Created (ET) |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) ▼ |
Actions |
16-Jul-2007 ET |
2002 |
634 |
0 |
TGe |
Simultaneous Registration of 802.11 and Mobile IP v4 |
Subrata Goswami, Ph.D., Independent Consultant |
28-Sep-2002 16:19:06 ET |
Download |
16-Jul-2007 ET |
2002 |
515 |
7 |
TGh |
Comments from LB42 |
Mika Kasslin, Nokia |
27-Sep-2002 10:23:16 ET |
Download |
16-Jul-2007 ET |
2002 |
633 |
0 |
RRM |
RRM Agenda for September 25, 2002 Teleconference |
Richard Paine, Boeing |
25-Sep-2002 16:27:48 ET |
Download |
16-Jul-2007 ET |
2002 |
602 |
0 |
RRM |
Wherefore art thou, Control |
Darwin Edger, Richard Paine |
25-Sep-2002 16:27:26 ET |
Download |
16-Jul-2007 ET |
2002 |
520 |
0 |
RRM |
Radio_Resource_Measurement_RSSI_9-3-02 |
Richard Paine, Boeing |
25-Sep-2002 16:27:24 ET |
Download |
16-Jul-2007 ET |
2002 |
631 |
0 |
TGe |
TGe Closing Report - Monterey 091302 |
John Fakatselis, Intersil |
24-Sep-2002 09:55:08 ET |
Download |
16-Jul-2007 ET |
2002 |
552 |
0 |
TGe |
Minutes of TGe - September 2002 |
Tim Godfrey (Intersil) |
24-Sep-2002 09:44:10 ET |
Download |
16-Jul-2007 ET |
2002 |
550 |
0 |
802.11 WG |
Minutes for Working Group - Monterey, September 2002 |
Tim Godfrey (Intersil) |
24-Sep-2002 09:44:08 ET |
Download |
16-Jul-2007 ET |
2002 |
630 |
0 |
RRM |
Overview-of-Cisco-Per-Client-Extensions-to-802.11-MIB |
Daryl Kaiser (Cisco Systems) |
24-Sep-2002 08:26:46 ET |
Download |
16-Jul-2007 ET |
2002 |
632 |
0 |
RRM |
Minutes for Radio Resource Measurement Study Group for the September 2002 Interium Session |
H. Worstell, AT&T, Simon Barber, Instant802 Networks, Richard Paine, Boeing |
24-Sep-2002 00:04:18 ET |
Download |
16-Jul-2007 ET |
2002 |
606 |
0 |
WIG |
WIG Monterey Minutes |
Garth Hillman (AMD) |
23-Sep-2002 15:33:34 ET |
Download |
16-Jul-2007 ET |
2002 |
605 |
0 |
WNG SC |
Wng Monterey Minutes |
Garth Hillman (AMD) |
23-Sep-2002 15:33:22 ET |
Download |
16-Jul-2007 ET |
2002 |
620 |
1 |
TGe |
Should Parameterized QoS be Optional |
Matthew Sherman, AT&T |
23-Sep-2002 14:16:10 ET |
Download |
16-Jul-2007 ET |
2002 |
629 |
0 |
TGi |
TGi Monterey Interim Meeting Minutes - September 2002 |
Frank Ciotti, LinCom Wireless |
19-Sep-2002 22:10:30 ET |
Download |
16-Jul-2007 ET |
2002 |
595 |
0 |
802.11 WG |
TGe Closing Report for September 2002 |
John Fakatselis, Intersil |
19-Sep-2002 22:10:00 ET |
Download |
16-Jul-2007 ET |
2002 |
529 |
0 |
TGg |
Use of Asymmetrical Advance Coding for 802.11g |
Juan Alberto Torres, Victor Demjanenko, Jeff Paul (VOCAL Technologies, Ltd. |
19-Sep-2002 13:06:30 ET |
Download |
16-Jul-2007 ET |
2002 |
484 |
0 |
TGi |
TGi Vancouver Plenary Meeting Minutes - July 2002 |
Frank Ciotti LinCom Wireless |
19-Sep-2002 09:44:56 ET |
Download |
16-Jul-2007 ET |
2002 |
574 |
0 |
WNG SC |
Ad-Hoc Multiple Antenna Channel Modeling Group |
Vinko Erceg (Zyray Wireless) et. al. |
19-Sep-2002 09:39:28 ET |
Download |
16-Jul-2007 ET |
2002 |
607 |
0 |
HT SG |
HT-HG Monterey Minutes |
Garth Hillman (AMD) |
19-Sep-2002 09:33:24 ET |
Download |
16-Jul-2007 ET |
2002 |
627 |
1 |
802.11 WG |
Liasion with CableLabs September 2002 Session Update |
Lior Ophir (Texas Instruments Inc) |
18-Sep-2002 21:52:14 ET |
Download |
16-Jul-2007 ET |
2002 |
627 |
0 |
802.11 WG |
Liasion with CableLabs September 2002 Session Update |
Lior Ophir (Texas Instruments Inc) |
18-Sep-2002 21:51:32 ET |
Download |
16-Jul-2007 ET |
2002 |
626 |
0 |
802.11 WG |
802-16 Liaison Report September 2002 |
Mika Kasslin, Nokia |
18-Sep-2002 21:44:26 ET |
Download |
16-Jul-2007 ET |
2002 |
625 |
1 |
TGe |
Fast Track Proposed Draft Normative Texr Changes |
Amjad Soomro, Philips, et.al. |
18-Sep-2002 21:40:54 ET |
Download |
16-Jul-2007 ET |
2002 |
624 |
0 |
802.11 WG |
TGh Closing Report for the Septeber 2002 Session |
Mika Kasslin, Nokia |
18-Sep-2002 21:36:28 ET |
Download |
16-Jul-2007 ET |
2002 |
623 |
0 |
TGh |
Forward Compatibility Hooks for 802-11h Part2 |
Lior Ophir (Texas Instruments Inc) |
18-Sep-2002 21:32:38 ET |
Download |
16-Jul-2007 ET |
2002 |
622 |
0 |
TGe |
WME Fast Track Differences |
Adrian Stephens (Intel) |
18-Sep-2002 21:31:50 ET |
Download |
16-Jul-2007 ET |
2002 |
621 |
0 |
TGh |
Forward Compatibility Hooks for 802-11h |
Lior Ophir (Texas Instruments Inc) |
18-Sep-2002 21:24:24 ET |
Download |
16-Jul-2007 ET |
2002 |
620 |
0 |
TGe |
Should Parameterized QoS be Optional |
Matthew Sherman, AT&T |
18-Sep-2002 21:22:16 ET |
Download |
16-Jul-2007 ET |
2002 |
619 |
0 |
802.11 WG |
September 2002 WECA Liasion Report |
Sheung LI, Bill Carney |
18-Sep-2002 21:14:42 ET |
Download |
16-Jul-2007 ET |
2002 |
618 |
0 |
RRM |
RRM Requirements Discussion on CCA |
Bobby Jose |
18-Sep-2002 20:45:14 ET |
Download |
16-Jul-2007 ET |
2002 |
547 |
1 |
TGi |
validating disassociate deauth messages |
Tim Moore (Microsoft) |
15-Sep-2002 23:58:20 ET |
Download |
16-Jul-2007 ET |
2002 |
617 |
0 |
802.11 WG |
September 2002 IEEE P1394.1 Liaison Report |
Peter Johansson, Congruent Software, Inc. |
15-Sep-2002 22:42:36 ET |
Download |
16-Jul-2007 ET |
2002 |
616 |
0 |
802.11 WG |
Liaison Report JEDEC JC-61 |
Benno Ritter, Philips |
15-Sep-2002 22:41:40 ET |
Download |
16-Jul-2007 ET |
2002 |
615 |
0 |
802.11 WG |
IEEE 802.11 TGg Closing Report |
Matthew Shoemake (Texas Instruments) |
15-Sep-2002 22:36:20 ET |
Download |
16-Jul-2007 ET |
2002 |
614 |
0 |
TGg |
Fixing the locked legacy slot condition |
Matthew Fischer, Broadcom |
15-Sep-2002 22:31:48 ET |
Download |
16-Jul-2007 ET |
2002 |
613 |
0 |
TGg |
Dynamic BSS Condition |
Matthewr Fischer, Broadcom |
15-Sep-2002 22:29:26 ET |
Download |
16-Jul-2007 ET |
2002 |
612 |
0 |
TGe |
Normative-Text-For-Tge-Consensus-Proposal |
Srinivas Kandala, Sharp, et.al |
15-Sep-2002 22:24:38 ET |
Download |
16-Jul-2007 ET |
2002 |
566 |
0 |
TGi |
Joint TGe and TGi Issues |
TGi Participants (TGi) |
15-Sep-2002 22:17:14 ET |
Download |
16-Jul-2007 ET |
2002 |
610 |
0 |
802.11 WG |
TGi Final Report for September 2002 Session |
David Halasz, Cisco |
15-Sep-2002 22:13:50 ET |
Download |
16-Jul-2007 ET |
2002 |
583 |
1 |
TGF |
TGF mtg report for Sept 2002 |
David Bagby (Self) |
15-Sep-2002 22:05:14 ET |
Download |
16-Jul-2007 ET |
2002 |
567 |
0 |
HT SG |
HTSG Requirements - Scope and Purpose |
Chris Ware (Motorola), Sebastien Simoens (Motorola), Amitava Ghosh (Motorola), Karine Gosse (Motorola)) |
15-Sep-2002 22:04:30 ET |
Download |
16-Jul-2007 ET |
2002 |
554 |
0 |
802.11 WG |
Publicity Committee Report |
Brian Mathews (AbsoluteValue Systems) |
15-Sep-2002 22:01:08 ET |
Download |
16-Jul-2007 ET |
2002 |
560 |
3 |
WNG SC |
WNG Closing Report |
TK Tan (Philips) |
15-Sep-2002 22:00:42 ET |
Download |
16-Jul-2007 ET |
2002 |
438 |
4 |
TGe |
Direct Link Protocol |
S. Kandala, Sharp Labs |
15-Sep-2002 21:56:06 ET |
Download |
16-Jul-2007 ET |
2002 |
564 |
1 |
WNG SC |
Draft Project Authorization Request (PAR) 4.9 GHz - 5GHz Operation in Japan |
Peter Ecclesine (Cisco Systems) |
13-Sep-2002 13:26:34 ET |
Download |
16-Jul-2007 ET |
2002 |
543 |
0 |
TGg |
September 2002 Monterey Interim TGg Meeting Minutes |
Kevin Smart (Micro Linear Corporation) |
13-Sep-2002 12:35:56 ET |
Download |
16-Jul-2007 ET |
2002 |
609 |
0 |
802.11 WG |
Liasion Report for 802.15 for closing Plenary Sept 2002 |
Mike Seals, Intersil |
13-Sep-2002 11:00:02 ET |
Download |
16-Jul-2007 ET |
2002 |
532 |
0 |
HT SG |
HT SG Meeting Agenda and Report |
Jon Rosdahl (Micro Linear) |
13-Sep-2002 10:55:06 ET |
Download |
16-Jul-2007 ET |
2002 |
535 |
14 |
TGg |
Letter Ballot 41 Comment Resolution |
Matthew B. Shoemake (TGg Chair) |
13-Sep-2002 10:37:42 ET |
Download |
16-Jul-2007 ET |
2002 |
486 |
3 |
802.11 WG |
IEEE 802-11 Standard Roll-up Report |
Terry Cole, AMD |
12-Sep-2002 23:49:00 ET |
Download |
16-Jul-2007 ET |
2002 |
604 |
0 |
TGe |
Normative text for TGe Consensus Proposal |
Shrini Kandella, Sharp et al |
12-Sep-2002 20:08:46 ET |
Download |
16-Jul-2007 ET |
2002 |
582 |
1 |
802.11 WG |
Coexistence Beacon Element |
Chris Zegelin (Symbol), Graham Melville (Symbol), Bob Neilsen (Symbol) |
12-Sep-2002 20:02:36 ET |
Download |
16-Jul-2007 ET |
2002 |
562 |
2 |
TGe |
Automatic Power Save Delivery for QoS |
Keith Amann (SpectraLink), Robert Meier (Cisco Systems) |
12-Sep-2002 19:05:30 ET |
Download |
16-Jul-2007 ET |
2002 |
604 |
1 |
TGe |
Normative text for TGe Consensus Proposal |
Shrini Kandella, Sharp et al |
12-Sep-2002 18:53:50 ET |
Download |
16-Jul-2007 ET |
2002 |
589 |
1 |
TGg |
Suggested CCA Text for TGg |
Dick Allen (Apple) |
12-Sep-2002 18:16:00 ET |
Download |
16-Jul-2007 ET |
2002 |
524 |
3 |
TGe |
TGe Fast-Track Consensus Proposal Presentation |
Benno Ritter, Matthew Shoemake, Keith Amann, Matthew Sherman, Rolf de Vegt et. al |
12-Sep-2002 17:58:34 ET |
Download |
16-Jul-2007 ET |
2002 |
546 |
0 |
TGh |
Minutes of TGh meeting, September 2002 |
Evan Green (Intel) |
12-Sep-2002 17:58:28 ET |
Download |
16-Jul-2007 ET |
2002 |
524 |
2 |
TGe |
TGe Fast-Track Consensus Proposal Presentation |
Benno Ritter, Matthew Shoemake, Keith Amann, Matthew Sherman, Rolf de Vegt et. al |
12-Sep-2002 17:55:58 ET |
Download |
16-Jul-2007 ET |
2002 |
515 |
6 |
TGh |
Comments from LB42 |
Mika Kasslin, Nokia |
12-Sep-2002 17:45:30 ET |
Download |
16-Jul-2007 ET |
2002 |
535 |
13 |
TGg |
Letter Ballot 41 Comment Resolution |
Matthew B. Shoemake (TGg Chair) |
12-Sep-2002 17:39:22 ET |
Download |
16-Jul-2007 ET |
2002 |
535 |
12 |
TGg |
Letter Ballot 41 Comment Resolution |
Matthew B. Shoemake (TGg Chair) |
12-Sep-2002 16:51:06 ET |
Download |
16-Jul-2007 ET |
2002 |
603 |
0 |
RRM |
Normative text for the RRM scope for the PAR |
Dayrl Kaiser, Cisco Systems |
12-Sep-2002 14:06:14 ET |
Download |
16-Jul-2007 ET |
2002 |
535 |
11 |
TGg |
Letter Ballot 41 Comment Resolution |
Matthew B. Shoemake (TGg Chair) |
12-Sep-2002 13:10:20 ET |
Download |
16-Jul-2007 ET |
2002 |
601 |
0 |
RRM |
Control |
Simon Barber, Instant802 Networks |
12-Sep-2002 13:05:56 ET |
Download |
16-Jul-2007 ET |
2002 |
535 |
10 |
TGg |
Letter Ballot 41 Comment Resolution |
Matthew B. Shoemake (TGg Chair) |
12-Sep-2002 12:59:22 ET |
Download |
16-Jul-2007 ET |
2002 |
568 |
0 |
RRM |
RRM Architecture |
David Skellern (Cisco Systems) |
12-Sep-2002 11:09:52 ET |
Download |
16-Jul-2007 ET |
2002 |
565 |
0 |
WNG SC |
Draft of 5 Criteria for 4.9 GHz - 5GHz Operation in Japan |
Peter Ecclesine (Cisco Systems) |
12-Sep-2002 10:58:34 ET |
Download |
16-Jul-2007 ET |
2002 |
600 |
0 |
RRM |
Radio_Resource_Measurement_Sep_12_2002PM_Agenda |
Richard Paine, Boeing |
12-Sep-2002 01:56:40 ET |
Download |
16-Jul-2007 ET |
2002 |
599 |
0 |
RRM |
Radio_Resource_Measurement_Sep_12_2002AM_Agenda |
Richard Paine, Boeing |
12-Sep-2002 01:56:24 ET |
Download |
16-Jul-2007 ET |
2002 |
598 |
0 |
RRM |
Radio_Resource_Measurement_Sep_12_2002_Agenda |
Richard Paine, Boeing |
12-Sep-2002 01:56:06 ET |
Download |
16-Jul-2007 ET |
2002 |
597 |
0 |
RRM |
Radio_Resource_Measurement_Sep_11_2002_Plenary_Report |
Richard Paine, Boeing |
12-Sep-2002 01:55:46 ET |
Download |
16-Jul-2007 ET |
2002 |
596 |
0 |
RRM |
Radio_Resource_Measurement_Sep_10_2002_Agenda |
Richard Paine, Boeing |
12-Sep-2002 01:55:26 ET |
Download |
16-Jul-2007 ET |
2002 |
508 |
4 |
RRM |
RRM_Draft_Outline_Requirements_&_Issues_8-14-02 |
Richard Paine, Boeing |
12-Sep-2002 01:45:34 ET |
Download |
16-Jul-2007 ET |
2002 |
594 |
0 |
TGe |
PF Differentiation and EDCF/RR |
Mathilde Benveniste (Avaya Labs Research) |
12-Sep-2002 01:33:44 ET |
Download |
16-Jul-2007 ET |
2002 |
593 |
0 |
TGe |
EDCF/EPCF Comparisons |
Matthew Sherman, AT&T |
12-Sep-2002 01:30:16 ET |
Download |
16-Jul-2007 ET |
2002 |
592 |
0 |
TGe |
Wireless Multimedia Enhancements (WME) Phase 1 |
Duncan Kitchin, Intel, et. al. |
12-Sep-2002 01:23:04 ET |
Download |
16-Jul-2007 ET |
2002 |
590 |
0 |
TGi |
RSN-Capabilities-Field |
David Halasz (Cisco Systems, Inc.) |
12-Sep-2002 01:21:56 ET |
Download |
16-Jul-2007 ET |
2002 |
588 |
0 |
TGi |
TGi_Preliminary_Agenda_for_the_Sept_2002_Session |
David Halasz (Cisco Systems, Inc.) |
12-Sep-2002 01:18:14 ET |
Download |
16-Jul-2007 ET |
2002 |
585 |
0 |
WNG SC |
Authentication Hiperlan/HiSWANa |
McCann (Siemens) |
12-Sep-2002 01:12:50 ET |
Download |
16-Jul-2007 ET |
2002 |
583 |
0 |
TGF |
TGF mtg report for Sept 2002 |
David Bagby (Self) |
12-Sep-2002 01:09:56 ET |
Download |
16-Jul-2007 ET |
2002 |
582 |
0 |
802.11 WG |
Coexistence Beacon Element |
Chris Zegelin (Symbol), Graham Melville (Symbol), Bob Neilsen (Symbol) |
12-Sep-2002 01:08:54 ET |
Download |
16-Jul-2007 ET |
2002 |
557 |
0 |
WNG SC |
Wireless Interworking Opening |
Thomas Haskestad (telenor) |
12-Sep-2002 01:00:44 ET |
Download |
16-Jul-2007 ET |
2002 |
555 |
1 |
RRM |
RRM_SG_Big_Picture_Issues.ppt |
Joe Kwak (InterDigital Communications) |
12-Sep-2002 01:00:04 ET |
Download |
16-Jul-2007 ET |
2002 |
555 |
0 |
RRM |
RRM_SG_Big_Picture_Issues.ppt |
Joe Kwak (InterDigital Communications) |
12-Sep-2002 00:57:52 ET |
Download |
16-Jul-2007 ET |
2002 |
553 |
0 |
TGi |
CCMP MIC Processing |
Paul A. Lambert (Airgo Networks, Inc.) |
12-Sep-2002 00:42:54 ET |
Download |
16-Jul-2007 ET |
2002 |
551 |
1 |
TGi |
TGi Frame Exchanges |
Pejman Roshan (Cisco Systems), Nancy Cam-Winget (Cisco Systems), Tim Moore (Microsoft) |
12-Sep-2002 00:41:42 ET |
Download |
16-Jul-2007 ET |
2002 |
551 |
0 |
TGi |
TGi Frame Exchanges |
Pejman Roshan (Cisco Systems), Nancy Cam-Winget (Cisco Systems), Tim Moore (Microsoft) |
12-Sep-2002 00:40:40 ET |
Download |
16-Jul-2007 ET |
2002 |
549 |
0 |
TGe |
Normative Text for Encoding User Priority in RTS, CTS and ACK Frames |
Menzo Wentink (Intersil) |
12-Sep-2002 00:39:40 ET |
Download |
16-Jul-2007 ET |
2002 |
544 |
0 |
TGe |
Distributed Admission Control for EDCF |
Menzo Wentink (Intersil) |
12-Sep-2002 00:34:16 ET |
Download |
16-Jul-2007 ET |
2002 |
538 |
0 |
TGg |
TGg Chairs Status Update - September 9 2002 |
Matthew B. Shoemake (TGg Chair) |
12-Sep-2002 00:31:42 ET |
Download |
16-Jul-2007 ET |
2002 |
537 |
0 |
802.11 WG |
TGg Report September 9, 2002 |
Matthew B. Shoemake (TGg Chair) |
12-Sep-2002 00:30:24 ET |
Download |
16-Jul-2007 ET |
2002 |
524 |
1 |
TGe |
TGe Fast-Track Consensus Proposal Presentation |
Benno Ritter, Matthew Shoemake, Keith Amann, Matthew Sherman, Rolf de Vegt et. al |
12-Sep-2002 00:23:24 ET |
Download |
16-Jul-2007 ET |
2002 |
524 |
0 |
TGe |
TGe Fast-Track Consensus Proposal Presentation |
Benno Ritter, Matthew Shoemake, Keith Amann, Matthew Sherman, Rolf de Vegt et. al |
12-Sep-2002 00:22:02 ET |
Download |
16-Jul-2007 ET |
2002 |
523 |
1 |
TGe |
An-alternative-mechanism-to-provide-parameterized-QoS |
Srinivas Kandala, John M. Kowalski, Yashihiro Ohtani and Shugong Xu, Sharp Labs |
12-Sep-2002 00:21:06 ET |
Download |
16-Jul-2007 ET |
2002 |
523 |
0 |
TGe |
An-alternative-mechanism-to-provide-parameterized-QoS |
Srinivas Kandala, John M. Kowalski, Yashihiro Ohtani and Shugong Xu, Sharp Labs |
12-Sep-2002 00:19:38 ET |
Download |
16-Jul-2007 ET |
2002 |
521 |
0 |
TGi |
Suggested-Motions-And-Discussions-From-TGi-August-Ad-Hoc |
Dave Halasz, Cisco |
12-Sep-2002 00:17:14 ET |
Download |
16-Jul-2007 ET |
2002 |
499 |
2 |
TGi |
Use of 802.1X with IBSS |
Tim Moore, Microsoft, David Halasz, Cisco Systems, Doug Smith, Cisco Systems, Jonathan Edney, Qosine Ltd |
12-Sep-2002 00:13:20 ET |
Download |
16-Jul-2007 ET |
2002 |
438 |
2 |
TGe |
Direct Link Protocol |
S. Kandala, Sharp Labs |
11-Sep-2002 23:48:24 ET |
Download |
16-Jul-2007 ET |
2002 |
362 |
6 |
TGi |
Proposed Test Vectors for IEEE 802.11 TGi |
Mike Sabin (Woodside Networks), Paul Lambert (Woodside Networks) |
11-Sep-2002 23:44:34 ET |
Download |
16-Jul-2007 ET |
2002 |
564 |
0 |
WNG SC |
Draft Project Authorization Request (PAR) 4.9 GHz - 5GHz Operation in Japan |
Peter Ecclesine (Cisco Systems) |
11-Sep-2002 19:19:18 ET |
Download |