Created (ET) ▲ |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
15-Jan-2013 ET |
2013 |
31 |
2 |
TG4m |
Effectiveness of windowing |
Keiichi Mizutani (NICT) |
15-Jan-2013 11:14:32 ET |
Download |
15-Jan-2013 ET |
2013 |
18 |
1 |
TG8 |
Proposed Text on Relative Positioning for TGD |
Jinkyeong Kim (ETRI) |
15-Jan-2013 11:30:48 ET |
Download |
15-Jan-2013 ET |
2013 |
11 |
1 |
TG8 |
Security protocol of IEEE 802.15.9 and its implication |
Junbeom Hur, Sungrae Cho (Chung-Ang Univ.) |
15-Jan-2013 12:20:15 ET |
Download |
15-Jan-2013 ET |
2013 |
50 |
0 |
TG4j |
TG4j Interim Meeting Minutes Vancouver January 2013 |
Dave Evans (Philips) |
16-Jan-2013 11:51:24 ET |
Download |
15-Jan-2013 ET |
2013 |
18 |
2 |
TG8 |
Proposed Text on Relative Positioning for TGD |
Jinkyeong Kim (ETRI) |
15-Jan-2013 12:45:02 ET |
Download |
15-Jan-2013 ET |
2013 |
22 |
1 |
TG9 |
tg9-agenda-vancouver-2013 |
Robert Moskowitz (Verizon) |
15-Jan-2013 13:17:47 ET |
Download |
15-Jan-2013 ET |
2013 |
46 |
1 |
TG8 |
TG procedure for PAC framework document |
Suhwook Kim (LG Electronics) |
15-Jan-2013 13:17:49 ET |
Download |
15-Jan-2013 ET |
2013 |
52 |
0 |
TG4q |
Low power transceiver data rate analysis |
Andy Bottomley (Microsemi) |
15-Jan-2013 13:31:15 ET |
Download |
15-Jan-2013 ET |
2012 |
116 |
7 |
TG9 |
P802.15.9-D001 |
Robert Moskowitz (Verizon) |
15-Jan-2013 13:47:07 ET |
Download |
15-Jan-2013 ET |
2013 |
53 |
0 |
TG8 |
802.16m SDD presented as reference |
Eldad zeira (InterDigital) |
15-Jan-2013 14:56:39 ET |
Download |
15-Jan-2013 ET |
2012 |
584 |
2 |
TG4n |
Dual-band DSSS PHY Proposal for IEEE802.15.4N |
Wei-Xia Zou, Liang Li, Guang-Long Du, |
15-Jan-2013 15:07:37 ET |
Download |
15-Jan-2013 ET |
2012 |
471 |
3 |
TG4n |
Detail Summary of Interference on Chinese Medical Bands |
Ning Li, Shu Tul (BUPT), Liang Li, Liang Zhang (Vinno); |
15-Jan-2013 15:10:34 ET |
Download |
15-Jan-2013 ET |
2012 |
692 |
2 |
TG4m |
TG4m-agenda-Vancouver-January 2013 |
Sangsung Choi(ETRI) |
15-Jan-2013 16:06:11 ET |
Download |
15-Jan-2013 ET |
2013 |
31 |
3 |
TG4m |
Effectiveness of windowing |
Keiichi Mizutani (NICT) |
15-Jan-2013 16:23:50 ET |
Download |
15-Jan-2013 ET |
2013 |
26 |
1 |
TG4p |
January_Interim_Opening_Report |
Jon Adams (Lilee Systems) |
15-Jan-2013 16:58:19 ET |
Download |
15-Jan-2013 ET |
2013 |
55 |
0 |
TG8 |
System level simulation parameters proposal |
Marco Hernandez (NICT) |
15-Jan-2013 17:30:34 ET |
Download |
15-Jan-2013 ET |
2013 |
56 |
0 |
SGsru |
Wireless coexistence for industrial automation |
Ludwig Winkel (Siemens AG) |
15-Jan-2013 20:08:46 ET |
Download |
15-Jan-2013 ET |
2013 |
57 |
0 |
TG4k |
Comments about HWSL in Sponsor Ballot and Proposed Resolutions |
Tao Xing (WSNIRI) |
15-Jan-2013 19:55:32 ET |
Download |
15-Jan-2013 ET |
2012 |
116 |
8 |
TG9 |
P802.15.9-D001 |
Robert Moskowitz (Verizon) |
15-Jan-2013 20:40:31 ET |
Download |
15-Jan-2013 ET |
2013 |
58 |
0 |
TG8 |
Candidate Link Curve SNR-PER |
Seung-Hoon Park (Samsung) |
15-Jan-2013 20:48:27 ET |
Download |
15-Jan-2013 ET |
2013 |
55 |
1 |
TG8 |
System level simulation parameters proposal |
Marco Hernandez (NICT), ad-hoc meeting attendees |
15-Jan-2013 22:40:16 ET |
Download |
15-Jan-2013 ET |
2013 |
59 |
0 |
TG4q |
Considerations for parameters for ULP |
Kiran Bynam(Samsung) |
16-Jan-2013 00:11:25 ET |
Download |
16-Jan-2013 ET |
2013 |
59 |
1 |
TG4q |
Considerations for parameters for ULP |
Kiran Bynam(Samsung) |
16-Jan-2013 00:13:33 ET |
Download |
16-Jan-2013 ET |
2012 |
689 |
2 |
SGsru |
IG SRU January 2013 Agenda |
Shoichi Kitazawa (ATR) |
16-Jan-2013 09:40:45 ET |
Download |
16-Jan-2013 ET |
2013 |
26 |
2 |
TG4p |
January_Interim_Opening_Report |
Jon Adams (Lilee Systems) |
16-Jan-2013 11:25:52 ET |
Download |
16-Jan-2013 ET |
2013 |
63 |
0 |
TG4p |
January_Interim_Closing_Report |
Jon Adams (Lilee Systems) |
17-Jan-2013 13:55:43 ET |
Download |
16-Jan-2013 ET |
2013 |
64 |
0 |
TG4q |
Downlink Communication using wakeup packet |
M. Al Ameen (Inha University) |
17-Jan-2013 14:13:41 ET |
Download |
16-Jan-2013 ET |
2013 |
54 |
1 |
TG4n |
Proposal of Ranging Capabilities with PHY supporting CMB |
W.Kluge, D.Eggert(ATMEL), L.Li(Vinno) |
16-Jan-2013 13:37:49 ET |
Download |
16-Jan-2013 ET |
2013 |
41 |
2 |
TG4n |
Coexistent technical proposal for wearable 15.4n device |
Kuroda (NICT) |
16-Jan-2013 13:37:53 ET |
Download |
16-Jan-2013 ET |
2013 |
59 |
2 |
TG4q |
Considerations for parameters for ULP |
Kiran Bynam(Samsung) |
16-Jan-2013 13:58:14 ET |
Download |
16-Jan-2013 ET |
2013 |
66 |
0 |
TG4k |
d3P802.15.4k Section 5.1.1.4.5 Comment Resolution |
Jussi Haapola (Centre for Wireless Communications) |
17-Jan-2013 12:41:07 ET |
Download |
16-Jan-2013 ET |
2013 |
67 |
0 |
TG4k |
Resolution for Sponsor Ballot Comments 100 and 102 |
Tuncer Baykas (Tohoku University) |
16-Jan-2013 16:21:38 ET |
Download |
16-Jan-2013 ET |
2013 |
46 |
2 |
TG8 |
TG procedure for PAC framework document |
Suhwook Kim (LG Electronics) |
16-Jan-2013 17:26:04 ET |
Download |
16-Jan-2013 ET |
2013 |
70 |
0 |
TG4m |
15.4m Coexistence Assurance Document |
Rolfe (BCA), Seibert (SSN), Soo-Young Chang (CSUS) |
16-Jan-2013 20:12:52 ET |
Download |
16-Jan-2013 ET |
2013 |
54 |
2 |
TG4n |
Proposal of Ranging Capabilities with PHY supporting CMB |
W.Kluge, D.Eggert(ATMEL), L.Li(Vinno) |
16-Jan-2013 18:05:40 ET |
Download |
16-Jan-2013 ET |
2013 |
71 |
0 |
TG4n |
closing-report-jan-2013 |
Arthur Astrin (Astrin Radio) |
17-Jan-2013 20:59:41 ET |
Download |
16-Jan-2013 ET |
2013 |
37 |
1 |
TG4n |
FSK PHY channelization and data rate proposal |
Andy Bottomley (Microsemi) |
16-Jan-2013 19:02:53 ET |
Download |
16-Jan-2013 ET |
2013 |
72 |
0 |
TG4m |
TG4m Revised Draft Comments |
Clint Powell / Chin-Sean Sum (PWC, LLC / NICT) |
17-Jan-2013 11:31:37 ET |
Download |
16-Jan-2013 ET |
2013 |
73 |
0 |
TG4n |
january-meeting-minutes |
Arthur Astrin (Astrin Radio) |
17-Jan-2013 19:43:03 ET |
Download |
17-Jan-2013 ET |
2013 |
45 |
1 |
TG8 |
Merged Comments to TGD |
Seung-Hoon Park (Samsung) |
17-Jan-2013 01:50:30 ET |
Download |
17-Jan-2013 ET |
2013 |
65 |
1 |
TG8 |
Issues of System-level Simulation |
Seung-Hoon Park (Samsung), Marco Hernandez (NICT), Sungrae Cho(Chung-Ang Univ.) |
17-Jan-2013 01:53:23 ET |
Download |
17-Jan-2013 ET |
2013 |
74 |
0 |
TG4q |
Applications for ULP Radios |
Rick Powell (Microsemi) |
17-Jan-2013 02:19:03 ET |
Download |
17-Jan-2013 ET |
2013 |
59 |
3 |
TG4q |
Considerations for parameters for ULP |
Kiran Bynam(Samsung) |
17-Jan-2013 10:32:15 ET |
Download |
17-Jan-2013 ET |
2013 |
65 |
2 |
TG8 |
Issues of System-level Simulation |
Seung-Hoon Park (Samsung), Marco Hernandez (NICT), Sungrae Cho(Chung-Ang Univ.) |
17-Jan-2013 11:01:34 ET |
Download |
17-Jan-2013 ET |
2013 |
75 |
0 |
TG8 |
ITU-R P.1411-6 Channel Model |
ITU-R |
17-Jan-2013 11:06:34 ET |
Download |
17-Jan-2013 ET |
2012 |
458 |
5 |
TG9 |
Moving-KMP-Forward |
Robert Moskowitz (Verizon) |
17-Jan-2013 12:19:44 ET |
Download |
17-Jan-2013 ET |
2013 |
65 |
3 |
TG8 |
Issues of System-level Simulation |
Seung-Hoon Park (Samsung), Marco Hernandez (NICT), Sungrae Cho(Chung-Ang Univ.) |
17-Jan-2013 13:14:30 ET |
Download |
17-Jan-2013 ET |
2013 |
80 |
0 |
TG8 |
System Level Simualtion |
Marco Hernandez (NICT), Seung-Hoon Park (Samsung) Sungrae Cho (Chung-Ang Univ.) |
17-Jan-2013 13:53:28 ET |
Download |
17-Jan-2013 ET |
2013 |
80 |
1 |
TG8 |
System Level Simualtion |
Marco Hernandez (NICT), Seung-Hoon Park (Samsung) Sungrae Cho (Chung-Ang Univ.) |
17-Jan-2013 14:05:38 ET |
Download |
17-Jan-2013 ET |
2013 |
81 |
0 |
TG4q |
Applications and Channels |
Jinesh Nair (Samsung) |
17-Jan-2013 14:47:00 ET |
Download |
17-Jan-2013 ET |
2012 |
568 |
2 |
TG8 |
TG8 Technical Guidance Document |
Seung-Hoon Park (Samsung) and Sunggeun Jin (ETRI) |
17-Jan-2013 14:59:46 ET |
Download |
17-Jan-2013 ET |
2012 |
568 |
3 |
TG8 |
TG8 Technical Guidance Document |
Seung-Hoon Park (Samsung) and Sunggeun Jin (ETRI) |
17-Jan-2013 15:07:27 ET |
Download |
17-Jan-2013 ET |
2012 |
116 |
9 |
TG9 |
P802.15.9-D001 |
Robert Moskowitz (Verizon) |
17-Jan-2013 15:07:46 ET |
Download |
17-Jan-2013 ET |
2012 |
568 |
4 |
TG8 |
TG8 Technical Guidance Document |
Seung-Hoon Park (Samsung) and Sunggeun Jin (ETRI) |
17-Jan-2013 15:31:51 ET |
Download |
17-Jan-2013 ET |
2013 |
84 |
0 |
SC MAINTENANCE |
Closing_Report_for_Standing_Committees_Jan_2013 |
Pat Kinney (Kinney Consulting) |
17-Jan-2013 19:48:22 ET |
Download |
17-Jan-2013 ET |
2013 |
85 |
0 |
TG8 |
Request of updating TG8 channel model |
Seung-Hoon Park (Samsung) |
17-Jan-2013 19:33:48 ET |
Download |
17-Jan-2013 ET |
2012 |
367 |
5 |
SC MAINTENANCE |
80215_Maintenance_Requests_and_Resolutions |
Pat Kinney (Kinney Consulting) |
17-Jan-2013 19:50:04 ET |
Download |
17-Jan-2013 ET |
2013 |
68 |
1 |
TG9 |
closing report Jan 2013 |
Peter Yee (NSA/IAD) |
17-Jan-2013 21:49:58 ET |
Download |
18-Jan-2013 ET |
2013 |
89 |
0 |
TG4p |
TG4p Overview for IEEE VTS RTSC |
Jon Adams (Lilee Systems) |
18-Jan-2013 12:27:56 ET |
Download |
21-Jan-2013 ET |
2012 |
459 |
4 |
TG8 |
TG8 channel models |
Marco Hernandez (NICT) |
21-Jan-2013 21:19:06 ET |
Download |
24-Jan-2013 ET |
2013 |
92 |
0 |
SC MAINTENANCE |
SCMan and SCWNG-minutes-from-Vancouver-Jan-13 |
Pat Kinney (Kinney Consulting) |
24-Jan-2013 10:13:57 ET |
Download |
24-Jan-2013 ET |
2012 |
564 |
2 |
TG4k |
Proposed Fragment Authentication |
Rolfe (BCA) et al |
24-Jan-2013 13:10:03 ET |
Download |
28-Jan-2013 ET |
2013 |
95 |
0 |
TG4k |
TRLE specification for the TG4k sponsor ballot draft |
Seong-Soon Joo (ETRI) |
30-Jan-2013 22:42:17 ET |
Download |
30-Jan-2013 ET |
2013 |
96 |
0 |
TG4k |
Modification of CSL Based on Sponsor Ballot Comments |
Yang Yang, Tao Xing(WSN, SIMIT) |
30-Jan-2013 23:00:55 ET |
Download |
30-Jan-2013 ET |
2013 |
97 |
0 |
TG4p |
Preliminary document for 4p |
Monique Brown (M.B. Brown Consulting) |
31-Jan-2013 20:35:16 ET |
Download |
30-Jan-2013 ET |
2013 |
98 |
0 |
TG4k |
modification-of-CSL-based on sponsor ballot comments |
Yang Yang, Tao Xing(WSN, SIMIT) |
30-Jan-2013 23:54:44 ET |
Download |
31-Jan-2013 ET |
2013 |
99 |
0 |
TG8 |
Comments to System-Level Simulation of TGD |
Seung-Hoon Park (Samsung) |
31-Jan-2013 20:04:04 ET |
Download |
04-Feb-2013 ET |
2013 |
100 |
0 |
TG8 |
Comments and resolutions to TGD |
Marco Hernandez (NICT) |
04-Feb-2013 06:07:59 ET |
Download |
04-Feb-2013 ET |
2013 |
101 |
0 |
TG8 |
Comments and resolutions for document 13-99 |
Marco Hernandez (NICT) |
04-Feb-2013 06:12:08 ET |
Download |
05-Feb-2013 ET |
2013 |
102 |
0 |
TG8 |
Comments on TGD |
Jinyoung Chun(LG Electronics) |
05-Feb-2013 02:44:13 ET |
Download |
06-Feb-2013 ET |
2013 |
95 |
1 |
TG4k |
TRLE specification for the TG4k sponsor ballot draft |
Seong-Soon Joo (ETRI) |
06-Feb-2013 12:34:35 ET |
Download |
18-Feb-2013 ET |
2013 |
103 |
0 |
TG4j |
Mar 2013 Agenda |
Ray Krasinski (Philips) |
18-Feb-2013 13:44:20 ET |
Download |
18-Feb-2013 ET |
2013 |
99 |
1 |
TG8 |
Comments to System-Level Simulation of TGD |
Seung-Hoon Park (Samsung) |
18-Feb-2013 19:26:59 ET |
Download |
28-Feb-2013 ET |
2013 |
97 |
1 |
TG4p |
Preliminary document for 4p |
Monique Brown (M.B. Brown Consulting) |
28-Feb-2013 23:58:07 ET |
Download |
04-Mar-2013 ET |
2013 |
104 |
0 |
IG LED |
VLC System Deployment Discussion |
Richard Roberts (Intel Labs) |
04-Mar-2013 17:35:52 ET |
Download |
04-Mar-2013 ET |
2013 |
105 |
0 |
SGsru |
IG SRU March 2013 Agenda |
Shoichi Kitazawa (ATR) |
06-Mar-2013 05:42:10 ET |
Download |
05-Mar-2013 ET |
2013 |
107 |
0 |
TG4m |
TG4m LB87 Comment Spreadsheet |
Chin-Sean Sum / Clint Powell (NICT / PWC, LLC) |
07-Mar-2013 01:16:01 ET |
Download |
06-Mar-2013 ET |
2013 |
109 |
0 |
TG4k |
Proposed Resolutions of Sponsor Ballot Comments about CSL Parts |
Yang Yang, Tao Xing, Jie Shen(WSN, ECNU) |
06-Mar-2013 05:48:19 ET |
Download |
06-Mar-2013 ET |
2013 |
110 |
0 |
TG4k |
Proposed resolutions for Recirc Comments |
B. Rolfe (BCA) |
06-Mar-2013 12:42:04 ET |
Download |
06-Mar-2013 ET |
2011 |
821 |
10 |
SG PTC |
802-15-PTC-PAR |
Jon Adams (Lilee Systems) |
06-Mar-2013 13:36:17 ET |
Download |
06-Mar-2013 ET |
2013 |
111 |
0 |
SG L2R |
SG L2R March 2013 Agenda |
Clint Powell (PWC, LLC) |
06-Mar-2013 14:10:11 ET |
Download |
06-Mar-2013 ET |
2013 |
112 |
0 |
TG4k |
Resolution for Preamble Related Comment |
Tuncer Baykas (Tohoku University) |
06-Mar-2013 21:12:48 ET |
Download |
06-Mar-2013 ET |
2013 |
113 |
0 |
TG4n |
March 2013 agenda |
Arthur Astrin (Astrin Radio) |
06-Mar-2013 21:45:55 ET |
Download |
07-Mar-2013 ET |
2013 |
114 |
0 |
WG15 |
March 2013 802-15 WG Agenda Graphic |
Bob Heile, ZigBee Alliance |
07-Mar-2013 09:22:55 ET |
Download |
07-Mar-2013 ET |
2013 |
115 |
0 |
TG8 |
TG8-PAC-agenda-Orlando-March2013 |
Myung Lee, CUNY |
07-Mar-2013 10:44:12 ET |
Download |
07-Mar-2013 ET |
2013 |
116 |
0 |
TG4k |
TG4k-agenda-Orlando-2013 |
Pat Kinney (Kinney Consulting) |
07-Mar-2013 14:56:38 ET |
Download |
07-Mar-2013 ET |
2013 |
117 |
0 |
SC MAINTENANCE |
agenda-Mar-2013-wng&maintenance-mtg |
Pat Kinney (Kinney Consulting) |
07-Mar-2013 15:23:42 ET |
Download |
08-Mar-2013 ET |
2013 |
118 |
0 |
SC THZ |
IG THz Orlando 2013 Agenda |
Thomas Kurner (TU Braunschweig) |
08-Mar-2013 09:20:45 ET |
Download |
10-Mar-2013 ET |
2013 |
120 |
0 |
TG4m |
TG4m-Agenda-Orlando-2013 |
Sangsung Choi(ETRI) |
10-Mar-2013 20:25:03 ET |
Download |
11-Mar-2013 ET |
2013 |
107 |
1 |
TG4m |
TG4m LB87 Comment Spreadsheet |
Chin-Sean Sum / Clint Powell (NICT / PWC, LLC) |
11-Mar-2013 22:50:06 ET |
Download |
12-Mar-2013 ET |
2013 |
123 |
0 |
TG4q |
March 2013 ULP agenda |
shahriar emami (samsung) |
12-Mar-2013 14:30:59 ET |
Download |
13-Mar-2013 ET |
2013 |
124 |
0 |
TG8 |
Discussion and Conclusion of Conference Call on February19 |
Huan-Bang Li (NICT), Seung-Hoon Park (Samsung),Zeria Eldad (Inter Digital), Jinyoung Chun (LGE), Igor Dotlic (NICT), Suhwook Kim (LGE) |
13-Mar-2013 04:40:37 ET |
Download |
13-Mar-2013 ET |
2013 |
125 |
0 |
TG4q |
Large-Volume ULP Applications |
Ed Callaway (Sunrise Micro Devices) |
19-Mar-2013 08:45:14 ET |
Download |
14-Mar-2013 ET |
2013 |
126 |
0 |
TG4p |
Update for Joint Council on Transit Wireless Communications |
Jon Adams (Lilee Systems) |
14-Mar-2013 02:13:28 ET |
Download |
14-Mar-2013 ET |
2013 |
127 |
0 |
TG8 |
Differential detection of IR-UWB PPM symbols |
Dotlic, Li, Hernandez, Miura (NICT) |
14-Mar-2013 04:14:50 ET |
Download |
14-Mar-2013 ET |
2013 |
118 |
1 |
SC THZ |
IG THz Orlando 2013 Agenda |
Thomas Kurner (TU Braunschweig) |
14-Mar-2013 11:44:56 ET |
Download |
14-Mar-2013 ET |
2013 |
117 |
1 |
SC MAINTENANCE |
agenda-Mar-2013-wng&maintenance-mtg |
Pat Kinney (Kinney Consulting) |
14-Mar-2013 20:45:46 ET |
Download |
15-Mar-2013 ET |
2013 |
128 |
0 |
TG8 |
Analysis of synchronization under PAC situation |
Jinyoung Chun (LG Electronics) |
17-Mar-2013 22:40:30 ET |
Download |
15-Mar-2013 ET |
2013 |
130 |
0 |
SC THZ |
Launching a Study Group on THz |
Thomas Kurner (TU Braunschweig) |
19-Mar-2013 11:27:40 ET |
Download |
15-Mar-2013 ET |
2013 |
118 |
2 |
SC THZ |
IG THz Orlando 2013 Agenda |
Thomas Kurner (TU Braunschweig) |
15-Mar-2013 08:28:08 ET |
Download |