Created (ET) |
Year ▲ |
DCN ▲ |
Rev ▲ |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
09-Nov-2016 ET |
2016 |
1503 |
1 |
TGax |
CR HE beacon for CID 991 |
Yonggang Fang (ZTE TX) |
09-Nov-2016 16:46:50 ET |
Download |
09-Nov-2016 ET |
2016 |
1503 |
2 |
TGax |
CR HE beacon for CID 991 |
Yonggang Fang (ZTE TX) |
09-Nov-2016 18:54:32 ET |
Download |
08-Nov-2016 ET |
2016 |
1516 |
0 |
TGax |
Random Access CIDs |
Reza Hedayat (Newracom) |
08-Nov-2016 17:43:33 ET |
Download |
09-Nov-2016 ET |
2016 |
1516 |
1 |
TGax |
Random Access CIDs |
Reza Hedayat (Newracom) |
09-Nov-2016 09:14:42 ET |
Download |
08-Nov-2016 ET |
2016 |
1520 |
0 |
TGax |
MU ad-hoc meeting minutes November 2016 |
Kiseon Ryu (LG Electronics) |
08-Nov-2016 21:43:28 ET |
Download |
08-Nov-2016 ET |
2016 |
1522 |
0 |
TGax |
CID 2147 SIGB Encoding |
Hongyuan Zhang (Marvell) |
08-Nov-2016 22:57:11 ET |
Download |
08-Nov-2016 ET |
2016 |
1522 |
1 |
TGax |
CID 2147 SIGB Encoding |
Hongyuan Zhang (Marvell) |
08-Nov-2016 23:03:50 ET |
Download |
09-Nov-2016 ET |
2016 |
1522 |
2 |
TGax |
CID 2147 SIGB Encoding |
Hongyuan Zhang (Marvell) |
09-Nov-2016 14:45:10 ET |
Download |
14-Nov-2016 ET |
2016 |
1522 |
3 |
TGax |
CID 2147 SIGB Encoding |
Hongyuan Zhang (Marvell) |
14-Nov-2016 14:26:09 ET |
Download |
09-Nov-2016 ET |
2016 |
1529 |
0 |
TGax |
resolve TBD in section 25.4.4.5 |
Zhou Lan (Broadcom) |
09-Nov-2016 17:28:28 ET |
Download |
09-Nov-2016 ET |
2016 |
1530 |
0 |
TGax |
November 2016 TGax PHY ad hoc minutes |
Hongyuan Zhang (Marvell) |
09-Nov-2016 16:05:36 ET |
Download |
10-Nov-2016 ET |
2016 |
1537 |
0 |
TGax |
TGax ad hoc meeting |
Guido R. Hiertz (Ericsson) |
10-Nov-2016 11:40:52 ET |
Download |
10-Nov-2016 ET |
2016 |
1546 |
0 |
TGax |
TGax November 2016 Closing Report |
Osama Aboul-Magd (Huawei Technologies) |
10-Nov-2016 17:19:10 ET |
Download |
23-Nov-2016 ET |
2016 |
1567 |
0 |
TGax |
Proposal for DSC, ATPC, Inter-BSSwith Responses to Comments |
Graham Smith (SR Technologies) |
23-Nov-2016 11:11:28 ET |
Download |
09-Jan-2017 ET |
2016 |
1567 |
1 |
TGax |
Proposal for DSC, ATPC, Inter-BSSwith Responses to Comments |
Graham Smith (SR Technologies) |
09-Jan-2017 15:57:55 ET |
Download |
10-Jan-2017 ET |
2016 |
1567 |
2 |
TGax |
Proposal for DSC, ATPC, Inter-BSSwith Responses to Comments |
Graham Smith (SR Technologies) |
10-Jan-2017 10:58:40 ET |
Download |
16-Jan-2017 ET |
2016 |
1567 |
3 |
TGax |
Proposal for DSC, ATPC, Inter-BSSwith Responses to Comments |
Graham Smith (SR Technologies) |
16-Jan-2017 09:14:22 ET |
Download |
17-Jan-2017 ET |
2016 |
1567 |
4 |
TGax |
Proposal for DSC, ATPC, Inter-BSSwith Responses to Comments |
Graham Smith (SR Technologies) |
17-Jan-2017 08:09:21 ET |
Download |
17-Jan-2017 ET |
2016 |
1567 |
5 |
TGax |
Proposal for DSC, ATPC, Inter-BSSwith Responses to Comments |
Graham Smith (SR Technologies) |
17-Jan-2017 15:29:38 ET |
Download |
27-Nov-2016 ET |
2016 |
1569 |
0 |
TGax |
November 2016 TGax Spatial Reuse ad hoc group meeting minutes |
Jae Seung Lee (ETRI) |
27-Nov-2016 14:15:51 ET |
Download |
08-Dec-2016 ET |
2016 |
1587 |
0 |
TGax |
TGax January 2017 Meeting Agenda |
Osama Aboul-Magd (Huawei Technologies) |
08-Dec-2016 15:25:10 ET |
Download |
16-Jan-2017 ET |
2016 |
1587 |
1 |
TGax |
TGax January 2017 Meeting Agenda |
Osama Aboul-Magd (Huawei Technologies) |
16-Jan-2017 11:45:36 ET |
Download |
17-Jan-2017 ET |
2016 |
1587 |
2 |
TGax |
TGax January 2017 Meeting Agenda |
Osama Aboul-Magd (Huawei Technologies) |
17-Jan-2017 16:23:28 ET |
Download |
18-Jan-2017 ET |
2016 |
1587 |
3 |
TGax |
TGax January 2017 Meeting Agenda |
Osama Aboul-Magd (Huawei Technologies) |
18-Jan-2017 20:21:46 ET |
Download |
19-Jan-2017 ET |
2016 |
1587 |
4 |
TGax |
TGax January 2017 Meeting Agenda |
Osama Aboul-Magd (Huawei Technologies) |
19-Jan-2017 17:37:49 ET |
Download |
26-Jan-2017 ET |
2016 |
1587 |
5 |
TGax |
TGax January 2017 Meeting Agenda |
Osama Aboul-Magd (Huawei Technologies) |
26-Jan-2017 10:20:46 ET |
Download |
15-Dec-2016 ET |
2016 |
1604 |
0 |
TGax |
Single BSS Simulations for PAR Verification |
Frank Hsu (MediaTek Inc.) |
15-Dec-2016 03:29:43 ET |
Download |
15-Dec-2016 ET |
2016 |
1607 |
0 |
TGax |
tgax-teleconferences-minutes-from-dec-2016-to-jan-2017 |
Yasuhiko Inoue (NTT) |
15-Dec-2016 22:48:24 ET |
Download |
12-Jan-2017 ET |
2016 |
1607 |
1 |
TGax |
tgax-teleconferences-minutes-from-dec-2016-to-jan-2017 |
Yasuhiko Inoue (NTT) |
12-Jan-2017 04:42:52 ET |
Download |
13-Jan-2017 ET |
2016 |
1607 |
2 |
TGax |
tgax-teleconferences-minutes-from-dec-2016-to-jan-2017 |
Yasuhiko Inoue (NTT) |
13-Jan-2017 00:37:54 ET |
Download |
13-Jan-2017 ET |
2016 |
1607 |
3 |
TGax |
tgax-teleconferences-minutes-from-dec-2016-to-jan-2017 |
Yasuhiko Inoue (NTT) |
13-Jan-2017 00:45:13 ET |
Download |
09-Jan-2017 ET |
2017 |
10 |
0 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
09-Jan-2017 13:54:21 ET |
Download |
09-Jan-2017 ET |
2017 |
10 |
1 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
09-Jan-2017 19:54:19 ET |
Download |
10-Jan-2017 ET |
2017 |
10 |
2 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
10-Jan-2017 14:01:37 ET |
Download |
13-Jan-2017 ET |
2017 |
10 |
3 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
13-Jan-2017 11:52:34 ET |
Download |
15-Jan-2017 ET |
2017 |
10 |
4 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
15-Jan-2017 18:24:08 ET |
Download |
16-Jan-2017 ET |
2017 |
10 |
5 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
16-Jan-2017 15:28:20 ET |
Download |
20-Jan-2017 ET |
2017 |
10 |
6 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
20-Jan-2017 13:38:57 ET |
Download |
09-Feb-2017 ET |
2017 |
10 |
7 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
09-Feb-2017 17:00:00 ET |
Download |
06-Apr-2017 ET |
2017 |
10 |
8 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
06-Apr-2017 22:23:16 ET |
Download |
07-Apr-2017 ET |
2017 |
10 |
9 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
07-Apr-2017 13:39:02 ET |
Download |
10-Apr-2017 ET |
2017 |
10 |
10 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
10-Apr-2017 19:10:07 ET |
Download |
14-Apr-2017 ET |
2017 |
10 |
11 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
14-Apr-2017 15:26:51 ET |
Download |
02-Jun-2017 ET |
2017 |
10 |
12 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
02-Jun-2017 16:10:49 ET |
Download |
18-Aug-2017 ET |
2017 |
10 |
13 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
18-Aug-2017 17:13:34 ET |
Download |
03-Oct-2017 ET |
2017 |
10 |
14 |
TGax |
Comments on TGax D1.0 |
Robert Stacey (Intel) |
03-Oct-2017 16:58:54 ET |
Download |
12-Jan-2017 ET |
2017 |
32 |
0 |
TGax |
Proposal on Simulation Scenario Document for 11ax PAR verification |
Suhwook Kim (LG) |
16-Jan-2017 09:10:06 ET |
Download |
19-Jan-2017 ET |
2017 |
32 |
1 |
TGax |
Proposal on Simulation Scenario Document for 11ax PAR verification |
Suhwook Kim (LG) |
19-Jan-2017 13:38:54 ET |
Download |
12-Jan-2017 ET |
2017 |
37 |
0 |
TGax |
Comment resolution for clause 10.28 |
Jarkko Kneckt (Apple) |
12-Jan-2017 19:18:31 ET |
Download |
13-Jan-2017 ET |
2017 |
44 |
0 |
TGax |
NDP Feedback Report Design |
Ron Porat (Broadcom) |
15-Jan-2017 22:45:35 ET |
Download |
03-Mar-2017 ET |
2017 |
44 |
1 |
TGax |
NDP Feedback Report Design |
Ron Porat (Broadcom) |
03-Mar-2017 19:14:23 ET |
Download |
13-Mar-2017 ET |
2017 |
44 |
2 |
TGax |
NDP Feedback Report Design |
Ron Porat (Broadcom) |
13-Mar-2017 18:45:39 ET |
Download |
13-Mar-2017 ET |
2017 |
44 |
3 |
TGax |
NDP Feedback Report Design |
Ron Porat (Broadcom) |
13-Mar-2017 20:23:42 ET |
Download |
02-May-2017 ET |
2017 |
44 |
4 |
TGax |
NDP Feedback Report Design |
Ron Porat (Broadcom) |
02-May-2017 17:37:51 ET |
Download |
13-Jan-2017 ET |
2017 |
45 |
0 |
TGax |
lb225-cr-27_11_4 |
Yongho Seok (NEWRACOM) |
16-Jan-2017 10:27:24 ET |
Download |
16-Jan-2017 ET |
2017 |
45 |
1 |
TGax |
lb225-cr-27_11_4 |
Yongho Seok (NEWRACOM) |
16-Jan-2017 16:23:41 ET |
Download |
17-Jan-2017 ET |
2017 |
45 |
2 |
TGax |
lb225-cr-27_11_4 |
Yongho Seok (NEWRACOM) |
17-Jan-2017 16:12:04 ET |
Download |
18-Jan-2017 ET |
2017 |
45 |
3 |
TGax |
lb225-cr-27_11_4 |
Yongho Seok (NEWRACOM) |
18-Jan-2017 17:11:42 ET |
Download |
18-Jan-2017 ET |
2017 |
45 |
4 |
TGax |
lb225-cr-27_11_4 |
Yongho Seok (NEWRACOM) |
18-Jan-2017 18:01:59 ET |
Download |
19-Jan-2017 ET |
2017 |
45 |
5 |
TGax |
lb225-cr-27_11_4 |
Yongho Seok (NEWRACOM) |
19-Jan-2017 14:26:33 ET |
Download |
19-Jan-2017 ET |
2017 |
45 |
6 |
TGax |
lb225-cr-27_11_4 |
Yongho Seok (NEWRACOM) |
19-Jan-2017 15:23:31 ET |
Download |
13-Jan-2017 ET |
2017 |
46 |
0 |
TGax |
lb225-cr-27_6_4 |
Yongho Seok (NEWRACOM) |
16-Jan-2017 10:28:04 ET |
Download |
17-Jan-2017 ET |
2017 |
46 |
1 |
TGax |
lb225-cr-27_6_4 |
Yongho Seok (NEWRACOM) |
17-Jan-2017 16:13:05 ET |
Download |
13-Jan-2017 ET |
2017 |
47 |
0 |
TGax |
lb225-cr-28_4_3 |
Yongho Seok (NEWRACOM) |
16-Jan-2017 12:03:40 ET |
Download |
18-Jan-2017 ET |
2017 |
47 |
1 |
TGax |
lb225-cr-28_4_3 |
Yongho Seok (NEWRACOM) |
18-Jan-2017 21:48:58 ET |
Download |
15-Jan-2017 ET |
2017 |
56 |
0 |
TGax |
CR HE PHY Capabilities_Part_1 |
Lochan Verma (Qualcomm) |
16-Jan-2017 12:25:52 ET |
Download |
17-Jan-2017 ET |
2017 |
56 |
1 |
TGax |
CR HE PHY Capabilities_Part_1 |
Lochan Verma (Qualcomm) |
17-Jan-2017 07:25:19 ET |
Download |
15-Jan-2017 ET |
2017 |
60 |
0 |
TGax |
comment resolution for the CCA of preamble puncturing |
Yunbo Li (Huawei) |
17-Jan-2017 10:10:55 ET |
Download |
17-Jan-2017 ET |
2017 |
60 |
1 |
TGax |
comment resolution for the CCA of preamble puncturing |
Yunbo Li (Huawei) |
17-Jan-2017 10:15:31 ET |
Download |
17-Jan-2017 ET |
2017 |
60 |
2 |
TGax |
comment resolution for the CCA of preamble puncturing |
Yunbo Li (Huawei) |
17-Jan-2017 16:36:58 ET |
Download |
17-Jan-2017 ET |
2017 |
60 |
3 |
TGax |
comment resolution for the CCA of preamble puncturing |
Yunbo Li (Huawei) |
17-Jan-2017 17:40:43 ET |
Download |
15-Jan-2017 ET |
2017 |
72 |
0 |
TGax |
CID 6124 Resolution: Remove 2x LTF+08.us GI for UL Transmission |
Jianhan Liu (Mediatek Inc.) |
15-Jan-2017 22:36:40 ET |
Download |
15-Jan-2017 ET |
2017 |
72 |
1 |
TGax |
CID 6124 Resolution: Remove 2x LTF+08.us GI for UL Transmission |
Jianhan Liu (Mediatek Inc.) |
15-Jan-2017 22:38:14 ET |
Download |
16-Jan-2017 ET |
2017 |
72 |
2 |
TGax |
CID 6124 Resolution: Remove 2x LTF+08.us GI for UL Transmission |
Jianhan Liu (Mediatek Inc.) |
16-Jan-2017 18:02:45 ET |
Download |
15-Jan-2017 ET |
2017 |
73 |
0 |
TGax |
CR for 27.5.2.7 NDP feedback report |
laurent cariou (Intel) |
16-Jan-2017 11:10:53 ET |
Download |
13-Mar-2017 ET |
2017 |
73 |
1 |
TGax |
CR for 27.5.2.7 NDP feedback report |
laurent cariou (Intel) |
13-Mar-2017 13:29:27 ET |
Download |
01-May-2017 ET |
2017 |
73 |
2 |
TGax |
CR for 27.5.2.7 NDP feedback report |
laurent cariou (Intel) |
01-May-2017 15:58:44 ET |
Download |
08-May-2017 ET |
2017 |
73 |
3 |
TGax |
CR for 27.5.2.7 NDP feedback report |
laurent cariou (Intel) |
08-May-2017 03:09:21 ET |
Download |
09-May-2017 ET |
2017 |
73 |
4 |
TGax |
CR for 27.5.2.7 NDP feedback report |
laurent cariou (Intel) |
09-May-2017 22:45:32 ET |
Download |
10-May-2017 ET |
2017 |
73 |
5 |
TGax |
CR for 27.5.2.7 NDP feedback report |
laurent cariou (Intel) |
10-May-2017 04:01:45 ET |
Download |
15-Jan-2017 ET |
2017 |
74 |
0 |
TGax |
Explanations for CR on 27.5.2.7 |
laurent cariou (Intel) |
16-Jan-2017 11:11:37 ET |
Download |
06-Mar-2017 ET |
2017 |
74 |
1 |
TGax |
Explanations for CR on 27.5.2.7 |
laurent cariou (Intel) |
06-Mar-2017 20:38:25 ET |
Download |
13-Mar-2017 ET |
2017 |
74 |
2 |
TGax |
Explanations for CR on 27.5.2.7 |
laurent cariou (Intel) |
13-Mar-2017 13:34:35 ET |
Download |
13-Mar-2017 ET |
2017 |
74 |
3 |
TGax |
Explanations for CR on 27.5.2.7 |
laurent cariou (Intel) |
13-Mar-2017 21:07:50 ET |
Download |
15-Jan-2017 ET |
2017 |
75 |
0 |
TGax |
SRP-based SR Summary and Update |
James Wang (MediaTek) |
15-Jan-2017 22:42:28 ET |
Download |
16-Jan-2017 ET |
2017 |
75 |
1 |
TGax |
SRP-based SR Summary and Update |
James Wang (MediaTek) |
16-Jan-2017 09:54:12 ET |
Download |
16-Jan-2017 ET |
2017 |
75 |
2 |
TGax |
SRP-based SR Summary and Update |
James Wang (MediaTek) |
16-Jan-2017 13:51:47 ET |
Download |
16-Jan-2017 ET |
2017 |
75 |
3 |
TGax |
SRP-based SR Summary and Update |
James Wang (MediaTek) |
16-Jan-2017 14:28:09 ET |
Download |
16-Jan-2017 ET |
2017 |
75 |
4 |
TGax |
SRP-based SR Summary and Update |
Matthew Fischer (Broadcom Limited) |
16-Jan-2017 17:12:44 ET |
Download |
17-Jan-2017 ET |
2017 |
75 |
5 |
TGax |
SRP-based SR Summary and Update |
Matthew Fischer (Broadcom Limited) |
17-Jan-2017 14:00:44 ET |
Download |
18-Jan-2017 ET |
2017 |
75 |
6 |
TGax |
SRP-based SR Summary and Update |
Matthew Fischer (Broadcom Limited) |
18-Jan-2017 11:40:02 ET |
Download |
08-Mar-2017 ET |
2017 |
75 |
7 |
TGax |
SRP-based SR Summary and Update |
Matthew Fischer (Broadcom Limited) |
08-Mar-2017 13:29:06 ET |
Download |
15-Mar-2017 ET |
2017 |
75 |
8 |
TGax |
SRP-based SR Summary and Update |
Matthew Fischer (Broadcom Limited) |
15-Mar-2017 12:33:19 ET |
Download |
15-Jan-2017 ET |
2017 |
76 |
0 |
TGax |
Multiple BSS Simulations for PAR Verification |
Frank Hsu (MediaTek Inc.) |
15-Jan-2017 22:53:39 ET |
Download |
18-Jan-2017 ET |
2017 |
76 |
1 |
TGax |
Multiple BSS Simulations for PAR Verification |
Frank Hsu (MediaTek Inc.) |
18-Jan-2017 20:00:19 ET |
Download |
15-Jan-2017 ET |
2017 |
77 |
0 |
TGax |
Proposed changes to Draft 1.0 |
Xiaogang Chen (Intel) |
15-Jan-2017 23:14:12 ET |
Download |
16-Jan-2017 ET |
2017 |
77 |
1 |
TGax |
Proposed changes to Draft 1.0 |
Xiaogang Chen (Intel) |
16-Jan-2017 11:20:26 ET |
Download |
15-Jan-2017 ET |
2017 |
78 |
0 |
TGax |
RBW of 11ax |
Xiaogang Chen (Intel) |
16-Jan-2017 10:53:18 ET |
Download |
13-Mar-2017 ET |
2017 |
78 |
1 |
TGax |
RBW of 11ax |
Xiaogang Chen (Intel) |
13-Mar-2017 12:50:50 ET |
Download |
16-Jan-2017 ET |
2017 |
81 |
0 |
TGax |
consideration of spatial reuse |
Kaiying Lv (ZTE Corp.) |
18-Jan-2017 08:23:00 ET |
Download |