:49 ET |
Download |
17-Jan-2012 ET |
2012 |
42 |
0 |
TG4k |
ARRL-comments-to-433-MHz-RFID-Lockheed-Martin-petition-Zip |
Mike McInnis (The Boeing Company) |
17-Jan-2012 12:23:28 ET |
Download |
17-Jan-2012 ET |
2012 |
41 |
0 |
TG4j |
EU MBAN Standardization Update |
Ray Krasinski (Philips) |
17-Jan-2012 09:17:50 ET |
Download |
17-Jan-2012 ET |
2012 |
40 |
0 |
TG4k |
Relayed Slot-Link Network |
Seong-Soon Joo (ETRI) |
17-Jan-2012 14:01:17 ET |
Download |
17-Jan-2012 ET |
2012 |
39 |
0 |
TG4k |
Synchronous Channel Access for LECIM |
Seong-Soon Joo (ETRI) |
19-Jan-2012 13:54:16 ET |
Download |
17-Jan-2012 ET |
2012 |
38 |
0 |
TG4k |
Relayed Slot-Link Network draft for TG4k |
Seong-Soon Joo (ETRI) |
17-Jan-2012 14:15:07 ET |
Download |
17-Jan-2012 ET |
2012 |
37 |
1 |
TG4m |
White Space Channel Models for TG4m WPAN |
Sangsung Choi (ETRI) |
17-Jan-2012 09:28:40 ET |
Download |
17-Jan-2012 ET |
2012 |
37 |
0 |
TG4m |
White Space Channel Models for TG4m WPAN |
Sangsung Choi (ETRI) |
17-Jan-2012 00:54:50 ET |
Download |
16-Jan-2012 ET |
2012 |
36 |
0 |
TG4m |
TG4m-4TV Opening Report for January 2012 |
Sangsung Choi(ETRI) |
16-Jan-2012 21:37:53 ET |
Download |
16-Jan-2012 ET |
2012 |
35 |
0 |
SG PAC |
Potential sub-GHz and UWB channelization in Japan for PAC |
Marco Hernandez (NICT) |
16-Jan-2012 20:42:20 ET |
Download |
16-Jan-2012 ET |
2012 |
34 |
0 |
TG4j |
TG4j Association Proxy |
Dave Evans (Philips) |
16-Jan-2012 17:04:54 ET |
Download |
16-Jan-2012 ET |
2012 |
33 |
0 |
TG4j |
TG4j Channel Bitmap |
Dave Evans (Philips) |
16-Jan-2012 17:03:55 ET |
Download |
16-Jan-2012 ET |
2012 |
32 |
0 |
TG4g |
Tg4g-minutes-for-jacksonville-january-2012 |
Phil Beecher (BCC) |
16-Jan-2012 15:01:34 ET |
Download |
16-Jan-2012 ET |
2012 |
31 |
0 |
TG4k |
Interference Mitigation for IEEE802.15.4k LECIM Networks |
Kyung Sup Kwak (Inha University) |
16-Jan-2012 13:49:05 ET |
Download |
16-Jan-2012 ET |
2012 |
30 |
0 |
TG4k |
FSK Proposal Enhancements |
Cristina Seibert (Silver Spring Networks) et al |
16-Jan-2012 12:29:09 ET |
Download |
17-Jan-2012 ET |
2012 |
29 |
1 |
SG PTC |
216 - 222 MHz Spectrum Considerations |
Jon Adams (Lilee Systems) |
17-Jan-2012 15:23:17 ET |
Download |
16-Jan-2012 ET |
2012 |
29 |
0 |
SG PTC |
216 - 222 MHz Spectrum Considerations |
Jon Adams (Lilee Systems) |
16-Jan-2012 11:58:02 ET |
Download |
17-Jan-2012 ET |
2012 |
27 |
1 |
TG4k |
Out-of-Band Wakeup Mechanism for Downlink Communication |
M. Al Ameen (Inha University) |
17-Jan-2012 14:28:28 ET |
Download |
16-Jan-2012 ET |
2012 |
27 |
0 |
TG4k |
Out-of-Band Wakeup Mechanism for Downlink Communication |
M. Al Ameen (Inha University) |
16-Jan-2012 12:00:59 ET |
Download |
16-Jan-2012 ET |
2012 |
26 |
0 |
SG PTC |
Positive Train Control Study Group Opening Session |
Jon Adams (Lilee Systems) |
16-Jan-2012 11:33:56 ET |
Download |
16-Jan-2012 ET |
2012 |
25 |
0 |
TG4g |
sun-opening-report-jax-january-2012 |
Phil Beecher (BCC) |
16-Jan-2012 10:42:00 ET |
Download |
14-May-2012 ET |
2012 |
24 |
9 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
14-May-2012 23:17:08 ET |
Download |
14-May-2012 ET |
2012 |
24 |
8 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
14-May-2012 06:26:12 ET |
Download |
15-Mar-2012 ET |
2012 |
24 |
7 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
15-Mar-2012 12:54:22 ET |
Download |
13-Mar-2012 ET |
2012 |
24 |
6 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
13-Mar-2012 17:23:43 ET |
Download |
12-Mar-2012 ET |
2012 |
24 |
5 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
12-Mar-2012 16:58:52 ET |
Download |
19-Jan-2012 ET |
2012 |
24 |
4 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
19-Jan-2012 11:58:50 ET |
Download |
17-Jan-2012 ET |
2012 |
24 |
3 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
17-Jan-2012 21:30:18 ET |
Download |
17-Jan-2012 ET |
2012 |
24 |
2 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
17-Jan-2012 11:15:18 ET |
Download |
17-Jan-2012 ET |
2012 |
24 |
1 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
17-Jan-2012 09:54:12 ET |
Download |
16-Jan-2012 ET |
2012 |
24 |
0 |
TG9 |
KMP-Transport-Proposal |
Robert Moskowitz (Verizon) |
16-Jan-2012 09:45:50 ET |
Download |
15-Jan-2012 ET |
2012 |
23 |
0 |
TG4m |
Design Considerations for TG4m |
Chin-Sean Sum (NICT) |
16-Jan-2012 21:52:46 ET |
Download |
15-Jan-2012 ET |
2012 |
22 |
0 |
WG15 |
WG-minutes-from-Jacksonville-Jan-12 |
Pat Kinney (Kinney Consulting) |
28-Jan-2012 23:19:09 ET |
Download |
15-Jan-2012 ET |
2012 |
21 |
0 |
TG4k |
TG4k_Opening_Report_for_Jacksonville_Jan_2012 |
Pat Kinney (Kinney Consulting) |
15-Jan-2012 20:25:21 ET |
Download |
19-Jan-2012 ET |
2012 |
20 |
2 |
TG4n |
sgcmb-january-2012-agenda |
Clint Powell (PWC, LLC) |
19-Jan-2012 15:41:12 ET |
Download |
17-Jan-2012 ET |
2012 |
20 |
1 |
TG4n |
sgcmb-january-2012-agenda |
Clint Powell (PWC, LLC) |
17-Jan-2012 17:54:01 ET |
Download |
15-Jan-2012 ET |
2012 |
20 |
0 |
TG4n |
sgcmb-january-2012-agenda |
Clint Powell (PWC, LLC) |
15-Jan-2012 19:01:54 ET |
Download |
11-Nov-2012 ET |
2012 |
19 |
5 |
WG15 |
opening-plenary-information-2012 |
Rick Alfvin (Verilan, Inc.) |
12-Nov-2012 12:05:12 ET |
Download |
16-Sep-2012 ET |
2012 |
19 |
4 |
WG15 |
opening-plenary-information-2012 |
Rick Alfvin (Verilan, Inc.) |
17-Sep-2012 11:06:45 ET |
Download |
15-Jul-2012 ET |
2012 |
19 |
3 |
WG15 |
opening-plenary-information-2012 |
Rick Alfvin (Verilan, Inc.) |
15-Jul-2012 19:25:20 ET |
Download |
12-May-2012 ET |
2012 |
19 |
2 |
WG15 |
opening-plenary-information-2012 |
Rick Alfvin (Verilan, Inc.) |
12-May-2012 10:33:09 ET |
Download |
12-Mar-2012 ET |
2012 |
19 |
1 |
WG15 |
opening-plenary-information-2012 |
Rick Alfvin (Verilan, Inc.) |
12-Mar-2012 01:41:52 ET |
Download |
15-Jan-2012 ET |
2012 |
19 |
0 |
WG15 |
opening-plenary-information-2012 |
Rick Alfvin (Verilan, Inc.) |
15-Jan-2012 17:04:54 ET |
Download |
19-Jan-2012 ET |
2012 |
17 |
2 |
TG9 |
tg9-Opening-Report-Jan-2012 |
Robert Moskowitz (Verizon) |
19-Jan-2012 11:53:09 ET |
Download |
17-Jan-2012 ET |
2012 |
17 |
1 |
TG9 |
tg9-Opening-Report-Jan-2012 |
Robert Moskowitz (Verizon) |
17-Jan-2012 14:03:08 ET |
Download |
15-Jan-2012 ET |
2012 |
17 |
0 |
TG9 |
tg9-Opening-Report-Jan-2012 |
Robert Moskowitz (Verizon) |
16-Jan-2012 07:22:00 ET |
Download |
15-Jan-2012 ET |
2012 |
16 |
0 |
TG9 |
tg9-agenda-jacksonville-2012 |
Robert Moskowitz (Verizon) |
15-Jan-2012 17:29:29 ET |
Download |
14-Jan-2012 ET |
2012 |
15 |
0 |
TG4k |
Status update for FSK PHY drafting |
Matt Johnson (Itron) |
14-Jan-2012 14:20:02 ET |
Download |
12-Mar-2012 ET |
2012 |
14 |
3 |
TG4k |
Radio Specification Analysis of Draft FSK PHY |
Steve Jillings (Semtech) |
12-Mar-2012 03:30:58 ET |
Download |
17-Jan-2012 ET |
2012 |
14 |
2 |
TG4k |
Radio Specification Analysis of Draft FSK PHY |
Steve Jillings (Semtech) |
17-Jan-2012 09:24:24 ET |
Download |
16-Jan-2012 ET |
2012 |
14 |
1 |
TG4k |
Radio Specification Analysis of Draft FSK PHY |
Steve Jillings (Semtech) |
16-Jan-2012 21:55:37 ET |
Download |
13-Jan-2012 ET |
2012 |
14 |
0 |
TG4k |
Radio Specification Analysis of Draft FSK PHY |
Steve Jillings (Semtech) |
15-Jan-2012 18:45:00 ET |
Download |
13-Jan-2012 ET |
2012 |
13 |
0 |
TG4f |
Jan-2012-TG4f-Meeting-Agenda |
Mike McInnis (The Boeing Company) |
13-Jan-2012 11:57:10 ET |
Download |
13-Jan-2012 ET |
2012 |
12 |
0 |
TG4j |
FCC MBAN Rulemaking Update |
Ray Krasinski (Philips) |
13-Jan-2012 10:43:57 ET |
Download |