Created (ET) ▼ |
Year |
DCN |
Rev |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
15-Jul-2013 ET |
2013 |
389 |
1 |
TG8 |
Performance evaluation for LG's proposal |
Suhwook Kim(LG Elctronics) |
15-Jul-2013 07:38:18 ET |
Download |
12-Jul-2013 ET |
2013 |
407 |
0 |
TG8 |
Comment and resolution to TGD |
Marco Hernandez (NICT) |
12-Jul-2013 21:40:34 ET |
Download |
12-Jul-2013 ET |
2013 |
375 |
1 |
TG8 |
Self Spatial Filtering Scheme for PAC |
Byung-Jae Kwak (ETRI) |
12-Jul-2013 04:51:39 ET |
Download |
12-Jul-2013 ET |
2013 |
374 |
1 |
TG8 |
A Feasible and Efficient Channel Access Scheme for PAC networks |
Sunggeun Jin (Daegu University) |
12-Jul-2013 04:50:59 ET |
Download |
12-Jul-2013 ET |
2013 |
373 |
1 |
TG8 |
ETRI Technical PHY proposal for IEEE 802.15 TG8 PAC Standard |
Kapseok Chang (ETRI) |
12-Jul-2013 04:49:29 ET |
Download |
11-Jul-2013 ET |
2013 |
278 |
2 |
TG8 |
UWB PHY Proposal to TG8 |
Billy Verso (DecaWave), Michael McLaughlin (DecaWave) |
11-Jul-2013 12:32:59 ET |
Download |
10-Jul-2013 ET |
2013 |
278 |
1 |
TG8 |
UWB PHY Proposal to TG8 |
Billy Verso (DecaWave), Michael McLaughlin (DecaWave) |
10-Jul-2013 12:53:04 ET |
Download |
08-Jul-2013 ET |
2013 |
396 |
0 |
TG8 |
NICT PHY Proposal Document |
Huan-Bang Li, Marco Hernandez, Igor Dotliae, Ryu Miura (NICT) |
08-Jul-2013 08:45:22 ET |
Download |
08-Jul-2013 ET |
2013 |
395 |
0 |
TG8 |
Text proposal for PFD |
Jinyoung Chun(LG Electronics) |
08-Jul-2013 02:19:03 ET |
Download |
08-Jul-2013 ET |
2013 |
394 |
0 |
TG8 |
PAC proposal for PFD |
Jinyoung Chun (LG Electronics) |
08-Jul-2013 02:19:19 ET |
Download |
08-Jul-2013 ET |
2013 |
393 |
0 |
TG8 |
A PHY proposal for PAC operates in synchronous mode (ppt) |
Seokki Kim(ETRI) |
08-Jul-2013 06:43:43 ET |
Download |
08-Jul-2013 ET |
2013 |
392 |
0 |
TG8 |
Details of a proposal for PAC operates in synchronous mode (doc) |
Seungkwon Cho(ETRI) |
10-Jul-2013 19:56:39 ET |
Download |
07-Jul-2013 ET |
2013 |
391 |
0 |
TG8 |
Overview of a proposal for PAC operates in synchronous mode (ppt) |
Seungkwon Cho(ETRI) |
08-Jul-2013 11:20:03 ET |
Download |
07-Jul-2013 ET |
2013 |
390 |
0 |
TG8 |
A MAC proposal for PAC operates in synchronous mode (ppt) |
Seungkwon Cho(ETRI) |
08-Jul-2013 09:54:37 ET |
Download |
07-Jul-2013 ET |
2013 |
389 |
0 |
TG8 |
Performance evaluation for LG's proposal |
Suhwook Kim(LG Elctronics) |
08-Jul-2013 02:14:17 ET |
Download |
07-Jul-2013 ET |
2013 |
388 |
0 |
TG8 |
Technical Proposal for IEEE 802.15.8 (doc) |
Jeongseok Yu et al. (Chung-Ang University) |
07-Jul-2013 19:16:38 ET |
Download |
07-Jul-2013 ET |
2013 |
387 |
0 |
TG8 |
Technical Proposal for IEEE 802.15.8 (ppt) |
Jeongseok Yu et al. (Chung-Ang University) |
07-Jul-2013 19:13:43 ET |
Download |
07-Jul-2013 ET |
2013 |
385 |
0 |
TG8 |
Low Energy Service Discovery PHY for PAC WPAN |
Tae-Joon Park |
07-Jul-2013 13:50:16 ET |
Download |
07-Jul-2013 ET |
2013 |
384 |
0 |
TG8 |
Draft of low energy service discovery (LESD) PHY protocol for PAC WPAN |
Tae-Joon Park(ETRI) |
07-Jul-2013 13:47:18 ET |
Download |
07-Jul-2013 ET |
2013 |
383 |
0 |
TG8 |
NICT Impulse Radio Ultra Wideband PHY proposal to IEEE 802.15.8 |
Dotlic, Li, Hernandez, Miura (NICT) |
07-Jul-2013 10:33:35 ET |
Download |
07-Jul-2013 ET |
2013 |
382 |
0 |
TG8 |
NICT Impulse Radio Ultra-Wideband PHY Proposal to IEEE 802.15.8 (text) |
Dotlic, Li, Hernandez, Miura (NICT) |
07-Jul-2013 10:31:35 ET |
Download |
07-Jul-2013 ET |
2013 |
381 |
0 |
TG8 |
NICTfs MAC Proposal With Simulation Results |
Huan-Bang Li, Marco Hernandez, Igor Dotlic, and Ryu Miura (NICT) |
07-Jul-2013 10:14:30 ET |
Download |
07-Jul-2013 ET |
2013 |
380 |
0 |
TG8 |
Final Proposals for IEEE802.15.8 |
Qing Li (InterDigital) |
08-Jul-2013 06:10:51 ET |
Download |
07-Jul-2013 ET |
2013 |
379 |
0 |
TG8 |
Draft of Low Energy Service Discovery MAC Protocol for PAC WPAN |
Wun-Cheol Jeong (ETRI) |
07-Jul-2013 09:54:10 ET |
Download |
07-Jul-2013 ET |
2013 |
378 |
0 |
TG8 |
Low Energy Service Discovery MAC Protocol for PAC WPAN |
Wun-Cheol Jeong (ETRI) |
07-Jul-2013 09:54:39 ET |
Download |
07-Jul-2013 ET |
2013 |
377 |
0 |
TG8 |
Samsung Proposal for PFD (document) |
Seung-Hoon Park et. al. |
07-Jul-2013 09:24:41 ET |
Download |
07-Jul-2013 ET |
2013 |
376 |
0 |
TG8 |
Samsung Proposal: PAC Operations and Frame Structures |
Seung-Hoon Park et. al. |
07-Jul-2013 09:24:09 ET |
Download |
07-Jul-2013 ET |
2013 |
375 |
0 |
TG8 |
Self Spatial Filtering Scheme for PAC |
Byung-Jae Kwak (ETRI) |
07-Jul-2013 09:07:59 ET |
Download |
07-Jul-2013 ET |
2013 |
374 |
0 |
TG8 |
A Feasible and Efficient Channel Access Scheme for PAC networks |
Sunggeun Jin (Daegu University) |
07-Jul-2013 09:07:31 ET |
Download |
07-Jul-2013 ET |
2013 |
373 |
0 |
TG8 |
ETRI Technical PHY proposal for IEEE 802.15 TG8 PAC Standard |
Kapseok Chang (ETRI) |
07-Jul-2013 09:07:11 ET |
Download |
06-Jul-2013 ET |
2013 |
371 |
0 |
TG8 |
NICT PHY Proposal (Doc) |
Marco Hernandez (NICT) |
06-Jul-2013 07:20:10 ET |
Download |
06-Jul-2013 ET |
2013 |
370 |
0 |
TG8 |
NICT PHY Proposal (Part B) |
Marco Hernandez (NICT) |
06-Jul-2013 07:16:24 ET |
Download |
06-Jul-2013 ET |
2013 |
369 |
0 |
TG8 |
NICT PHY Proposal (Part A) |
Marco Hernandez (NICT) |
06-Jul-2013 07:11:45 ET |
Download |
04-Jul-2013 ET |
2013 |
368 |
0 |
TG8 |
PAC link layer specification (draft) |
Seong-Soon Joo (ETRI) |
07-Jul-2013 14:12:07 ET |
Download |
04-Jul-2013 ET |
2013 |
367 |
0 |
TG8 |
PAC link layer specification |
Seong-Soon Joo (ETRI) |
07-Jul-2013 14:09:46 ET |
Download |
03-Jul-2013 ET |
2013 |
100 |
1 |
TG8 |
Comments and resolutions to TGD |
Marco Hernandez (NICT) |
03-Jul-2013 23:06:32 ET |
Download |
02-Jul-2013 ET |
2013 |
363 |
0 |
TG8 |
TG8-PAC-agenda-Geneva-July2013 |
Myung Lee, CUNY |
02-Jul-2013 11:59:45 ET |
Download |
22-May-2013 ET |
2013 |
343 |
0 |
TG8 |
Peer Aware Communications (PAC) Task Group minutes for May 2013 |
Seungkwon Cho (ETRI) |
22-May-2013 23:46:26 ET |
Download |
16-May-2013 ET |
2013 |
334 |
0 |
TG8 |
TG8 PAC Closing Report |
Myung Lee (CUNY), Huan-Bang Li (NICT) |
16-May-2013 20:50:10 ET |
Download |
16-May-2013 ET |
2012 |
459 |
6 |
TG8 |
TG8 channel models |
Marco Hernandez (NICT) |
16-May-2013 18:58:14 ET |
Download |
16-May-2013 ET |
2013 |
328 |
2 |
TG8 |
TG8 PAC Framework Document (Draft) |
Seung-Hoon Park (Samsung) & Byung-Jae Kwak (ETRI) |
16-May-2013 16:21:08 ET |
Download |
16-May-2013 ET |
2013 |
328 |
1 |
TG8 |
TG8 PAC Framework Document (Draft) |
Seung-Hoon Park (Samsung) & Byung-Jae Kwak (ETRI) |
16-May-2013 15:04:49 ET |
Download |
16-May-2013 ET |
2013 |
328 |
0 |
TG8 |
TG8 PAC Framework Document (Draft) |
Seung-Hoon Park (Samsung) & Byung-Jae Kwak (ETRI) |
16-May-2013 06:11:19 ET |
Download |
15-May-2013 ET |
2013 |
325 |
1 |
TG8 |
Suggestion for TG8 PFD |
Seung-Hoon Park(Samsung) and Byung-Jae Kwak (ETRI) |
15-May-2013 20:55:30 ET |
Download |
15-May-2013 ET |
2013 |
325 |
0 |
TG8 |
Suggestion for TG8 PFD |
Seung-Hoon Park(Samsung) and Byung-Jae Kwak (ETRI) |
15-May-2013 19:43:58 ET |
Download |
14-May-2013 ET |
2013 |
269 |
2 |
TG8 |
Superframe structure and deferred beacon in distributed PAC environments |
Chang-Sub Shin (ETRI) |
14-May-2013 17:45:14 ET |
Download |
14-May-2013 ET |
2013 |
268 |
1 |
TG8 |
Common discovery mode for PAC: MAC |
Wun-Cheol Jeong (ETRI) |
14-May-2013 16:07:10 ET |
Download |
14-May-2013 ET |
2013 |
274 |
1 |
TG8 |
Technical Proposal for IEEE 802.15.8 |
Sungrae Cho et al. (Chung-Ang University) |
14-May-2013 15:44:03 ET |
Download |
14-May-2013 ET |
2013 |
269 |
1 |
TG8 |
Superframe structure and deferred beacon in distributed PAC environments |
Chang-Sub Shin (ETRI) |
14-May-2013 15:15:00 ET |
Download |
14-May-2013 ET |
2013 |
267 |
1 |
TG8 |
Pre-proposal PAC Operations and Frame Structure |
Seung-Hoon Park et. al. (Samsung) |
14-May-2013 14:09:38 ET |
Download |
14-May-2013 ET |
2013 |
276 |
1 |
TG8 |
PHY pre-proposal for PAC low rate services |
Tae-Joon Park(ETRI) |
14-May-2013 08:53:28 ET |
Download |
13-May-2013 ET |
2013 |
262 |
1 |
TG8 |
A reference model of the PAC enabled networks |
Seong-Soon Joo (ETRI) |
13-May-2013 20:55:52 ET |
Download |
13-May-2013 ET |
2013 |
301 |
0 |
TG8 |
Proposals from ETRI for IEEE 802.15 TG8 PAC standard |
Byung-Jae Kwak (ETRI) |
13-May-2013 16:57:05 ET |
Download |
13-May-2013 ET |
2013 |
282 |
1 |
TG8 |
Pre-proposals for IEEE802.15.8 |
Qing Li (InterDigital) |
13-May-2013 12:41:46 ET |
Download |
13-May-2013 ET |
2013 |
291 |
1 |
TG8 |
TG8-PAC-agenda-Hawaii-May2013 |
Myung Lee, CUNY |
13-May-2013 05:23:40 ET |
Download |
11-May-2013 ET |
2013 |
291 |
0 |
TG8 |
TG8-PAC-agenda-Hawaii-May2013 |
Myung Lee, CUNY |
11-May-2013 02:01:43 ET |
Download |
07-May-2013 ET |
2013 |
282 |
0 |
TG8 |
Pre-proposals for IEEE802.15.8 |
Qing Li (InterDigital) |
07-May-2013 23:32:47 ET |
Download |
07-May-2013 ET |
2013 |
271 |
1 |
TG8 |
Technical Pre-proposal for IEEE 802.15 TG8 PAC Standard |
Byung-Jae Kwak (ETRI) |
07-May-2013 02:49:55 ET |
Download |
07-May-2013 ET |
2013 |
281 |
0 |
TG8 |
Technical proposal of discovery for PAC |
Jinyoung Chun (LG Electronics) |
07-May-2013 05:18:10 ET |
Download |
07-May-2013 ET |
2013 |
280 |
0 |
TG8 |
Technical proposal for PAC |
Jinyoung Chun (LG Electronics) |
07-May-2013 05:17:35 ET |
Download |
06-May-2013 ET |
2013 |
278 |
0 |
TG8 |
UWB PHY Proposal to TG8 |
Billy Verso (DecaWave), Michael McLaughlin (DecaWave) |
06-May-2013 17:04:27 ET |
Download |
06-May-2013 ET |
2013 |
277 |
0 |
TG8 |
NICT Impulse Radio Ultra Wideband PHY Pre-proposal to IEEE 802.15.8 |
Igor Dotlic (NICT) |
06-May-2013 12:56:10 ET |
Download |
06-May-2013 ET |
2013 |
276 |
0 |
TG8 |
PHY pre-proposal for PAC low rate services |
Tae-Joon Park(ETRI) |
06-May-2013 10:12:59 ET |
Download |
06-May-2013 ET |
2013 |
275 |
0 |
TG8 |
PHY pre-proposal for PAC common discovery mode |
Tae-Joon Park(ETRI) |
06-May-2013 10:08:58 ET |
Download |
06-May-2013 ET |
2013 |
274 |
0 |
TG8 |
Technical Proposal for IEEE 802.15.8 |
Sungrae Cho et al. (Chung-Ang University) |
06-May-2013 19:35:49 ET |
Download |
06-May-2013 ET |
2013 |
273 |
0 |
TG8 |
A proposal for PAC framework document |
Seungkwon Cho (ETRI) |
06-May-2013 09:42:22 ET |
Download |
06-May-2013 ET |
2013 |
272 |
0 |
TG8 |
Preliminary NICT PHY Proposal (Part A) |
Marco Hernandez (NICT) |
06-May-2013 06:31:59 ET |
Download |
06-May-2013 ET |
2013 |
271 |
0 |
TG8 |
Technical Pre-proposal for IEEE 802.15 TG8 PAC Standard |
Byung-Jae Kwak (ETRI) |
06-May-2013 06:19:29 ET |
Download |
06-May-2013 ET |
2013 |
270 |
1 |
TG8 |
NICTfs MAC Proposal For IEEE802.15.8 Peer Aware Communications |
Huan-Bang Li (NICT) |
06-May-2013 05:35:10 ET |
Download |
06-May-2013 ET |
2013 |
270 |
0 |
TG8 |
NICTfs MAC Proposal For IEEE802.15.8 Peer Aware Communications |
NICT |
06-May-2013 05:28:20 ET |
Download |
06-May-2013 ET |
2013 |
269 |
0 |
TG8 |
Superframe structure and deferred beacon in distributed PAC environments |
Chang-Sub Shin (ETRI) |
06-May-2013 04:43:02 ET |
Download |
06-May-2013 ET |
2013 |
268 |
0 |
TG8 |
Common discovery mode for PAC: MAC |
Wun-Cheol Jeong (ETRI) |
06-May-2013 04:43:22 ET |
Download |
06-May-2013 ET |
2013 |
267 |
0 |
TG8 |
Pre-proposal PAC Operations and Frame Structure |
Seung-Hoon Park et. al. (Samsung) |
06-May-2013 07:20:58 ET |
Download |
03-May-2013 ET |
2013 |
262 |
0 |
TG8 |
A reference model of the PAC enabled networks |
Seong-Soon Joo (ETRI) |
06-May-2013 20:32:05 ET |
Download |
19-Mar-2013 ET |
2013 |
182 |
1 |
TG8 |
Common discovery mode for PAC |
Tae-Joon Park(ETRI) |
19-Mar-2013 18:52:25 ET |
Download |
19-Mar-2013 ET |
2013 |
188 |
0 |
TG8 |
TG8-PAC-minutes-Mar-Orlando |
Suhwook Kim(LG Electronics) |
19-Mar-2013 17:08:47 ET |
Download |
19-Mar-2013 ET |
2013 |
115 |
1 |
TG8 |
TG8-PAC-agenda-Orlando-March2013 |
Myung Lee, CUNY |
19-Mar-2013 16:37:25 ET |
Download |
19-Mar-2013 ET |
2013 |
187 |
0 |
TG8 |
TG8-PAC-Closing-Report-March13 |
Myung Jong Lee |
19-Mar-2013 17:32:19 ET |
Download |
19-Mar-2013 ET |
2013 |
69 |
5 |
TG8 |
TG8 Call for Proposals (CFP) |
Lee (CUNY), Li (NICT), Kim (LGE) |
19-Mar-2013 16:25:45 ET |
Download |
19-Mar-2013 ET |
2012 |
568 |
5 |
TG8 |
TG8 Technical Guidance Document |
Seung-Hoon Park (Samsung) and Sunggeun Jin (ETRI) |
19-Mar-2013 16:04:54 ET |
Download |
19-Mar-2013 ET |
2013 |
58 |
1 |
TG8 |
Candidate Link Curve SNR-PER |
Seung-Hoon Park (Samsung) |
19-Mar-2013 15:01:50 ET |
Download |
19-Mar-2013 ET |
2012 |
459 |
5 |
TG8 |
TG8 channel models |
Marco Hernandez (NICT) |
19-Mar-2013 14:43:51 ET |
Download |
19-Mar-2013 ET |
2013 |
127 |
1 |
TG8 |
Differential detection of IR-UWB PPM symbols |
Dotlic, Li, Hernandez, Miura (NICT) |
19-Mar-2013 13:50:28 ET |
Download |
19-Mar-2013 ET |
2013 |
182 |
0 |
TG8 |
Common discovery mode for PAC |
Tae-Joon Park(ETRI) |
19-Mar-2013 13:32:04 ET |
Download |
19-Mar-2013 ET |
2013 |
169 |
1 |
TG8 |
Es/N0 Calculation |
Seung-Hoon Park et. al. (Samsung Electronics) |
19-Mar-2013 10:40:25 ET |
Download |
19-Mar-2013 ET |
2013 |
99 |
2 |
TG8 |
Comments to System-Level Simulation of TGD |
Marco Hernandez (NICT) Seung-Hoon Park (Samsung) |
19-Mar-2013 08:32:05 ET |
Download |
19-Mar-2013 ET |
2013 |
169 |
0 |
TG8 |
Es/N0 Calculation |
Seung-Hoon Park et. al. (Samsung Electronics) |
19-Mar-2013 08:33:20 ET |
Download |
18-Mar-2013 ET |
2013 |
102 |
1 |
TG8 |
Comments on TGD |
Jinyoung Chun(LG Electronics) |
18-Mar-2013 17:24:16 ET |
Download |
18-Mar-2013 ET |
2013 |
124 |
1 |
TG8 |
Discussion and Conclusion of Conference Call on February19 |
Huan-Bang Li (NICT), Seung-Hoon Park (Samsung),Zeria Eldad (Inter Digital), Jinyoung Chun (LGE), Igor Dotlic (NICT), Suhwook Kim (LGE) |
18-Mar-2013 16:08:24 ET |
Download |
17-Mar-2013 ET |
2013 |
140 |
0 |
TG8 |
PHY Aspects for PAC |
Marco Hernandez (NICT) |
17-Mar-2013 21:38:02 ET |
Download |
15-Mar-2013 ET |
2013 |
129 |
0 |
TG8 |
Concurrent communications for PAC |
Suhwook Kim (LG Electronics) |
18-Mar-2013 00:35:45 ET |
Download |
15-Mar-2013 ET |
2013 |
128 |
0 |
TG8 |
Analysis of synchronization under PAC situation |
Jinyoung Chun (LG Electronics) |
17-Mar-2013 22:40:30 ET |
Download |
14-Mar-2013 ET |
2013 |
127 |
0 |
TG8 |
Differential detection of IR-UWB PPM symbols |
Dotlic, Li, Hernandez, Miura (NICT) |
14-Mar-2013 04:14:50 ET |
Download |
13-Mar-2013 ET |
2013 |
124 |
0 |
TG8 |
Discussion and Conclusion of Conference Call on February19 |
Huan-Bang Li (NICT), Seung-Hoon Park (Samsung),Zeria Eldad (Inter Digital), Jinyoung Chun (LGE), Igor Dotlic (NICT), Suhwook Kim (LGE) |
13-Mar-2013 04:40:37 ET |
Download |
11-Mar-2013 ET |
2013 |
121 |
0 |
TG8 |
PAC Synchronous Operation |
Seung-Hoon Park et. al. (Samsung) |
11-Mar-2013 09:17:48 ET |
Download |
07-Mar-2013 ET |
2013 |
115 |
0 |
TG8 |
TG8-PAC-agenda-Orlando-March2013 |
Myung Lee, CUNY |
07-Mar-2013 10:44:12 ET |
Download |
18-Feb-2013 ET |
2013 |
99 |
1 |
TG8 |
Comments to System-Level Simulation of TGD |
Seung-Hoon Park (Samsung) |
18-Feb-2013 19:26:59 ET |
Download |
05-Feb-2013 ET |
2013 |
102 |
0 |
TG8 |
Comments on TGD |
Jinyoung Chun(LG Electronics) |
05-Feb-2013 02:44:13 ET |
Download |
04-Feb-2013 ET |
2013 |
101 |
0 |
TG8 |
Comments and resolutions for document 13-99 |
Marco Hernandez (NICT) |
04-Feb-2013 06:12:08 ET |
Download |
04-Feb-2013 ET |
2013 |
100 |
0 |
TG8 |
Comments and resolutions to TGD |
Marco Hernandez (NICT) |
04-Feb-2013 06:07:59 ET |
Download |