Created (ET) |
Year ▲ |
DCN ▲ |
Rev ▲ |
Group |
Title |
Author (Affiliation) |
Uploaded (ET) |
Actions |
19-Jul-2012 ET |
2012 |
495 |
0 |
Gcon: Group Contribution |
Proposed Contribution to ITU-R WP 5D - Update of Subclause 5.6 of Rec. ITU-R M.1457-11 (Meeting X) |
Roger Marks (Consensii LLC) |
19-Jul-2012 02:36:38 ET |
Download |
19-Jul-2012 ET |
2012 |
495 |
1 |
Gcon: Group Contribution |
Proposed Contribution to ITU-R WP 5D - Update of Subclause 5.6 of Rec. ITU-R M.1457-11 (Meeting X) |
Roger Marks (Consensii LLC) |
19-Jul-2012 11:44:09 ET |
Download |
19-Jul-2012 ET |
2012 |
496 |
0 |
Shet: SG - HetNet |
Proposed Draft Call for Contributions toward IEEE 802.16q Meeting at Session #81 |
Jaesun Cha (ETRI) |
19-Jul-2012 11:35:32 ET |
Download |
19-Jul-2012 ET |
2012 |
497 |
0 |
Gdoc: Group Document |
802.16 PPC Closing Report - Session #80 |
Harry Bims (PPC) |
19-Jul-2012 21:09:36 ET |
Download |
19-Jul-2012 ET |
2012 |
497 |
1 |
Gdoc: Group Document |
802.16 PPC Closing Report - Session #80 |
Harry Bims (PPC) |
19-Jul-2012 23:21:20 ET |
Download |
19-Jul-2012 ET |
2012 |
498 |
0 |
Gcon: Group Contribution |
Draft Liaison Statement from WP 5D on Sharing Parameters for IMT-Advanced |
Roger Marks (Consensii LLC) |
19-Jul-2012 12:39:55 ET |
Download |
19-Jul-2012 ET |
2012 |
499 |
0 |
Gdoc: Group Document |
ITU-R Liaison Group Closing Report for Session #80 |
Hjime Kanzaki (ITU-R Liaison Group) |
19-Jul-2012 18:58:21 ET |
Download |
20-Jul-2012 ET |
2012 |
499 |
1 |
Gdoc: Group Document |
ITU-R Liaison Group Closing Report for Session #80 |
Hajime Kanzaki (ITU-R Liaison Group) |
20-Jul-2012 00:10:34 ET |
Download |
19-Jul-2012 ET |
2012 |
500 |
0 |
Gdoc: Group Document |
Session #80 802.16 Maintenance Task Group Opening Slides |
Zheng Yan-Xiu (Maint TG) |
19-Jul-2012 14:27:31 ET |
Download |
19-Jul-2012 ET |
2012 |
501 |
0 |
Gdoc: Group Document |
Maintenance Task Group Session #80 Minutes |
Zheng Yan-Xiu (Maint TG) |
19-Jul-2012 14:43:04 ET |
Download |
19-Jul-2012 ET |
2012 |
502 |
0 |
Gdoc: Group Document |
Session #80 802.16 Maintenance Task Group Closing Plenary Report |
Zheng Yan-Xiu (Maint TG) |
19-Jul-2012 14:55:40 ET |
Download |
19-Jul-2012 ET |
2012 |
503 |
0 |
Gdoc: Group Document |
Minutes of the GRIDMAN Task Group for Session #80 |
Tim Godfrey (GRIDMAN Task Group) |
19-Jul-2012 15:10:11 ET |
Download |
19-Jul-2012 ET |
2012 |
504 |
0 |
Gdoc: Group Document |
Session #80 802.16 M2M Task Group Closing Report |
Jaesun Cha (M2M TG) |
19-Jul-2012 17:28:32 ET |
Download |
19-Jul-2012 ET |
2012 |
505 |
0 |
Gdoc: Group Document |
OmniRAN Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Harry Bims (HetNet Study Group) |
19-Jul-2012 18:41:05 ET |
Download |
20-Jul-2012 ET |
2012 |
505 |
1 |
Gdoc: Group Document |
OmniRAN Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Harry Bims (HetNet Study Group) |
20-Jul-2012 03:07:21 ET |
Download |
19-Jul-2012 ET |
2012 |
506 |
0 |
Shet: SG - HetNet |
OmniRAN Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Harry Bims (HetNet Study Group Chair) |
19-Jul-2012 18:46:54 ET |
Download |
20-Jul-2012 ET |
2012 |
506 |
1 |
Shet: SG - HetNet |
OmniRAN Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Harry Bims (HetNet Study Group Chair) |
20-Jul-2012 03:07:50 ET |
Download |
26-Jul-2012 ET |
2012 |
506 |
2 |
Shet: SG - HetNet |
OmniRAN Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Roger Marks (IEEE 802.16 WG) |
28-Jul-2012 19:23:27 ET |
Download |
19-Jul-2012 ET |
2012 |
507 |
0 |
Shet: SG - HetNet |
Multi-Tier Networks Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Harry Bims (HetNet Study Group Chair) |
19-Jul-2012 19:04:41 ET |
Download |
19-Jul-2012 ET |
2012 |
507 |
1 |
Shet: SG - HetNet |
Multi-Tier Networks Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Harry Bims (HetNet Study Group Chair) |
19-Jul-2012 19:56:30 ET |
Download |
28-Jul-2012 ET |
2012 |
507 |
2 |
Shet: SG - HetNet |
Multi-Tier Networks Call for Contributions toward HetNet Study Group Meeting at Session #81 |
Roger Marks (IEEE 802.16 WG) |
28-Jul-2012 19:12:20 ET |
Download |
19-Jul-2012 ET |
2012 |
508 |
0 |
Shet: SG - HetNet |
Call for Contributions: Small-Cell Backhaul (SCB) Enhancements to WirelessMAN-OFDMA HetNet Study G |
Harry Bims (HetNet Study Group Chair) |
19-Jul-2012 19:25:58 ET |
Download |
19-Jul-2012 ET |
2012 |
508 |
1 |
Shet: SG - HetNet |
Call for Contributions: Small-Cell Backhaul (SCB) Enhancements to WirelessMAN-OFDMA HetNet Study G |
Harry Bims (HetNet Study Group Chair) |
19-Jul-2012 19:31:52 ET |
Download |
19-Jul-2012 ET |
2012 |
509 |
0 |
Gdoc: Group Document |
Call for Contributions: Small-Cell Backhaul (SCB) Enhancements to WirelessMAN-OFDMA HetNet Study G |
Harry Bims (HetNet Study Group) |
19-Jul-2012 19:38:07 ET |
Download |
19-Jul-2012 ET |
2012 |
509 |
1 |
Gdoc: Group Document |
Call for Contributions: Small-Cell Backhaul (SCB) Enhancements to WirelessMAN-OFDMA HetNet Study G |
Harry Bims (HetNet Study Group) |
19-Jul-2012 20:08:08 ET |
Download |
19-Jul-2012 ET |
2012 |
509 |
2 |
Gdoc: Group Document |
Call for Contributions: Small-Cell Backhaul (SCB) Enhancements to WirelessMAN-OFDMA HetNet Study G |
Harry Bims (HetNet Study Group) |
19-Jul-2012 20:15:22 ET |
Download |
19-Jul-2012 ET |
2012 |
511 |
0 |
Gcon: Group Contribution |
Proposed Liaison statement to WATO members regarding Sharing Parameters |
Roger Marks (Consensii LLC) |
19-Jul-2012 22:20:20 ET |
Download |
20-Jul-2012 ET |
2012 |
512 |
0 |
Gdoc: Group Document |
Minutes of IEEE 802.16 Session #80 |
Harry Bims (WG Secretary) |
20-Jul-2012 03:10:25 ET |
Download |
12-Sep-2012 ET |
2012 |
512 |
1 |
Gdoc: Group Document |
Minutes of IEEE 802.16 Session #80 |
Harry Bims (WG Secretary) |
12-Sep-2012 13:14:04 ET |
Download |
14-Sep-2012 ET |
2012 |
512 |
2 |
Gdoc: Group Document |
Minutes of IEEE 802.16 Session #80 |
Harry Bims (WG Secretary) |
14-Sep-2012 02:25:41 ET |
Download |
20-Jul-2012 ET |
2012 |
513 |
0 |
Gdoc: Group Document |
P802.16n to Sponsor Ballot: Conditional Approval Request |
Roger Marks (IEEE 802.16 WG) |
20-Jul-2012 14:27:21 ET |
Download |
20-Jul-2012 ET |
2012 |
514 |
0 |
Gdoc: Group Document |
P802.16.1a to Sponsor Ballot: Conditional Approval Request |
Roger Marks (IEEE 802.16 WG) |
20-Jul-2012 14:38:58 ET |
Download |
24-Jul-2012 ET |
2012 |
515 |
0 |
WGLS: WG Liaison Statement |
LS to WATO: Sharing Parameters |
Roger Marks (IEEE 802.16 WG) |
24-Jul-2012 18:27:45 ET |
Download |
24-Jul-2012 ET |
2012 |
516 |
0 |
WGLS: WG Liaison Statement |
LS from ITU-R WP5D: Parameters for LTE-Advanced and WirelessMAN-Advanced for use in Sharing Studies |
uploaded by Roger Marks (IEEE 802.16 WG) |
24-Jul-2012 18:06:45 ET |
Download |
30-Jul-2012 ET |
2012 |
516 |
1 |
WGLS: WG Liaison Statement |
LS from ITU-R WP5D: Parameters for LTE-Advanced and WirelessMAN-Advanced for use in Sharing Studies |
uploaded by Roger Marks (IEEE 802.16 WG) |
30-Jul-2012 18:27:05 ET |
Download |
24-Jul-2012 ET |
2012 |
517 |
0 |
WGLS: WG Liaison Statement |
LS from ITU-R WP5D: Review of Report ITU-R M.2039 |
uploaded by Roger Marks (IEEE 802.16 WG) |
24-Jul-2012 18:07:42 ET |
Download |
24-Jul-2012 ET |
2012 |
518 |
0 |
WGLS: WG Liaison Statement |
LS to WATO: Mtg Y+1 Cont. of WirelessMAN-Advanced toward Rec. ITU-R M.2012-1 |
Roger Marks (IEEE 802.16 WG) |
24-Jul-2012 18:44:44 ET |
Download |
24-Jul-2012 ET |
2012 |
519 |
0 |
WGLS: WG Liaison Statement |
LS from ITU-R WP5D: Toward a preliminary draft new Report on the use of IMT for broadband PPDR |
uploaded by Roger Marks (IEEE 802.16 WG) |
24-Jul-2012 20:46:20 ET |
Download |
30-Jul-2012 ET |
2012 |
519 |
1 |
WGLS: WG Liaison Statement |
LS from ITU-R WP5D: Toward a preliminary draft new Report on the use of IMT for broadband PPDR |
uploaded by Roger Marks (IEEE 802.16 WG) |
30-Jul-2012 17:47:11 ET |
Download |
02-Aug-2012 ET |
2012 |
520 |
0 |
Gcon: Group Contribution |
Planning for Revision 12 of Rec. ITU-R M.1457 |
Roger Marks (Consensii LLC) |
02-Aug-2012 18:48:46 ET |
Download |
04-Aug-2012 ET |
2012 |
521 |
0 |
Gdoc: Group Document |
Working Group Letter Ballot Recirc #37c Comments |
Roger Marks (IEEE 802.16 WG) |
12-Aug-2012 13:10:47 ET |
Download |
04-Aug-2012 ET |
2012 |
522 |
0 |
Gdoc: Group Document |
Working Group Letter Ballot Recirc #38c Comments |
Roger Marks (IEEE 802.16 WG) |
12-Aug-2012 13:11:03 ET |
Download |
31-Aug-2012 ET |
2012 |
523 |
0 |
WGLS: WG Liaison Statement |
LS from Broadband Forum: Project update and Request for Input: WT-304 |
uploaded by Roger Marks (IEEE 802.16 WG) |
31-Aug-2012 10:41:40 ET |
Download |
04-Sep-2012 ET |
2012 |
524 |
0 |
000q: P802.16q |
Proposed Work Plan for Multi-tier Networks |
Jaesun Cha (ETRI) |
12-Sep-2012 04:56:33 ET |
Download |
05-Sep-2012 ET |
2012 |
525 |
0 |
Gdoc: Group Document |
Approved PAR P802.16.3 (Mobile Broadband Network Performance Measurements) |
Roger Marks (IEEE 802.16 WG) |
05-Sep-2012 11:26:31 ET |
Download |
05-Sep-2012 ET |
2012 |
526 |
0 |
Gdoc: Group Document |
Approved PAR P802.16q (Multi-Tier) |
Roger Marks (IEEE 802.16 WG) |
05-Sep-2012 11:29:32 ET |
Download |
10-Sep-2012 ET |
2012 |
527 |
0 |
Shet: SG - HetNet |
Proposed IEEE Std 802.16 Amendment for Small Cell Backhaul (SCB) Applications |
Roger Marks (Consensii LLC; Airspan Networks, Inc.) |
13-Sep-2012 00:43:37 ET |
Download |
10-Sep-2012 ET |
2012 |
528 |
0 |
Shet: SG - HetNet |
IEEE Std 802.16 Amendment for Small Cell Backhaul (SCB) Applications: Proposed PAR |
Roger Marks (Consensii LLC; Airspan Networks, Inc.) |
13-Sep-2012 00:44:17 ET |
Download |
10-Sep-2012 ET |
2012 |
529 |
0 |
Shet: SG - HetNet |
IEEE Std 802.16 Amendment for Small Cell Backhaul (SCB) Applications: Proposed Five Criteria |
Roger Marks (Consensii LLC; Airspan Networks, Inc.) |
13-Sep-2012 00:44:37 ET |
Download |
10-Sep-2012 ET |
2012 |
530 |
0 |
Shet: SG - HetNet |
IEEE Std 802.16 Amendment for Small Cell Backhaul (SCB) Applications:Proposed Call for Contributions |
Roger Marks (Consensii LLC; Airspan Networks, Inc.) |
13-Sep-2012 00:45:21 ET |
Download |
11-Sep-2012 ET |
2012 |
531 |
0 |
000q: P802.16q |
Proposed System Requirements on Mobility Management |
Jaesun Cha (ETRI) |
12-Sep-2012 04:56:58 ET |
Download |
17-Sep-2012 ET |
2012 |
531 |
1 |
000q: P802.16q |
Proposed System Requirements on Mobility Management |
Jaesun Cha (ETRI) |
17-Sep-2012 16:49:32 ET |
Download |
11-Sep-2012 ET |
2012 |
532 |
0 |
000q: P802.16q |
Overall System Requirements on IEEE 802.16q Multi-tier Network |
Eunkyung Kim (ETRI) |
12-Sep-2012 21:23:24 ET |
Download |
17-Sep-2012 ET |
2012 |
532 |
1 |
000q: P802.16q |
Overall System Requirements on IEEE 802.16q Multi-tier Network |
Eunkyung Kim (ETRI) |
17-Sep-2012 20:49:44 ET |
Download |
11-Sep-2012 ET |
2012 |
533 |
0 |
000q: P802.16q |
Proposed System Requirements on Base Staion Power Management for IEEE 802.16q Networks |
Anseok Lee (ETRI) |
13-Sep-2012 06:12:44 ET |
Download |
18-Sep-2012 ET |
2012 |
533 |
1 |
000q: P802.16q |
Proposed System Requirements on Base Staion Power Management for IEEE 802.16q Networks |
Anseok Lee (ETRI) |
18-Sep-2012 03:41:10 ET |
Download |
18-Sep-2012 ET |
2012 |
533 |
2 |
000q: P802.16q |
Proposed System Requirements on Base Staion Power Management for IEEE 802.16q Networks |
Anseok Lee (ETRI) |
18-Sep-2012 12:54:02 ET |
Download |
11-Sep-2012 ET |
2012 |
534 |
0 |
000q: P802.16q |
System Requirements on Interference Management for IEEE 802.16q Multi-tier Networks |
Wooram Shin (ETRI) |
13-Sep-2012 05:25:03 ET |
Download |
14-Sep-2012 ET |
2012 |
534 |
1 |
000q: P802.16q |
System Requirements on Interference Management for IEEE 802.16q Multi-tier Networks |
Wooram Shin (ETRI) |
14-Sep-2012 02:14:21 ET |
Download |
17-Sep-2012 ET |
2012 |
534 |
2 |
000q: P802.16q |
System Requirements on Interference Management for IEEE 802.16q Multi-tier Networks |
Wooram Shin (ETRI) |
17-Sep-2012 13:25:30 ET |
Download |
17-Sep-2012 ET |
2012 |
534 |
3 |
000q: P802.16q |
System Requirements on Interference Management for IEEE 802.16q Multi-tier Networks |
Wooram Shin (ETRI) |
17-Sep-2012 13:29:54 ET |
Download |
17-Sep-2012 ET |
2012 |
534 |
4 |
000q: P802.16q |
System Requirements on Interference Management for IEEE 802.16q Multi-tier Networks |
Wooram Shin (ETRI) |
17-Sep-2012 20:25:14 ET |
Download |
11-Sep-2012 ET |
2012 |
535 |
0 |
000n: P802.16n |
Clarification on power control for HR-MS to HR-MS direct communication in IEEE 802.16n |
Eunkyung Kim (ETRI) |
12-Sep-2012 21:25:11 ET |
Download |
11-Sep-2012 ET |
2012 |
536 |
0 |
010a: P802.16.1a |
Clarification on MAC control messages in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
12-Sep-2012 21:25:53 ET |
Download |
19-Sep-2012 ET |
2012 |
536 |
1 |
010a: P802.16.1a |
Clarification on MAC control messages in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
19-Sep-2012 15:25:30 ET |
Download |
11-Sep-2012 ET |
2012 |
537 |
0 |
010a: P802.16.1a |
Clarification on MAC control messages and ASN.1 coding for multicast in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
12-Sep-2012 21:26:39 ET |
Download |
12-Sep-2012 ET |
2012 |
538 |
0 |
010a: P802.16.1a |
Clarification on talk-around direct communication |
Seokki Kim, Sungcheol Channg, Miyoung Yun, Won-Ik Kim, Hyun Lee, Sungkyung Kim, Chulsik Yoon (ETRI) |
13-Sep-2012 08:13:35 ET |
Download |
12-Sep-2012 ET |
2012 |
539 |
0 |
010a: P802.16.1a |
Modification of synchronization channel pilot structure for talk-around direct communication |
Seokki Kim, Sungcheol Channg, Miyoung Yun, Won-Ik Kim, Hyun Lee, Sungkyung Kim, Chulsik Yoon (ETRI) |
13-Sep-2012 08:14:12 ET |
Download |
13-Sep-2012 ET |
2012 |
540 |
0 |
Smet: SG - Metrology |
Comments on IEEE 802.16-12-0483-00 |
Roger Marks (Consensii LLC; Mobile Pulse, Inc.) |
13-Sep-2012 00:39:20 ET |
Download |
19-Sep-2012 ET |
2012 |
540 |
1 |
Smet: SG - Metrology |
Comments on IEEE 802.16-12-0483-00 |
Roger Marks (Consensii LLC; Mobile Pulse, Inc.) |
19-Sep-2012 01:35:17 ET |
Download |
13-Sep-2012 ET |
2012 |
541 |
0 |
Smet: SG - Metrology |
Proposed Statement to IETF IPPM Working Group regarding IEEE Project 802.16.3 |
Roger Marks (Consensii LLC; Mobile Pulse, Inc.) |
13-Sep-2012 00:39:31 ET |
Download |
13-Sep-2012 ET |
2012 |
542 |
0 |
Smet: SG - Metrology |
Proposed Statement to Broadband Forum regarding IEEE Project 802.16.3 |
Roger Marks (Consensii LLC; Mobile Pulse, Inc.) |
13-Sep-2012 00:39:44 ET |
Download |
13-Sep-2012 ET |
2012 |
543 |
0 |
Shet: SG - HetNet |
Proposed Statement to External Organizations on IEEE 802.16 Activity regarding Small Cell Backhaul |
Roger Marks (Consensii LLC; Airspan Networks Inc.) |
13-Sep-2012 00:47:08 ET |
Download |
18-Sep-2012 ET |
2012 |
543 |
1 |
Shet: SG - HetNet |
Proposed Statement to External Organizations on IEEE 802.16 Activity regarding Small Cell Backhaul |
Roger Marks (Consensii LLC; Airspan Networks Inc.) |
18-Sep-2012 19:15:15 ET |
Download |
18-Sep-2012 ET |
2012 |
543 |
2 |
Shet: SG - HetNet |
Proposed Statement to External Organizations on IEEE 802.16 Activity regarding Small Cell Backhaul |
Roger Marks (Consensii LLC; Airspan Networks Inc.) |
18-Sep-2012 19:17:01 ET |
Download |
13-Sep-2012 ET |
2012 |
544 |
0 |
010a: P802.16.1a |
Collision resolution method in frame synchronization operation for TDC in IEEE 802.16.1a-D5 |
Hyun Lee, Miyoung Yun, Seokki Kim, Won-Ik Kim, Chulsik Yoon, Sungcheol Chang(ETRI) |
13-Sep-2012 03:46:46 ET |
Download |
13-Sep-2012 ET |
2012 |
545 |
0 |
010a: P802.16.1a |
ASN.1 coding for TDC MAC control messages in IEEE 802.16.1a-D5 |
Hyun Lee, Miyoung Yun, Seokki Kim, Won-Ik Kim, Sungkyung Kim, Chulsik Yoon, Sungcheol Chang(ETRI) |
13-Sep-2012 03:47:41 ET |
Download |
13-Sep-2012 ET |
2012 |
546 |
0 |
010a: P802.16.1a |
Clarification on Talk-around direct communication in IEEE 802.16.1-D5 |
Hyun Lee, Miyoung Yun, Seokki Kim, Won-Ik Kim, Sungkyung Kim, Chulsik Yoon, Sungcheol Chang(ETRI) |
13-Sep-2012 03:48:17 ET |
Download |
14-Sep-2012 ET |
2012 |
546 |
1 |
010a: P802.16.1a |
Clarification on Talk-around direct communication in IEEE 802.16.1-D5 |
Hyun Lee, Miyoung Yun, Seokki Kim, Won-Ik Kim, Sungkyung Kim, Chulsik Yoon, Sungcheol Chang(ETRI) |
14-Sep-2012 10:12:50 ET |
Download |
13-Sep-2012 ET |
2012 |
547 |
0 |
000q: P802.16q |
Proposal of system requirements for supporting massive MIMO in multi-tier networks |
Sangmin Oh (KAIST IT Convergence) |
13-Sep-2012 03:47:44 ET |
Download |
17-Sep-2012 ET |
2012 |
547 |
1 |
000q: P802.16q |
Proposal of system requirements for supporting massive MIMO in multi-tier networks |
Sangmin Oh (KAIST IT Convergence) |
17-Sep-2012 20:19:31 ET |
Download |
13-Sep-2012 ET |
2012 |
548 |
0 |
010a: P802.16.1a |
ASN.1 coding for control messages of multimode operation over IEEE 802.16.1a |
Won-Ik Kim (ETRI) |
13-Sep-2012 07:14:50 ET |
Download |
13-Sep-2012 ET |
2012 |
549 |
0 |
010a: P802.16.1a |
Clarification on MAC control message and Header for multimode operation over IEEE 802.16.1a |
Won-Ik Kim (ETRI) |
13-Sep-2012 07:20:22 ET |
Download |
19-Sep-2012 ET |
2012 |
549 |
1 |
010a: P802.16.1a |
Clarification on MAC control message and Header for multimode operation over IEEE 802.16.1a |
Won-Ik Kim (ETRI) |
19-Sep-2012 12:47:18 ET |
Download |
13-Sep-2012 ET |
2012 |
550 |
0 |
000n: P802.16n |
Clarification on MAC control messages for multimode operation over IEEE 802.16n |
Won-Ik Kim (ETRI) |
13-Sep-2012 07:25:36 ET |
Download |
18-Sep-2012 ET |
2012 |
550 |
1 |
000n: P802.16n |
Clarification on MAC control messages for multimode operation over IEEE 802.16n |
Won-Ik Kim (ETRI) |
18-Sep-2012 13:07:16 ET |
Download |
13-Sep-2012 ET |
2012 |
551 |
0 |
000n: P802.16n |
Clarification on multimode operation over IEEE 802.16n |
Seokjoo Shin (Chosun University) |
13-Sep-2012 07:32:34 ET |
Download |
13-Sep-2012 ET |
2012 |
552 |
0 |
010a: P802.16.1a |
Initial ranging for priority access in IEEE 802.16.1a |
Seokjoo Shin (Chosun University) |
13-Sep-2012 22:26:45 ET |
Download |
17-Sep-2012 ET |
2012 |
552 |
1 |
010a: P802.16.1a |
Initial ranging for priority access in IEEE 802.16.1a |
Seokjoo Shin (Chosun University) |
17-Sep-2012 16:30:00 ET |
Download |
19-Sep-2012 ET |
2012 |
552 |
2 |
010a: P802.16.1a |
Initial ranging for priority access in IEEE 802.16.1a |
Seokjoo Shin (Chosun University) |
19-Sep-2012 12:31:04 ET |
Download |
13-Sep-2012 ET |
2012 |
553 |
0 |
000n: P802.16n |
Initial ranging for priority access in IEEE 802.16n |
Seokjoo Shin (Chosun University) |
13-Sep-2012 22:27:27 ET |
Download |
17-Sep-2012 ET |
2012 |
553 |
1 |
000n: P802.16n |
Initial ranging for priority access in IEEE 802.16n |
Seokjoo Shin (Chosun University) |
17-Sep-2012 16:51:18 ET |
Download |
19-Sep-2012 ET |
2012 |
553 |
2 |
000n: P802.16n |
Initial ranging for priority access in IEEE 802.16n |
Seokjoo Shin (Chosun University) |
19-Sep-2012 12:30:38 ET |
Download |
13-Sep-2012 ET |
2012 |
554 |
0 |
010a: P802.16.1a |
ASN.1 coding for AAI-SCD message in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
13-Sep-2012 20:03:46 ET |
Download |
13-Sep-2012 ET |
2012 |
555 |
0 |
010a: P802.16.1a |
ASN.1 coding for AAI-DSx messages in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
13-Sep-2012 20:58:00 ET |
Download |
13-Sep-2012 ET |
2012 |
556 |
0 |
010a: P802.16.1a |
ASN.1 coding for AAI-SBC-REQ/RSP messages in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
13-Sep-2012 20:59:39 ET |
Download |
13-Sep-2012 ET |
2012 |
557 |
0 |
010a: P802.16.1a |
ASN.1 coding for handover messages in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
13-Sep-2012 21:02:43 ET |
Download |
19-Sep-2012 ET |
2012 |
557 |
1 |
010a: P802.16.1a |
ASN.1 coding for handover messages in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
19-Sep-2012 16:45:33 ET |
Download |
13-Sep-2012 ET |
2012 |
558 |
0 |
010a: P802.16.1a |
ASN.1 coding for AAI-ARS-CFG-CMD message in IEEE 802.16.1a |
Eunkyung Kim (ETRI) |
13-Sep-2012 21:04:09 ET |
Download |
14-Sep-2012 ET |
2012 |
559 |
0 |
Gdoc: Group Document |
IEEE P802.16n/D5 Sponsor Ballot Comments |
Roger Marks (IEEE 802.16 WG) |
14-Sep-2012 00:29:50 ET |
Download |