Created (ET) |
Year |
DCN |
Rev |
Group ▲ |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
14-Jun-2006 ET |
2006 |
844 |
1 |
TGs |
Document Structure Reorg Overview |
W. Steven Conner (Intel Corporation) |
14-Jun-2006 00:00:00 ET |
Download |
14-Jun-2006 ET |
2006 |
844 |
0 |
TGs |
Document Structure Reorg Overview |
W. Steven Conner (Intel Corporation) |
14-Jun-2006 00:00:00 ET |
Download |
13-Jun-2006 ET |
2006 |
839 |
0 |
TGs |
Local Link State Maintenance Procedures |
Guenael Strutt (Motorola) |
13-Jun-2006 00:00:00 ET |
Download |
25-May-2005 ET |
2005 |
398 |
1 |
TGs |
Simple Efficient And Extensible Mesh |
Shantanu Kangude, Ariton Xhafa (Texas Instruments Inc.) |
25-May-2005 00:00:00 ET |
Download |
17-May-2005 ET |
2005 |
398 |
0 |
TGs |
Simple Efficient And Extensible Mesh |
Shantanu Kangude, Ariton Xhafa, Harshal Chhaya (Texas Instruments Inc.) |
17-May-2005 00:00:00 ET |
Download |
13-May-2005 ET |
2005 |
394 |
0 |
TGs |
11 05 0394 00 000s Distributed End To End Flow Set Up |
Sridhar Ramesh (Texas Instruments) |
13-May-2005 00:00:00 ET |
Download |
13-May-2005 ET |
2005 |
392 |
0 |
TGs |
Ripple Distributed Medium Access Protocol Wireless Mesh Network |
Ray-Guang Cheng, Cun-Yi Wang, Jen-Shun Yang (NTUST) |
13-May-2005 00:00:00 ET |
Download |
13-May-2005 ET |
2005 |
334 |
0 |
TGs |
Ripple Distributed Medium Access Protocol Wireless Mesh Networks |
Ray-Guang Cheng, Cun-Yi Wang, Jen-Shun Yang (NTUST) |
13-May-2005 00:00:00 ET |
Download |
24-Feb-2006 ET |
2006 |
324 |
0 |
TGT |
Proposed Ttl Section Structure |
Larry Green (Ixia) |
24-Feb-2006 00:00:00 ET |
Download |
22-Sep-2005 ET |
2005 |
951 |
0 |
TGT |
Streaming Media Performance |
Fahd Pirzada, Pratik Mehta (Dell) |
22-Sep-2005 00:00:00 ET |
Download |
21-Sep-2005 ET |
2005 |
887 |
0 |
TGT |
Video Testing Strategy |
Philip Corriveau (Intel) |
21-Sep-2005 00:00:00 ET |
Download |
17-Mar-2005 ET |
2005 |
296 |
0 |
TGT |
TGT Document Structure |
Fanny Mlinarsky (Azimuth Systems) |
17-Mar-2005 00:00:00 ET |
Download |
15-Mar-2005 ET |
2005 |
178 |
0 |
TGT |
Streaming Media Apps |
Fahd Pirzada (Dell) |
15-Mar-2005 00:00:00 ET |
Download |
18-Jan-2005 ET |
2004 |
1503 |
1 |
TGT |
TGT Document Structure |
Fanny Mlinarsky (Azimuth Systems) |
18-Jan-2005 00:00:00 ET |
Download |
17-Jan-2005 ET |
2005 |
10 |
0 |
TGT |
Proposed TGT Document Structure |
Fanny Mlinarsky (Azimuth Systems) |
17-Jan-2005 00:00:00 ET |
Download |
17-Jan-2005 ET |
2005 |
2 |
0 |
TGT |
Proposed TGT Document Structure |
Fanny Mlinarsky |
17-Jan-2005 00:00:00 ET |
Download |
18-Nov-2004 ET |
2004 |
1503 |
0 |
TGT |
TGT Document Structure |
Fanny Mlinarsky (Azimuth Systems) |
18-Nov-2004 00:00:00 ET |
Download |
18-Nov-2004 ET |
2004 |
1466 |
1 |
TGT |
Rate Management Performance Concepts |
Mike Wilhoyte, Texas Instruments |
18-Nov-2004 00:00:00 ET |
Download |
16-Nov-2004 ET |
2004 |
1466 |
0 |
TGT |
Rate Management Performance Concepts |
Mike Wilhoyte, Texas Instruments |
16-Nov-2004 00:00:00 ET |
Download |
02-Oct-2004 ET |
2004 |
1162 |
0 |
TGT |
Systems Supporting Devices Under Test |
Mike Goettemoeller (Texas Instruments) |
02-Oct-2004 00:00:00 ET |
Download |
15-May-2007 ET |
2007 |
741 |
0 |
TGu |
Proposed Update Text Qos Map Distribution |
Hong Cheng (Panasonic), Dave Stephenson (Cisco Systems) |
15-May-2007 12:56:00 ET |
Download |
01-Mar-2007 ET |
2007 |
267 |
0 |
TGu |
802 11u Bootstrap With 802 21 |
Matthew Gast (Trapeze Networks) |
01-Mar-2007 16:53:00 ET |
Download |
21-Sep-2006 ET |
2006 |
1441 |
3 |
TGu |
Tgu Meeting Minutes September 2006 Melbourne Australia |
Matthew Gast (Trapeze Networks) |
21-Sep-2006 00:00:00 ET |
Download |
19-Sep-2006 ET |
2006 |
1441 |
1 |
TGu |
Tgu Meeting Minutes September 2006 Melbourne Australia |
Matthew Gast (Trapeze Networks) |
19-Sep-2006 00:00:00 ET |
Download |
18-Sep-2006 ET |
2006 |
1441 |
0 |
TGu |
Tgu Meeting Minutes September 2006 Melbourne Australia |
Matthew Gast (Trapeze Networks) |
18-Sep-2006 00:00:00 ET |
Download |
17-May-2006 ET |
2006 |
709 |
1 |
TGu |
Restriction Probe |
Hitoshi Morioka (ROOT Inc) |
17-May-2006 00:00:00 ET |
Download |
16-May-2006 ET |
2006 |
709 |
0 |
TGu |
Restriction Probe |
Hitoshi Morioka (ROOT Inc) |
16-May-2006 00:00:00 ET |
Download |
16-Jan-2006 ET |
2005 |
1224 |
1 |
TGu |
Brief Measurement Probe Requestresponse |
Hitoshi Morioka (ROOT Inc) |
16-Jan-2006 00:00:00 ET |
Download |
17-Nov-2005 ET |
2005 |
1224 |
0 |
TGu |
Brief Measurement Probe Requestresponse |
Hitoshi Morioka (ROOT Inc) |
17-Nov-2005 00:00:00 ET |
Download |
14-Nov-2005 ET |
2005 |
1062 |
0 |
TGu |
Shared Infrastructure |
Mike Moreton (STMicroelectronics) |
14-Nov-2005 00:00:00 ET |
Download |
16-Nov-2009 ET |
2009 |
1193 |
0 |
TGv |
Station Location |
Leo Estevez (Texas Instruments) |
16-Nov-2009 13:59:59 ET |
Download |
21-Sep-2009 ET |
2009 |
1020 |
0 |
TGv |
GPS Aided WLAN Network Finder |
Leo Estevez (Texas Instruments) |
21-Sep-2009 20:44:47 ET |
Download |
08-Sep-2008 ET |
2008 |
883 |
3 |
TGv |
lb133-comments-BSSTransition |
Emily Qi (Intel) |
08-Sep-2008 19:34:31 ET |
Download |
17-Jul-2008 ET |
2008 |
883 |
2 |
TGv |
lb133-comments-BSSTransition |
Emily Qi (Intel) |
17-Jul-2008 13:13:52 ET |
Download |
17-Jul-2008 ET |
2008 |
883 |
1 |
TGv |
lb133-comments-BSSTransition |
Emily Qi (Intel) |
17-Jul-2008 10:06:36 ET |
Download |
16-Jul-2008 ET |
2008 |
883 |
0 |
TGv |
lb133-comments-BSSTransition |
Emily Qi (Intel) |
16-Jul-2008 11:29:24 ET |
Download |
20-Mar-2008 ET |
2008 |
233 |
2 |
TGv |
Co-located Interference Reporting |
Dean Armstrong (CSR) |
20-Mar-2008 08:52:36 ET |
Download |
20-Mar-2008 ET |
2008 |
233 |
1 |
TGv |
Co-located Interference Reporting |
Dean Armstrong (CSR) |
20-Mar-2008 08:24:02 ET |
Download |
07-Feb-2008 ET |
2008 |
233 |
0 |
TGv |
Co-located Interference Reporting |
Dean Armstrong (CSR) |
12-Mar-2008 14:07:58 ET |
Download |
15-Nov-2006 ET |
2006 |
1783 |
0 |
TGv |
Timing Measurement Enhancement Synchronization Av Streams |
Kevin Stanton (Intel Corporation) |
15-Nov-2006 00:00:00 ET |
Download |
16-May-2006 ET |
2006 |
722 |
0 |
TGv |
Tgv Premeeting Instructions May 2006 Session |
Harry Worstell (AT&T) |
16-May-2006 00:00:00 ET |
Download |
12-Nov-2005 ET |
2005 |
1126 |
0 |
TGv |
Distributedloadbalancing |
Floyd Backes (AutoCell Labs) |
12-Nov-2005 00:00:00 ET |
Download |
30-Jan-2007 ET |
2007 |
218 |
0 |
TGw |
Protectedmanagementframeswithfastroaming |
Kapil Sood, Jesse Walker (Intel), Dorothy Stanley (Aruba Networks), Nancy Cam-Winget, Abhijit Choudhuri (Cisco Systems) |
30-Jan-2007 20:53:00 ET |
Download |
17-Aug-2006 ET |
2006 |
1080 |
1 |
TGw |
Keystream Uniqueness Property |
Kevin Hayes (Atheros Communications) |
17-Aug-2006 00:00:00 ET |
Download |
19-Jul-2006 ET |
2006 |
1080 |
0 |
TGw |
Keystream Uniqueness Property |
Kevin Hayes (Atheros Communications) |
19-Jul-2006 00:00:00 ET |
Download |
19-Jul-2006 ET |
2006 |
1063 |
1 |
TGw |
Ccmp Nonce Construction And Replay Detection Management Frames |
Henry Ptasinski (Broadcom) |
19-Jul-2006 00:00:00 ET |
Download |
19-Jul-2006 ET |
2006 |
1063 |
0 |
TGw |
Ccmp Nonce Construction And Replay Detection Management Frames |
Henry Ptasinski (Broadcom) |
19-Jul-2006 00:00:00 ET |
Download |
17-Jul-2006 ET |
2006 |
929 |
0 |
TGw |
Constructing Unique Management Streams |
Nancy Cam-Winget (Cisco Systems) |
17-Jul-2006 00:00:00 ET |
Download |
12-May-2006 ET |
2006 |
622 |
0 |
TGw |
802 11i Bootstrapping Using Pana |
Yoshihiro Ohba (Toshiba America Research Inc) |
12-May-2006 00:00:00 ET |
Download |
18-Feb-2008 ET |
2008 |
244 |
0 |
TGy |
DSE Power Constraint |
Peter Ecclesine (Cisco Systems) |
18-Feb-2008 12:45:23 ET |
Download |
11-Sep-2023 ET |
2023 |
1511 |
1 |
UHR SG |
Pilot Tone Allocation and Other Considerations of Tone-Distributed RUs for UHR |
Mahmoud Kamel (InterDigital) |
11-Sep-2023 15:15:13 ET |
Download |
11-Sep-2023 ET |
2023 |
1570 |
0 |
UHR SG |
Latency Consideration of Industrial Scenarios |
YueXu (Huawei) |
11-Sep-2023 09:19:28 ET |
Download |
07-Sep-2023 ET |
2023 |
1516 |
0 |
UHR SG |
Use case for distributed RUs in Downlink |
Sigurd Schelstraete (MaxLinear) |
11-Sep-2023 09:30:08 ET |
Download |
06-Sep-2023 ET |
2023 |
1511 |
0 |
UHR SG |
Pilot Tone Allocation and Other Considerations of Tone-Distributed RUs for UHR |
Mahmoud Kamel (InterDigital) |
11-Sep-2023 14:44:21 ET |
Download |
10-Jul-2023 ET |
2023 |
1176 |
1 |
UHR SG |
Multi-AP Simulations: framework and Joint Transmission results |
Rainer Strobel (MaxLinear) |
10-Jul-2023 04:33:02 ET |
Download |
06-Jul-2023 ET |
2023 |
1176 |
0 |
UHR SG |
Multi-AP Simulations: framework and Joint Transmission results |
Rainer Strobel(MaxLinear) |
09-Jul-2023 04:11:49 ET |
Download |
05-Jul-2023 ET |
2023 |
1155 |
0 |
UHR SG |
Ultra-Low Latency with Wi-Fi |
Sigurd Schelstraete (MaxLinear) |
09-Jul-2023 04:04:24 ET |
Download |
11-May-2023 ET |
2023 |
815 |
0 |
UHR SG |
Consideration of Industrial Automation Scenarios |
Akira Kishida (NTT) |
11-May-2023 02:00:20 ET |
Download |
28-Apr-2023 ET |
2023 |
725 |
0 |
UHR SG |
Uplink MU MIMO Precoding - Follow-up |
Sigurd Schelstraete (MaxLinear) |
28-Apr-2023 12:40:51 ET |
Download |
13-Mar-2023 ET |
2023 |
292 |
1 |
UHR SG |
KPIs for Industrial Automation Use Cases |
Akira Kishida (NTT) |
13-Mar-2023 15:06:44 ET |
Download |
07-Mar-2023 ET |
2023 |
292 |
0 |
UHR SG |
KPIs for Industrial Automation Use Cases |
Akira Kishida (NTT) |
09-Mar-2023 01:01:28 ET |
Download |
17-Jan-2023 ET |
2023 |
27 |
1 |
UHR SG |
Uplink MU MIMO Improvements |
Sigurd Schelstraete (MaxLinear) |
17-Jan-2023 10:37:46 ET |
Download |
10-Jan-2023 ET |
2023 |
37 |
0 |
UHR SG |
UHR Feature to Overcome PSD Limitations Distributed-Tone Resource Units |
Jianhan Liu (Mediatek Inc.) |
10-Jan-2023 13:33:58 ET |
Download |
09-Jan-2023 ET |
2023 |
27 |
0 |
UHR SG |
Uplink MU MIMO Improvements |
Sigurd Schelstraete (MaxLinear) |
14-Jan-2023 17:17:31 ET |
Download |
12-Nov-2022 ET |
2022 |
1970 |
0 |
UHR SG |
SINR aware Spatial Reuse |
Sigurd Schelstraete (MaxLinear) |
13-Nov-2022 23:01:56 ET |
Download |
09-Sep-2022 ET |
2022 |
1567 |
0 |
UHR SG |
C-OFDMA throughput analysis in various mesh backhaul scenarios |
Sigurd Schelstraete (MaxLinear) |
10-Sep-2022 17:42:22 ET |
Download |
09-Sep-2022 ET |
2022 |
1566 |
0 |
UHR SG |
Views on UHR |
Sigurd Schelstraete (MaxLinear) |
10-Sep-2022 17:42:02 ET |
Download |
16-Jan-2008 ET |
2008 |
188 |
0 |
VTS SG |
Draft PAR and 5 Criteria for Video Transport Stream (VTS) SG - Alternate Tense |
Alex Ashley (NDS Ltd) |
16-Jan-2008 23:02:36 ET |
Download |
13-Nov-2007 ET |
2007 |
2842 |
0 |
VTS SG |
Multicast Enhancements for Multimedia Streaming |
Pankratov Denis (LG Electronics), Yongho Seok (LG Electronics) |
13-Nov-2007 10:12:53 ET |
Download |
07-Aug-2007 ET |
2007 |
2296 |
0 |
VTS SG |
VS SG PAR-5C-Strategy |
Ganesh Venkatesan(Intel Corporation) |
08-Aug-2007 17:18:51 ET |
Download |
17-Sep-2004 ET |
2004 |
1148 |
1 |
WAVE SG |
WAVE Meeting Report.ppt |
Lee Armstrong (Armstrong Consulting, Inc.) |
17-Sep-2004 00:00:00 ET |
Download |
17-Sep-2004 ET |
2004 |
1148 |
0 |
WAVE SG |
WAVE Meeting Report.ppt |
Lee Armstrong (Armstrong Consulting, Inc.) |
17-Sep-2004 00:00:00 ET |
Download |
14-Sep-2004 ET |
2004 |
1068 |
0 |
WAVE SG |
wave-sept-opening-report.ppt |
Lee Armstrong (Awrmstrong Consulting, Inc.) |
14-Sep-2004 00:00:00 ET |
Download |
09-Jun-2004 ET |
2003 |
943 |
8 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
09-Jun-2004 00:00:00 ET |
Download |
14-May-2004 ET |
2004 |
650 |
1 |
WAVE SG |
WAVE SG Session Report |
Lee Armstrong (Armstrong Consulting, Inc.) |
14-May-2004 00:00:00 ET |
Download |
14-May-2004 ET |
2004 |
650 |
0 |
WAVE SG |
WAVE SG Session Report |
Lee Armstrong (Armstrong Consulting, Inc.) |
14-May-2004 00:00:00 ET |
Download |
12-May-2004 ET |
2003 |
967 |
5 |
WAVE SG |
WAVE-five-criteria |
Lee Armstrong (Armstrong Consulting, Inc. |
12-May-2004 00:00:00 ET |
Download |
12-May-2004 ET |
2003 |
943 |
7 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
12-May-2004 00:00:00 ET |
Download |
11-May-2004 ET |
2003 |
967 |
4 |
WAVE SG |
WAVE-five-criteria |
Lee Armstrong (Armstrong Consulting, Inc. |
11-May-2004 00:00:00 ET |
Download |
11-May-2004 ET |
2003 |
943 |
6 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
11-May-2004 00:00:00 ET |
Download |
10-May-2004 ET |
2004 |
554 |
0 |
WAVE SG |
review-of-scope-and-objectives.ppt |
Lee Armstrong (Armstrong Consulting, Inc.) |
10-May-2004 00:00:00 ET |
Download |
10-May-2004 ET |
2004 |
524 |
0 |
WAVE SG |
WAVE SG Agenda and Report |
Lee Armstrong (Armstrong Consulting, Inc.) |
10-May-2004 00:00:00 ET |
Download |
19-Mar-2004 ET |
2004 |
435 |
0 |
WAVE SG |
WAVE SG Motion.ppt |
Lee Armstrong (Armstrong Consulting, Inc. |
19-Mar-2004 00:00:00 ET |
Download |
19-Mar-2004 ET |
2004 |
430 |
1 |
WAVE SG |
WAVE Closing Plenary |
Lee Armstrong (Armstrong Consulting, Inc.) |
19-Mar-2004 00:00:00 ET |
Download |
19-Mar-2004 ET |
2004 |
430 |
0 |
WAVE SG |
WAVE Closing Plenary |
Lee Armstrong (Armstrong Consulting, Inc.) |
19-Mar-2004 00:00:00 ET |
Download |
14-Jan-2004 ET |
2004 |
118 |
0 |
WAVE SG |
WAVE-Architecture-and-Implementations.ppt |
Lee Armstrong (Armstrong Consulting, Inc.) |
14-Jan-2004 00:00:00 ET |
Download |
14-Jan-2004 ET |
2004 |
116 |
0 |
WAVE SG |
WAVE-Agenda-January-2004.xls |
Lee Armstrong (Armstrong Consulting, Inc.) |
14-Jan-2004 00:00:00 ET |
Download |
14-Jan-2004 ET |
2004 |
115 |
0 |
WAVE SG |
WAVE-Program-Status-Review.ppt |
Lee Armstrong (Armstrong Consulting, Inc.) |
14-Jan-2004 00:00:00 ET |
Download |
14-Jan-2004 ET |
2004 |
114 |
0 |
WAVE SG |
WAVE-January-Meeting-Introduction.ppt |
Lee Armstrong (Armstrong Consulting, Inc.) |
14-Jan-2004 00:00:00 ET |
Download |
14-Jan-2004 ET |
2003 |
943 |
5 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
14-Jan-2004 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
967 |
3 |
WAVE SG |
WAVE-five-criteria |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
967 |
2 |
WAVE SG |
WAVE-five-criteria |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
967 |
1 |
WAVE SG |
WAVE-five-criteria |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
967 |
0 |
WAVE SG |
WAVE-five-criteria |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
943 |
4 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
943 |
3 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
943 |
2 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
13-Nov-2003 ET |
2003 |
943 |
1 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
13-Nov-2003 00:00:00 ET |
Download |
12-Nov-2003 ET |
2003 |
945 |
0 |
WAVE SG |
WAVE-November-Meeting |
Lee Armstrong (Armstrong Consulting, Inc. |
12-Nov-2003 00:00:00 ET |
Download |
12-Nov-2003 ET |
2003 |
943 |
0 |
WAVE SG |
WAVE-PAR.doc |
Lee Armstrong (Armstrong Consulting, Inc. |
12-Nov-2003 00:00:00 ET |
Download |