eTools
29-Apr-2024 07:10:58 ET
Documents
Created (ET) Year DCN Rev Group Title Author (Affiliation) Uploaded (ET) Actions
06-Nov-2005 ET
2005 1074 0 TGv Bc And Mc Enhancements Jari Jokela (Nokia)
06-Nov-2005 00:00:00 ET
Download
06-Nov-2005 ET
2005 1070 1 TGv Normative Text Proposal Diagnostics And Troubleshooting Tim Olson (Cisco Systems)
06-Nov-2005 00:00:00 ET
Download
06-Nov-2005 ET
2005 1070 0 TGv Normative Text Proposal Diagnostics And Troubleshooting Tim Olson (Cisco Systems)
06-Nov-2005 00:00:00 ET
Download
07-Nov-2005 ET
2005 1087 0 TGv Proposal Virtual Ap Joe Epstein (Meru Networks)
07-Nov-2005 00:00:00 ET
Download
07-Nov-2005 ET
2005 1086 0 TGv Virtual Ap Joe Epstein (Meru Networks)
07-Nov-2005 00:00:00 ET
Download
07-Nov-2005 ET
2005 1085 0 TGv Managed Bss Channel Switch Joe Kwak, Marian Rudolf (InterDigital)
07-Nov-2005 00:00:00 ET
Download
07-Nov-2005 ET
2005 1084 0 TGv Normative Text Bss Channel Switch Marian Rudolf, Joe Kwak (InterDigital)
07-Nov-2005 00:00:00 ET
Download
07-Nov-2005 ET
2005 1083 0 TGv Client Management Protocol Normative Text Tim Olson (Cisco Systems)
07-Nov-2005 00:00:00 ET
Download
07-Nov-2005 ET
2005 1071 0 TGv Solve Frequent Handover Requirement Bin Wang (ZTE)
07-Nov-2005 00:00:00 ET
Download
07-Nov-2005 ET
2005 927 2 TGv Client Management Protocol Details Tim Olson (Cisco Systems)
07-Nov-2005 00:00:00 ET
Download
09-Nov-2005 ET
2005 1071 1 TGv Solve Frequent Handover Requirement Bin Wang (ZTE)
09-Nov-2005 00:00:00 ET
Download
09-Nov-2005 ET
2005 629 1 TGv Bss Load Balancing Requirements Bin Wang (ZTE)
09-Nov-2005 00:00:00 ET
Download
10-Nov-2005 ET
2005 629 2 TGv Bss Load Balancing Requirements Bin Wang (ZTE)
10-Nov-2005 00:00:00 ET
Download
11-Nov-2005 ET
2005 1117 0 TGv Fault Tolerance Wlan Factory Network Takashi Sakakura (Mitsubishi)
11-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1126 0 TGv Distributedloadbalancing Floyd Backes (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1125 0 TGv Channelselection Floyd Backes (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1115 0 TGv Interfernce Detection Signature Mapping Roger Dunard (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1114 0 TGv Dynamic Multi Level Rf Power Roger Dunard (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1069 1 TGv Load Balancing Roger Durand (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1068 1 TGv Multilevelrfpower Roger Durand (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1067 1 TGv Interferencedetection Roger Durand (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
12-Nov-2005 ET
2005 1066 1 TGv Channelselection Roger Durand (AutoCell Labs)
12-Nov-2005 00:00:00 ET
Download
13-Nov-2005 ET
2005 1115 1 TGv Interfernce Detection Signature Mapping Roger Dunard (AutoCell Labs)
13-Nov-2005 00:00:00 ET
Download
14-Nov-2005 ET
2005 1139 0 TGv Meeting Report November 2005 Pat Calhoun (Cisco Systems)
14-Nov-2005 00:00:00 ET
Download
14-Nov-2005 ET
2005 1120 0 TGv Virtual Ap Proposal Partha Narasimhan (Aruba Networks)
14-Nov-2005 00:00:00 ET
Download
15-Nov-2005 ET
2005 1139 1 TGv Meeting Report November 2005 Pat Calhoun (Cisco Systems)
15-Nov-2005 00:00:00 ET
Download
15-Nov-2005 ET
2005 1124 0 TGv Proposal Diagnostics And Troubleshooting Tim Olson (Cisco Systems)
15-Nov-2005 00:00:00 ET
Download
15-Nov-2005 ET
2005 1085 1 TGv Managed Bss Channel Switch Joe Kwak, Marian Rudolf (InterDigital)
15-Nov-2005 00:00:00 ET
Download
15-Nov-2005 ET
2005 1079 1 TGv Key Issues About Wifi Location Presentation Stuart Golden (Intel Corporation)
15-Nov-2005 00:00:00 ET
Download
15-Nov-2005 ET
2005 1075 1 TGv Bc And Mc Enhancements Presentation Jari Jokela (Nokia)
15-Nov-2005 00:00:00 ET
Download
15-Nov-2005 ET
2005 1073 1 TGv Advanced Power Introduction Jarkko Kneckt (Nokia)
15-Nov-2005 00:00:00 ET
Download
16-Nov-2005 ET
2005 1188 0 TGv Minutes Ad Hoc Session Tgv Vancouver Meeting 14nov 05 R. R. Miller (AT&T)
16-Nov-2005 00:00:00 ET
Download
16-Nov-2005 ET
2005 1171 0 TGv Minutes Tgv Vancouver Meeting Nov 05 R. R. Miller (AT&T)
16-Nov-2005 00:00:00 ET
Download
16-Nov-2005 ET
2005 1120 1 TGv Virtual Ap Proposal Partha Narasimhan (Aruba Networks)
16-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 1219 0 TGv Virtual Ap Presentation Partha Narasimhan (Aruba Networks)
17-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 1171 1 TGv Minutes Tgv Vancouver Meeting Nov 05 R. R. Miller (AT&T)
17-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 1139 3 TGv Meeting Report November 2005 Pat Calhoun (Cisco Systems)
17-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 1139 2 TGv Meeting Report November 2005 Pat Calhoun (Cisco Systems)
17-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 1071 3 TGv Solve Frequent Handover Requirement Bin Wang (ZTE)
17-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 918 3 TGv Proposed Tgv Selection Process Emily Qi (Intel Corporation)
17-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 630 2 TGv Adaptive Rate Control Requirements Feng Li (ZTE)
17-Nov-2005 00:00:00 ET
Download
17-Nov-2005 ET
2005 630 1 TGv Adaptive Rate Control Requirements Feng Li (ZTE)
17-Nov-2005 00:00:00 ET
Download
18-Nov-2005 ET
2005 1139 5 TGv Meeting Report November 2005 Pat Calhoun (Cisco Systems)
18-Nov-2005 00:00:00 ET
Download
18-Nov-2005 ET
2005 1139 4 TGv Meeting Report November 2005 Pat Calhoun (Cisco Systems)
18-Nov-2005 00:00:00 ET
Download
09-Jan-2006 ET
2006 1280 0 TGv Frequent Handover Bin Wang (ZTE)
09-Jan-2006 00:00:00 ET
Download
09-Jan-2006 ET
2006 1279 0 TGv Frequent Handover Normative Text Bin Wang, Feng Li (ZTE)
09-Jan-2006 00:00:00 ET
Download
09-Jan-2006 ET
2006 2 0 TGv Load Balancing Normative Text Wang Bin, Li Feng, Li Jie (ZTE)
09-Jan-2006 00:00:00 ET
Download
09-Jan-2006 ET
2006 1 0 TGv Load Balancing Bin Wang, Feng Li, Jie Li (ZTE)
09-Jan-2006 00:00:00 ET
Download
10-Jan-2006 ET
2006 1279 1 TGv Frequent Handover Normative Text Bin Wang, Feng Li (ZTE)
10-Jan-2006 00:00:00 ET
Download
10-Jan-2006 ET
2005 827 4 TGv Tgv Objectives Emily Qi (Intel Corporation)
10-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2006 1286 0 TGv Adaptive Rate Control Feng Li, Bin Wang, Jie Li (ZTE), Emily H. Qi (Intel)
12-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2006 34 0 TGv Meeting Report January 2005 Pat Calhoun (Cisco Systems)
12-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2006 32 0 TGv Ap Neighbor Learning Partha Narasimhan (Aruba Networks)
12-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2006 10 0 TGv Location Presentation Richard Barnwell (Pango Networks)
12-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2006 9 0 TGv Location Proposal Richard Barnwell (Pango Networks)
12-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2005 1070 2 TGv Normative Text Proposal Diagnostics And Troubleshooting Tim Olson (Cisco Systems)
12-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2005 1065 1 TGv Proposal Load Balancing Emily Qi (Intel Corporation)
12-Jan-2006 00:00:00 ET
Download
12-Jan-2006 ET
2005 1064 1 TGv Normative Text Proposal Load Balancing Emily Qi (Intel Corporation)
12-Jan-2006 00:00:00 ET
Download
13-Jan-2006 ET
2006 40 0 TGv Meeting Report January 2006 Pat Calhoun (Cisco Systems)
13-Jan-2006 00:00:00 ET
Download
13-Jan-2006 ET
2006 36 0 TGv Reliable Multicast Sudheer Matta (Trapeze Networks)
13-Jan-2006 00:00:00 ET
Download
13-Jan-2006 ET
2005 1219 1 TGv Virtual Ap Presentation Partha Narasimhan (Aruba Networks)
13-Jan-2006 00:00:00 ET
Download
13-Jan-2006 ET
2005 1120 2 TGv Virtual Ap Proposal Sudheer Matta (Trapeze Networks)
13-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2006 1287 2 TGv Proposal Adaptive Rate Control Feng Li (ZTE)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2006 1287 0 TGv Proposal Adaptive Rate Control Feng Li (ZTE)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2006 1286 1 TGv Adaptive Rate Control Feng Li, Bin Wang, Jie Li (ZTE), Emily H. Qi (Intel), Tim Olson (Cisco)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2006 40 1 TGv Meeting Report January 2006 Pat Calhoun (Cisco Systems)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1263 2 TGv Novel Idle Mode Operation In Ieee802 11 Wlans Sunggeun Jin (Seoul National University)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1263 1 TGv Novel Idle Mode Operation In Ieee802 11 Wlans Sunggeun Jin (Seoul National University)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1219 3 TGv Virtual Ap Presentation Partha Narasimhan (Aruba Networks)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1219 2 TGv Virtual Ap Presentation Partha Narasimhan (Aruba Networks)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1124 1 TGv Proposal Diagnostics And Troubleshooting Tim Olson (Cisco Systems)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1120 3 TGv Virtual Ap Proposal Thomas Kuehnel (Microsoft)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1072 1 TGv Advanced Powersave Jarkko Kneckt (Nokia)
17-Jan-2006 00:00:00 ET
Download
17-Jan-2006 ET
2005 1070 3 TGv Normative Text Proposal Diagnostics And Troubleshooting Tim Olson (Cisco Systems)
17-Jan-2006 00:00:00 ET
Download
18-Jan-2006 ET
2006 167 0 TGv Normative Text Proposal Tgv Framework Simon Black (Nokia)
18-Jan-2006 00:00:00 ET
Download
18-Jan-2006 ET
2006 89 0 TGv Minutes Tgv Waikoloa Meeting Jan 06 Doc R. R. Miller (AT&T)
18-Jan-2006 00:00:00 ET
Download
18-Jan-2006 ET
2006 40 2 TGv Meeting Report January 2006 Pat Calhoun (Cisco Systems)
18-Jan-2006 00:00:00 ET
Download
18-Jan-2006 ET
2005 1263 3 TGv Novel Idle Mode Operation In Ieee802 11 Wlans Sunggeun Jin (Seoul National University)
18-Jan-2006 00:00:00 ET
Download
18-Jan-2006 ET
2005 1085 3 TGv Managed Bss Channel Switch Joe Kwak, Marian Rudolf (InterDigital)
18-Jan-2006 00:00:00 ET
Download
18-Jan-2006 ET
2005 1085 2 TGv Managed Bss Channel Switch Joe Kwak, Marian Rudolf (InterDigital)
18-Jan-2006 00:00:00 ET
Download
19-Jan-2006 ET
2006 25 1 TGv Simulation Adaptive Rate Control Feng Li, Bin Wang, Jie Li (ZTE Corporation)
19-Jan-2006 00:00:00 ET
Download
19-Jan-2006 ET
2006 25 0 TGv Simulation Adaptive Rate Control Feng Li, Bin Wang, Jie Li (ZTE Corporation)
19-Jan-2006 00:00:00 ET
Download
19-Jan-2006 ET
2006 9 1 TGv Location Proposal Richard Barnwell (Pango Networks)
19-Jan-2006 00:00:00 ET
Download
20-Jan-2006 ET
2006 89 1 TGv Minutes Tgv Waikoloa Meeting Jan 06 Doc R. R. Miller (AT&T)
20-Jan-2006 00:00:00 ET
Download
20-Jan-2006 ET
2006 40 4 TGv Meeting Report January 2006 Pat R. Calhoun (Cisco Systems, Inc.)
20-Jan-2006 00:00:00 ET
Download
20-Jan-2006 ET
2006 40 3 TGv Meeting Report January 2006 Pat Calhoun (Cisco Systems)
20-Jan-2006 00:00:00 ET
Download
15-Feb-2006 ET
2005 827 5 TGv Tgv Objectives Emily Qi (Intel Corporation)
15-Feb-2006 00:00:00 ET
Download
02-Mar-2006 ET
2006 361 1 TGv Adaptive Rate Control Nav Setting Feng Li, Bin Wang, Jie Li (ZTE), Cheng Qiang
(CATR)
02-Mar-2006 00:00:00 ET
Download
02-Mar-2006 ET
2006 361 0 TGv Adaptive Rate Control Nav Setting Feng Li, Bin Wang, Jie Li (ZTE), Cheng Qiang
(CATR)
02-Mar-2006 00:00:00 ET
Download
02-Mar-2006 ET
2006 342 0 TGv Normative Text Proposal Setting And Resetting Nav Adaptive Rate Control Feng Li (ZTE)
02-Mar-2006 00:00:00 ET
Download
03-Mar-2006 ET
2006 370 0 TGv Bc And Mc Enhancements Presentation Jari Jokela (Nokia)
03-Mar-2006 00:00:00 ET
Download
03-Mar-2006 ET
2006 369 0 TGv Bc And Mc Enhancements Jari Jokela (Nokia)
03-Mar-2006 00:00:00 ET
Download
04-Mar-2006 ET
2006 363 0 TGv Standby Time Improvements Arnaud Meylan, Sanjiv Nanda (Qualcomm)
04-Mar-2006 00:00:00 ET
Download
04-Mar-2006 ET
2006 346 0 TGv Normative Text Proposal Event Log Tim Olson (Cisco Systems)
04-Mar-2006 00:00:00 ET
Download
04-Mar-2006 ET
2005 1064 2 TGv Normative Text Proposal Load Balancing Emily Qi (Intel Corporation)
04-Mar-2006 00:00:00 ET
Download
06-Mar-2006 ET
2006 428 0 TGv Normative Text Proposal Diagnostic Alerts Tim Olson (Cisco Systems)
06-Mar-2006 00:00:00 ET
Download
06-Mar-2006 ET
2006 422 0 TGv Meeting Report March 2006 Pat Calhoun (Cisco Systems)
06-Mar-2006 00:00:00 ET
Download
06-Mar-2006 ET
2006 386 0 TGv Need To Specify Algorithms Channel Selection And Load Balancing Floyd Backes (AutoCell), Mike Montemerro (Siemens)
06-Mar-2006 00:00:00 ET
Download
06-Mar-2006 ET
2006 89 3 TGv Minutes Tgv Waikoloa Meeting Jan 06 Doc R. R. Miller (AT&T)
06-Mar-2006 00:00:00 ET
Download
06-Mar-2006 ET
2006 89 2 TGv Minutes Tgv Waikoloa Meeting Jan 06 Doc RR Miller (AT&T)
06-Mar-2006 00:00:00 ET
Download